225 kV C么te d'Ivoire
- Liberia - Sierra Leone - Guinea Interconnection Project

By Anonymous (not verified) , 15 February 2026
PIDA Code
E.08.01.04
Project Status
Active
Project Stage
Project Structuring
Completion Percentage
1
Sector Name
Energy
Subsector Name
Power Interconnector
Alternative Names
225 kV WAPP CLSG
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Construction of a 225 kV, double circuit steel lattice tower overhead transmission line of appromiximately 1,304 km, 10 new Substations (4 in Liberia, 5 in Sierra Leone, 1 in Guinea and extension of the 225 kV Man Substation in CA麓te d"鈩voire), installation of Static Var Compensators at five substations, development of WAPP Control Area Centre in Guinea and the extension of the national Control Centre in CA麓te d"鈩voire for supervision of the transmission line, setting up of a Regional SCADA System and frequency control systems.
Description

This project forms part of the  priority projects  identified in the ECOWAS Master Plan for the Generation and Transmission of Electrical Energy and shall interconnect  Sierra Leone, Liberia and Guinea to the nine already interconnected countries.

Capex Cost
549.30USD million
Preparation Cost
11.46
Operation Cost
0.00
Project Risk
  • Delay in the project implementation
  • Delay in payment of compensation to project affected persons
Countries
C么te d'Ivoire, Guinea, Liberia, Sierra Leone, C么te d'Ivoire, Guinea, Liberia, Sierra Leone
REC
ECOWAS-CEDEAO
Stakeholders
West Africa Power Pool
CLSG Regional Transmission Company
C么te d'Ivoire - Soci茅t茅 des 脡nergies de C么te d'Ivoire
Guinea - La Soci茅t茅 脡lectricit茅 de Guin茅e
Sierra Leone - Electricity Distribution and Supply Authority
Liberia Electricity Corporation
Economic Community of West African States
EU-Africa Partnership on Infrastructure
World Bank
African Development Bank
World Bank
KfW Development Bank
European Investment Bank
Email
ephrem.hailu@giz.de
Start Date
Date Created Raw
Updated Date
Latitude
8.190000
Longitude
-10.173300