Construction of Hillacondji/Sanveekondji One-Stop Border Post between Togo and Benin, with Hillacondji on the Benin side and Sanveekondji on the side of Togo. The OSBP lies on the Abidjan- Lagos Corridor.
Description
<p>Construction of Hillacondji/Sanveekondji One-Stop Border Post between Togo and Benin. This is a Joint Border Control Facility for border control officials from Benin and Togo to jointly undertake border control formalities to reduce border crosing time for goods and persons. OSBT: Straddling.</p>
Capex Cost
14.00USD million
Preparation Cost
3.00
Operation Cost
0.00
Project Risk
<ul><li> Socio-Environmental Classification: C - minimal social and environmental impacts </li></ul>