Summary
<p>"The project will be done in two phases. Phase-I will constitute the construction of a petroleum jetty and oil terminal facilities to handle 3.38 million metric tons per annum (MMTPA). The additional facilities for Phase-II would handle up to 6.46 MMTPA of petroleum products.
The dedicated petroleum jetty would be constructed at water depth of around 23 metres. The approach trestle would be of length some 765 metres and would accommodate tankers, each of size up to 150,000 DWT at Albion.
The oil terminal would have storage capacity 430,000 m3 in Phase-I and additional 335,000 m3 in Phase-II, i.e. overall 765,000 m3. The numbers and capacities of tanks have been worked out for both phases based on annual trading volume from the proposed terminal and also considering the capacities of the import and export tankers."</p>
Description
<p>"The project will be done in two phases. Phase-I will constitute the construction of a petroleum jetty and oil terminal facilities to handle 3.38 million metric tons per annum (MMTPA). The additional facilities for Phase-II would handle up to 6.46 MMTPA of petroleum products.
The dedicated petroleum jetty would be constructed at water depth of around 23 metres. The approach trestle would be of length some 765 metres and would accommodate tankers, each of size up to 150,000 DWT at Albion.
The oil terminal would have storage capacity 430,000 m3 in Phase-I and additional 335,000 m3 in Phase-II, i.e. overall 765,000 m3. The numbers and capacities of tanks have been worked out for both phases based on annual trading volume from the proposed terminal and also considering the capacities of the import and export tankers."</p>