Description
<p>This is a 98km at 220kV, identified as one of the least cost transmission project during development of the 2009 Tanzania Power System Master Plan and the East African Community Power System Master Plan.</p>
<p> </p>
<p>This is a 98km at 220kV, identified as one of the least cost transmission project during development of the 2009 Tanzania Power System Master Plan and the East African Community Power System Master Plan.</p>
<p> </p>
<p>Not available</p>