<p>In the desire of the United Nations system to support African countries, a framework has been developed to support the implementation of priority programs of the New Partnership for Africa's Development (NEPAD). This is how, at the level of Central Africa, the Sub-Regional Mechanism for Coordinating the support of the United Nations System to the African Union. and its NEPAD program in Central Africa (MSRC/ AC) was created in 2009. This mechanism provides for a regular meeting to evaluate the actions and measures carried out or carried out by the various United Nations structures in support for institutions and Central African integration programs. The evaluation report of the second Joint Indicative Program (JIP-2) of the Subregional Coordination Mechanism (MSRC) to support the implementation of the AU/NEPAD Program in Central Africa highlighted two major difficulties: 1. Poor selection and preparation of projects and, 2. Poor coordination of the implementation ofprograms/projects. An analysis of these two difficulties shows that they are the consequences of two root causes: 1. Insufficient mastery and practice of the Logical Framework Approach and, 2. Insufficient mastery and practice of program/project life cycle management .</p>
Project Status
Active
Project Stage
Feasibility
Completion Percentage
0
Sector Name
ICT
Subsector Name
Fibre Optic Cable
Alternative Names
Capacity Building Project ECCAS techniques in matters approach to the logical framework, strategic framework development strategic framework development project.
Reference Plan
PIDA PAP 2
On SDM
Off
Summary
<p>The general objective of the project is, by 2030, to significantly improve material, economic integration and socio-economic of the Member States of ECCAS in particular and of Africa in general. The achievement of this objective will result in the fact that by 2025, more than 90% of valid PACDICE-AC project ideas have passed the phase identification (Studies of pre-feasibility), with more than 50% of these projects already completed or in progress of achievement.</p>
Description
Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
-1.00
Project Risk
<p>- lets pass, at the level of the indicative programming, "ideas "project" invalid; - born do not submit project ideas valid for an examination pre-feasibility (identification); - does not base feasibility studies (formulation) on the conclusions of identification; - proceeds to financing without having studied the project in detail during the study feasibility; - neglects to control during the execution of the project, the way it achieves or does not achieve its objectives, and make the necessary decisions Consequently ; - fails to redirect the very design of the project, including understood its objectives, if that proves necessary in light of its evaluation.</p>
Countries
Rwanda, Equatorial Guinea, Democratic Republic of Congo, Republic of Congo, Chad, Gabon, Sao Tome and Principe, Burundi, Central African Republic, Angola, Cameroon
Start Date
Date Created Raw
Latitude
4.410000
Longitude
13.055400