Operationalisation of the São Tomé and Príncipe hydrometric stations
By Anonymous (not verified), 24 February 2026
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
Water
Alternative Names
Not available
Reference Plan
PIDA PAP 2
On SDM
Off
Summary
<p>São Tomé and Príncipe has 12 automatic hydrometric stations, which require in-depth maintenance for their effective operation. Taking into account the climate change that has devastated the country, there is a need to adapt and mitigate the impacts that could cause flood and river overflow, and be resilient, through operationalization of hydrometric station for issuing alerts and management of watersheds.</p>
Description
<p>São Tomé and Príncipe has 12 automatic hydrometric stations, which require in-depth maintenance for their effective operation. Taking into account the climate change that has devastated the country, there is a need to adapt and mitigate the impacts that could cause flood and river overflow, and be resilient, through operationalization of hydrometric station for issuing alerts and management of watersheds.</p>
Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Project Risk
<p>Climate changes</p>