<span [removed]: normal; font-variant-ligatures: normal; font-variant-caps: normal; font-weight: 500; letter-spacing: normal; orphans: 2; text-align: left; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px; -webkit-text-stroke-width: 0px; background-color: rgb(255, 255, 255); text-decoration-thickness: initial; text-decoration-style: initial; text-decoration-color: initial; display: inline !important; float: none;">It is suggested that the first stage of the track to be Egypt - Sudan electrical grid with a path of length of about 2200 km from Cairo (Egypt) to Khartoum and Gedaref (Sudan) parallel to the continental road by establishing two circuits with a HVDC of 1000 kV (or a mixture of alternating current (AC) and direct current (DC) solutions of 800 kV, according to the results of technical and economic feasibility studies).</span><br>
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
Energy
Subsector Name
Hydro Power Plant
Reference Plan
PIDA PAP 2
On SDM
Off
Summary
TBD
Description
Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Egypt, Egypt, Egypt, Sudan
Beneficiary Countries
Egypt
Stakeholders
African Union Development Agency
Email
nguena.kitio1996@gmail.com
Start Date
Date Created Raw
Updated Date