Fomi Multi-purpose Dam (Niger River Basin)

By Anonymous (not verified) , 24 February 2026
PIDA Code
W.02.01
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Water
Subsector Name
Multi-purpose Reservoir
Alternative Names
Niger River Basin Management Project
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
The construction of a multipurpose dam that will include the expansion of irrigation of agriculture and the supply of 90 to 100 MW of hydropower that would be connected to the West Africa Power Pool (WAPP). The project will preserve the ecosystem of the Niger River Basin, generating electricity, developing irrigated agriculture, fish farming and river transport.
Description

<p>Construction of a dam and hydroelectric plant of 90 MW on the Niandan River in Guinea with a reservoir of about 5 billion m3 of water.</p>

<p>The project has two components, namely:<br />
- Strengthen the institutional and financial capacity of the Niger Basin Authority (NBA) to sustainably fulfill its basic mandate; and<br />
- Facilitate evidence-based decision-making in the process of preparing Fomi&#39;s multipurpose dams and in parallel strengthening of ABN&#39;s capabilities through its direct involvement in this complex project.</p>

<p>The Fomi Dam initiative has been continued in two related projects:<br />
First, an APL-1 project on water resources development and sustainable ecosystem management (WRD SEM) funded by the World Bank (P093806) and secondly, the Niger River Basin Management Project. It is unclear if the APL-1 project is still active through a follow-up phase which might likely be named APL-2.<br />
The Niger River Basin Management Project was approved for CIWA funding in November 2014 and aims to strengthen the NBA&#39;s capacity to prepare for Fomi in two phases, namely:<br />
a) facilitate dialogue between stakeholders in Guinea, Mali and the NBA to develop a roadmap on how to proceed with the preparation of the Fomi dam project; and<br />
b) Complementary studies to the main preparatory studies supported by WRD SEM (APL-1).</p>

Capex Cost
0.00USD million
Preparation Cost
7.50
Operation Cost
0.00
Project Risk

<ul><li>Displacement of approximately 45,000 people. Encroachment of part of the wetland (Ramzar and Upper Niger National Park).</li><li>An Environmental and Social Management Plan (ESMP) and an Involuntary Resettlement Plan (IRP) are recommended to mitigate the negative impacts of the project - Environmental Category B</li></ul>

Countries
Guinea, Guinea, Guinea, Mali, Niger, Nigeria
Beneficiary Countries
Guinea
REC
ECOWAS-CEDEAO
Stakeholders
Economic Community of West African States
Guinea Ministry of Environment and Energy
Guinea - Ministère de l'Énergie et de l'Hydraulique
World Bank
Global Water Partnership
Email
ephrem.hailu@giz.de
Start Date
Date Created Raw
Updated Date
Latitude
10.520000
Longitude
-9.715310