Libyan Alternative Freeway

By Anonymous (not verified) , 24 February 2026
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
Transport
Subsector Name
Road
Reference Plan
PIDA PAP 2
On SDM
Off
Summary
<p>1750 km of dual carriageway designed as 2x3 lanes with emergency lane in each each direction. The design was to modern international internat for freeway standards. The project design also includes all the necessary service service areas on both sides of the on both sides of the motorway.the freeway. This service area provide all the basic needs of passengers and passengers and travellers, including motels, patrol stations, stores and cafeterias, as well as well as other services such as maintenance services. The number and size of these service stations expandable to meet all futurefuture demands.</p>
Description

<p>The northern part of Libya that links the Libyan western border zone with Tunis to the Libyan eastern border zone with Egypt. 1750 Km and it is expected that a reasonable portion of UMA and Egypt populations will be using this freeway for all transportation purposes. The project design was carried out according to the AASHTO international standards. </p>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Algeria, Egypt, Libya, Mauritania, Morocco, Tunisia
Start Date
Date Created Raw
Longitude
-0.000001