Active

Remote ID
1
By Anonymous (not verified) , 24 February 2026
PIDA Code
I.02.25.02
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
ICT
Subsector Name
Fibre Optic Cable
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
*** DISCLAIMER: Project information was not obtained. It will be inserted when project information becomes available. *** Construction of Cameroon section of the fibre optic link between Brazzaville and Yaounde.
Countries
Cameroon, Republic of Congo, Cameroon, Republic of Congo, Cameroon
Beneficiary Countries
Republic of Congo, Cameroon
REC
CEEAC-ECCAS
Stakeholders
Economic Community of Central African States
Cameroon Telecommunication
Email
ephremg@nepad.org
Latitude
3.000000
Longitude
12.718100
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.19.01
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Bridge
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
<p>The project aims to achieve a fixed link between the cities of Brazzaville in the Republic of Congo and Kinshasa in the Democratic Republic of Congo, by the construction of a mixed road and rail bridge on the Congo River at Maloukou Trechot.</p>
Description

<p>The project includes the construction of a road and rail bridge between Brazzaville in Congo and Kinshasa in the DRC. The project also includes road and rail links in both countries as well as joint border control points (One Stop Border Posts). A border control post will be located at each end of the bridge and will house border control officers. Inspections will only be conducted on one side of the river (i.e. on the departure side). The existing road infrastructure will be extended by 10km to connect the bridge to the two cities.</p>
<p>The railway bridge will have a total length of 1 575m and 10 bays divided as follows: 2 bays of 120m, 4 bays of 152m, 2 bays of 242m and two bays of 121.5m. The profile on the other side of the road consists of two unidirectional sidewalks with two lanes of 3m. The total width of the road, including sidewalks, is 16.24 m.</p>
<p>The two large cable-stayed spans (242m and 152m), located in the river along the banks, give the bridge a gateway to the capitals. The bridge will be located in Maloukou Trechot, 6km from the city of Maluku in Congo. The site is 55km from the two capitals along the river.</p>
<p>The bridge is part of a larger project, the Kinshasa-Ilebo railway project, which aims to improve the rail network in Africa. The larger project is expected to contribute to increased regional trade and accelerate regional integration between Central and Southern Africa. The project is expected to allow for cheaper and faster river crossing by passengers and freight. The beneficiaries of the project will therefore include the two countries whose fisci will benefit from increased trade, the increased presence of domestic and foreign companies in both countries, from private transporters and the economic and social benefits of liberated movement of both populations</p>

Capex Cost
459.00USD million
Preparation Cost
5.00
Operation Cost
9.18
Project Risk

<ul>
<li>Environmental Risks: Risk of pollution of the Congo River following accidents involving dangerous products, such as hydrocarbons.</li>
<li>Social risks: Displacement of populations in road linkage areas; who live, own property or engage in commercial activities on the site. The control of the development of human settlements following the construction of the bridge.</li>
</ul>

Countries
Democratic Republic of Congo, Republic of Congo, Democratic Republic of Congo, Republic of Congo, Cameroon, Democratic Republic of Congo, Gabon, Republic of Congo
Beneficiary Countries
Democratic Republic of Congo, Republic of Congo
Stakeholders
African Development Fund
African Union Development Agency
Common Market for Eastern and Southern Africa
DRC - Government of Democratic Republic of Congo
DRC - Government of Democratic Republic of Congo
Economic Community of Central African States
NEPAD Infrastructure Project Preparation Facility
Republic of Congo - Délégation Générale des Grands Travaux
Southern African Development Community
African Development Fund
DRC - Government of Democratic Republic of Congo
NEPAD Infrastructure Project Preparation Facility
Start Date
Date Created Raw
Updated Date
Latitude
-4.290000
Longitude
15.273700
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.19.01
Project Status
Active
Project Stage
Feasibility
Completion Percentage
0
Sector Name
Transport
Subsector Name
Bridge
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Construction of Brazzaville-Kinshasa Road/Rail Bridge (Republic of Congo and DRC).
Description

<p>The project involves the construction of a road and rail bridge between Brazzaville in Congo and Kinshasa in DRC. Related to this project is the construction of an OSBP, as well as the construction of railway from Kinshasa to Ilebo.</p>

Capex Cost
2,004.00USD million
Preparation Cost
200.00
Operation Cost
0.00
Project Risk

<ul><li> - Environmental Risks, - Social Risks; <br /> - unability of funding; - Other External Risks: Not Reported</li></ul>

Countries
Democratic Republic of Congo, Republic of Congo, Democratic Republic of Congo, Republic of Congo, Democratic Republic of Congo, Republic of Congo
Beneficiary Countries
Democratic Republic of Congo, Republic of Congo
REC
CEEAC-ECCAS
Stakeholders
Economic Community of Central African States
Republic of Congo - Délégation Générale des Grands Travaux
Email
ephremg@nepad.org
Updated Date
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.19.02
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Border Post
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Construction of Brazzaville/Kinshasa One-Stop Border Post between Congo and DRC, which lies on the Pointe Noire- Brazzaville- Kinshasa- Bangui- N"ℱDjamena Corridor.
Description

