Nyakarara - Mwaro - Mweya -Gitega (RN18) Road Upgrade

By Anonymous (not verified) , 24 February 2026
PIDA Code
T.08.03.01
Project Status
Active
Project Stage
Construction
Completion Percentage
1
Sector Name
Transport
Subsector Name
Road
Alternative Names
Lot1: Nyakararo-Mwaro-Kibumbu (26 km)
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
The national road 18: Nyakararo-Mwaro-Gitega (56 km) is a missing link of the Central Corridor Bujumbura-Mwaro-Gitega-Kobero (Burundi)/Kabanga-Dodoma-Dar Es Salaam (Tanzania).
Until 2015, the road was still in gravel. From 2016, it is being upgraded and widened from 6m to 7m. The first lot: Nyakararo-Mwaro-Kibumbu (26 km) is completed. The remaining lot: Kibumbu-Mweya-Gitega will also be upgraded with AfDB funds.
Description

<p>RN18 is a 56km road on the Central Corridor along the RN7- RN18- RN16 route and is a conduit for movement of traffic from Tanzania to Gitega and Bujumbura. RN18 requires upgrading from gravel to asphalt concrete and expansion of the carriageway from 6 metres to 7 metres.</p>

Capex Cost
50.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Burundi, Burundi, Burundi
Beneficiary Countries
Burundi
REC
EAC
Stakeholders
Central Corridor Transit Transport Facilitation Agency
DRC - Le bureau des Routes
Burundi Ministry of Transport
Public Works and Equipment
East African Community
Email
ephrem.hailu@giz.de
Updated Date
Latitude
-3.480000
Longitude
29.776400