Ntem River Bridge

By Anonymous (not verified) , 24 February 2026
PIDA Code
T.21.02
Project Status
Active
Project Stage
Construction
Completion Percentage
1
Sector Name
Transport
Subsector Name
Bridge
Alternative Names
Kribi-Campo Bata Road and Bridge Linkages
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
The project concerns the design of a bridge over the Ntem River along the Kribi-Campo-Bata multinational road axis to connect the Kribi-Campo and Campo-Bata road sections. This will be along the Yaounde-Bata-Brazzaville corridor, facilitating linkages between Cameroon and Equatorial Guinea.
Description

<p>The study of the Ntem River Bridge is part of the Kribi-Campo-Bata maritime route linking the port of Kribi to Cameroon and Bata in Equatorial Guinea. The inter-capital connections study will identify missing links and determine the technical and economic feasibility of the construction of a crossing structure and the development of a single border control post at the border of Cameroon and Equatorial Guinea. It will make technical, legal and financial recommendations for the management and operation of the Yaounde-Kribi-Bata-Libreville development and corridor.</p>

Capex Cost
0.00USD million
Preparation Cost
4.01
Operation Cost
0.00
Countries
Cameroon, Equatorial Guinea, Cameroon, Equatorial Guinea, Cameroon, Equatorial Guinea, Gabon
Beneficiary Countries
Cameroon, Equatorial Guinea
REC
CEEAC-ECCAS
Stakeholders
Economic Community of Central African States
Cameroon - Direction Générale des Grands Travaux: Direction des Routes
Equatorial Guinea - Ministère de la Communication
African Development Bank
NEPAD Infrastructure Project Preparation Facility
Email
ephrem.hailu@giz.de
Updated Date
Latitude
2.350000
Longitude
9.825300