<p>The project involves the construction of a One Stop Border Post between Congo and DRC. Related to this project is the construction of a road/rail bridge between Brazzaville and Kinshasa.</p>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Democratic Republic of Congo, Republic of Congo, Democratic Republic of Congo, Republic of Congo, Democratic Republic of Congo, Republic of Congo
Beneficiary Countries
Democratic Republic of Congo, Republic of Congo
REC
CEEAC-ECCAS
Stakeholders
Republic of Congo - Délégation Générale des Grands Travaux
Economic Community of Central African States
International Organisation for Migration
Email
egetahun@outlook.com
Start Date
Date Created Raw
Updated Date
Latitude
-4.300000
Longitude
15.276900
By Anonymous (not verified) , 24 February 2026
PIDA Code
I.02.11.04
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
ICT
Subsector Name
Fibre Optic Cable
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
*** DISCLAIMER: Project information was not obtained. It will be inserted when project information becomes available. *** Construction of DRC section of fibre optic link between Brazzaville and Kinshasa.
Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Democratic Republic of Congo, Angola, Democratic Republic of Congo, Gabon, Republic of Congo, Angola, Democratic Republic of Congo, Gabon, Republic of Congo
Beneficiary Countries
Angola, Democratic Republic of Congo, Gabon, Republic of Congo
Email
ephrem.hailu@giz.de
Start Date
Date Created Raw
Updated Date
Latitude
-4.310000
Longitude
15.279200
By Anonymous (not verified) , 24 February 2026
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
ICT
Subsector Name
Fibre Optic Cable
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Deploy a subriver cable between the 2 most closest capital cities in the world (Brazzaville and Kinshasa separated just by the Congo river) with a broadband connectivity Fibre Optic Cable.
Description

<p>Deploy a subriver cable between the 2 most closest capital cities in the world (Brazzaville and Kinshasa separated just by the Congo river) with a broadband connectivity Fibre Optic Cable.</p>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Democratic Republic of Congo, Republic of Congo, Democratic Republic of Congo, Republic of Congo, Democratic Republic of Congo, Republic of Congo
Beneficiary Countries
Democratic Republic of Congo, Republic of Congo
REC
SADC
Stakeholders
Southern African Development Community
DRC - Ministry of Post
Telecommunication and ICT
Email
ephrem.hailu@giz.de
Start Date
Date Created Raw
Updated Date
By Anonymous (not verified) , 24 February 2026
PIDA Code
I.02.11.03
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
ICT
Subsector Name
Fibre Optic Cable
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
*** DISCLAIMER: Project information was not obtained. It will be inserted when project information becomes available. *** Construction of Congo section of fibre optic link between Brazzaville and Kinshasa.
Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Republic of Congo, Democratic Republic of Congo, Republic of Congo, Democratic Republic of Congo, Republic of Congo
Beneficiary Countries
Democratic Republic of Congo, Republic of Congo
REC
SADC
Stakeholders
Southern African Development Community
Email
gah-thew@sadc.int
Start Date
Date Created Raw
Updated Date
Latitude
-4.290000
Longitude
15.271500
By Anonymous (not verified) , 24 February 2026
PIDA Code
I.02.10.01
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
ICT
Subsector Name
Fibre Optic Cable
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
*** DISCLAIMER: Project information was not obtained. It will be inserted when project information becomes available. *** Construction of Congo section of the fibre optic link between Brazzaville and Bangui.
Countries
Republic of Congo, Republic of Congo, Central African Republic, Republic of Congo, Central African Republic
Beneficiary Countries
Republic of Congo, Central African Republic
REC
CEEAC-ECCAS
Stakeholders
Economic Community of Central African States
Email
ephremg@nepad.org
Latitude
-0.360000
Longitude
16.564200
By Anonymous (not verified) , 24 February 2026
PIDA Code
I.02.10.02
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
ICT
Subsector Name
Fibre Optic Cable
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
*** DISCLAIMER: Project information was not obtained. It will be inserted when project information becomes available. *** Construction of Central African Republic section of the fibre optic link between Brazzaville and Bangui.
Countries
Central African Republic, Republic of Congo, Central African Republic, Republic of Congo, Central African Republic
Beneficiary Countries
Republic of Congo, Central African Republic
REC
CEEAC-ECCAS
Stakeholders
Economic Community of Central African States
Orange
Email
ephremg@nepad.org
Latitude
4.230000
Longitude
18.242500
By Anonymous (not verified) , 24 February 2026
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Road
Reference Plan
PIDA PAP 2
On SDM
Off
Summary
This stretch is part of the trans-Maghrebin highway that stretches 80 km from bousalem (Wilaya de Jandouba) to the borders with Algeria.
Description

<p>This stretch is part of the trans-Maghrebin highway that stretches 80 km from bousalem (Wilaya de Jandouba) to the borders with Algeria.</p><p>The project serves an existing infrastructure asset of another sector, but there is more than 50% overlap in the geography serviced by the proposed project and the other sector existing asset.</p><p>Existing East-West Highway of Algeria A3 Tunisia Highway<br></p><p><br></p>

Capex Cost
805.00USD million
Preparation Cost
80.50
Operation Cost
40.30
Countries
Tunisia
REC
UMA-AMU
Stakeholders
African Union Development Agency
Arab Maghreb Union
Email
egetahun@outlook.com
Start Date
Date Created Raw
Updated Date