Inga 3 Transmission Interconnector

By Anonymous (not verified) , 24 February 2026
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
Energy
Subsector Name
Hydro Power Plant
Reference Plan
PIDA PAP 2
On SDM
Off
Summary
TBD
Description

The project involves conducting the feasibility studies in respect of the design, development, operation and maintenance of a High Voltage Direct Current ("HVDC") transmission scheme that will deliver 5000 MW of electricity to South Africa in terms of the Inga 3 Low Head Project (the "Feasibility Study". The HVDC transmission scheme will traverse through Zambia, Zimbabwe and/or Botswana ("Transit Countries"). The feasibility study will deal with matters related to, amongst others, land rights, land development, environmental authorisation and commercial arrangements. The Feasibility Studies will be conducted on the Transit Countries, DRC and RSA;

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Botswana, Democratic Republic of Congo, South Africa, Zambia, Zimbabwe, Democratic Republic of Congo, Botswana, Democratic Republic of Congo, Eswatini, Lesotho, Mozambique, Namibia, South Africa, Zambia, Zimbabwe
Beneficiary Countries
Democratic Republic of Congo
Stakeholders
African Union Development Agency
Email
nguena.kitio1996@gmail.com
Start Date
Date Created Raw
Updated Date