Libyan Alternate Freeway

By Anonymous (not verified) , 24 February 2026
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Road
Reference Plan
PIDA PAP 2
On SDM
Off
Summary
1750 km of dual freeway road designed of 2x3 lanes with extra emergency lane in each direction. The design was done according to the modern international of highway standards. The project design includes also all necessary services areas that are allocated on both sides of the Motorway. Such service area will provide all basic needs to the passengers and travelers including motels, patrol stations, shops & cafeterias as well as other services such as maintenance utilities. The number and sizes of these service stations are extendable to meet all future demands.
Description

1750 km of dual freeway road designed of 2x3 lanes with extra emergency lane in each direction. The design was done according to the modern international of highway standards. The project design includes also all necessary services areas that are allocated on both sides of the Motorway. Such service area will provide all basic needs to the passengers and travelers including motels, patrol stations, shops & cafeterias as well as other services such as maintenance utilities. The number and sizes of these service stations are extendable to meet all future demands.

Capex Cost
7,000.00USD million
Preparation Cost
700.00
Operation Cost
350.00
Countries
Algeria, Egypt, Libya, Mauritania, Morocco, Tunisia, Algeria, Egypt, Libya, Mauritania, Morocco, Tunisia, Algeria, Egypt, Libya, Mauritania, Morocco, Tunisia
Beneficiary Countries
Algeria, Egypt, Libya, Mauritania, Morocco, Tunisia
Stakeholders
African Union Development Agency
Arab Maghreb Union
Common Market for Eastern and Southern Africa
Email
egetahun@outlook.com
Start Date
Date Created Raw
Updated Date