ZiZaBoNa Transmission Interconnector (Victoria Falls - Livingstone section)

By Anonymous (not verified) , 24 February 2026
PIDA Code
E.02.07.04
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Energy
Subsector Name
Power Interconnector
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Construction of the Victoria Falls to Livingstone cross-border link of the ZiZaBoNa transmission interconnector, i.e. Zimbabwe-Zambia-Botswana-Namibia.
Description

<p>ZiZaBoNa creates a new Western Transmission Corridor in Southern Africa, by linking the power systems of Zimbabwe, Zambia, Botswana and Namibia. This part of the project involves the construction of a transmission interconnector from Victoria Falls Substation (Zimbabwe) to Livingstone Substation (Zambia) , with a transmission capacity of 300 MW.</p>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Zambia, Zimbabwe, Botswana, Namibia, Zambia, Zimbabwe, Botswana, Namibia, Zambia, Zimbabwe
Beneficiary Countries
Botswana, Namibia, Zambia, Zimbabwe
Email
ephrem.hailu@giz.de
Start Date
Date Created Raw
Updated Date
Latitude
-17.890000
Longitude
25.846200