<p>The governments of the Democratic Republic of Congo (DRC) and the Republic of Zambia signed an Intergovernmental Memorandum of Understanding (IGMOU) on 9 July 2015 for the joint development of generation projects in the Luapula River Basin and for a new power interconnector between the two countries. The national power utilities of the two countries entered into specific memoranda of understandings for the development of the generation projects and for the power interconnector respectively. The Inter Utility Memorandum of Understanding for the power interconnector was also signed on 9 July 2015.</p><p>The Luapula River was initially investigated for hydropower development by the Zambian Government in 1976 during which time five sites indicated below were established and investigated. Later in 2001, ZESCO LTD confirmed the potential of over 1188MW of which more than 773MW is firm capacity. However, previous project development plans were constrained because the development plans were only coordinated from one country despite the location of the river being on the border.</p><p>The project serves a planned infrastructure asset of another sector, but there is more than 50% overlap in the geography serviced by the proposed project and the other sector planned asset.<br></p>
Project Stage
Construction
Completion Percentage
0
Sector Name
Energy
Subsector Name
Hydro Power Plant
Reference Plan
PIDA PAP 2
On SDM
Off
Summary
The governments of the Democratic Republic of Congo (DRC) and the Republic of Zambia signed an Intergovernmental Memorandum of Understanding (IGMOU) on 9 July 2015 for the joint development of generation projects in the Luapula River Basin and for a new power interconnector between the two countries. The national power utilities of the two countries entered into specific memoranda of understandings for the development of the generation projects and for the power interconnector respectively. The Inter Utility Memorandum of Understanding for the power interconnector was also signed on 9 July 2015.
Description
Capex Cost
3,600.00USD million
Preparation Cost
396.00
Operation Cost
180.00
Countries
Democratic Republic of Congo, Zambia, Democratic Republic of Congo, Zambia, Botswana, Eswatini, Lesotho, Mozambique, Namibia, South Africa
Beneficiary Countries
Democratic Republic of Congo, Zambia
REC
SADC
Stakeholders
Southern African Development Community
Southern African Power Pool
Email
egetahun@outlook.com
Start Date
Date Created Raw
Updated Date