Inter-Governmental Authority on Development (IGAD)

By Anonymous (not verified) , 24 February 2026
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
Transport
Subsector Name
Railway
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
LAPSSET Standard Gauge Railways (SGR) is the fourth key component of the corridor. It will start from Lamu to lsiolo and then branches at lsiolo to South Sudan and lsiolo to Ethiopia while another section will run from Nairobi to lsiolo, and the latter would bridge LAPSSET corridor and Northern corridor. The costs for construction of LAPSSET Corridor Railway and procurement of rolling stocks are estimated at approximately US$ 7,100 million comprising of civil works US$ 3,480 million, tracks US$ 1,200 million, rolling stock US$ 1,220 million, signal and telecom US$ 520 million, buildings and other infrastructure USD$ 300 million.. The railway has overall ElRR of 15.6% for all sections combined and is above the threshold of 12% thus feasible.

Feasibility study and preliminary engineering designs of LAPSSET Standard Gauge Railway were completed. So far, bilateral agreements were signed between Kenya and Ethiopia and South Sudan in respect to this railway development. Ethiopia is currently undertaking the development of its side Moyale-Addis Ababa in three different stages.
- Construction of Addis Ababa-Modjo section of about 120 km part of the Addis-Djibouti railway is complete
- Pre-Feasibility study has been completed for Modjo-Hawassa-Moyale section, and funding being sought to undertake feasibility and preliminary design.
Description

<p>LAPSSET Standard Gauge Railways (SGR) is the fourth key component of the corridor. It will start from Lamu to lsiolo and then branches at lsiolo to South Sudan and lsiolo to Ethiopia while another section will run from Nairobi to lsiolo, and the latter would bridge LAPSSET corridor and Northern corridor. The costs for construction of LAPSSET Corridor Railway and procurement of rolling stocks are estimated at approximately US$ 7,100 million comprising of  civil works US$ 3,480 million, tracks US$ 1,200 million, rolling stock US$ 1,220 million, signal and telecom US$ 520 million, buildings and other infrastructure USD$ 300 million.. The railway has overall ElRR of 15.6% for all sections combined and is above the threshold of 12% thus feasible.</p>

<p>Feasibility study and preliminary engineering designs of LAPSSET Standard Gauge Railway were completed. So far, bilateral agreements were signed between Kenya and Ethiopia and South Sudan in respect to this railway development. Ethiopia is currently undertaking the development of its side Moyale-Addis Ababa in three different stages.</p>

<ul>
<li>Construction of Addis Ababa-Modjo section of about 120 km part of the Addis-Djibouti railway is complete</li>
<li>Pre-Feasibility study has been completed for Modjo-Hawassa-Moyale section, and funding being sought to undertake feasibility and preliminary design. </li>
</ul>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Kenya, South Sudan, Kenya, South Sudan, Kenya, South Sudan
Beneficiary Countries
Kenya, South Sudan
REC
IGAD
Stakeholders
South Sudan Ministry of Telecommunications and Postal Service
Inter-Governmental Authority on Development (IGAD)
Kenya Ministry of Information Communication and Technology
Email
DavidN@nepad.org
Start Date
Date Created Raw
By Anonymous (not verified) , 24 February 2026
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Water
Subsector Name
Multi-purpose Reservoir
Reference Plan
PIDA PAP 2
On SDM
Off
Summary
<p>The Angololo Water Resources Development Project (AWDP) is located on the transboundary Malaba River shared by Kenya and Uganda and falls within the Sio-Malaba Malakisi (SMM) River Basin of the Nile Basin. The project is located at coordinates 0.693243&Acirc;&deg;N, 34.306400&Acirc;&deg;E. The project consists of a proposed 30 m high dam with a reservoir capacity of 43.0 MCM and hydropower generation capacity of 1.75 MW. The dam will supply potable water to 20,000 people and irrigate 3,300 hectares (1,180 ha in Kenya and 2,120 ha in Uganda). The project also includes rehabilitation of the 430 km2 watershed upstream of the dam. In total the Angololo Water Resources Development Project is expected to benefit at least 127,300 people from Tororo, Manafwa, and Namisindwa districts in Eastern Uganda and Busia and Bungoma Counties in Kenya through employment creation, irrigated agriculture, piped water supply, hydropower generation, and livestock and fisheries production.</p>
<p>The Angololo project was identified by Kenya and Uganda in collaboration with NELSAP-CU under the Sio Malaba Malakisi (SMM) River Basin Management (RBM) project. NELSAP-CU conducted its prefeasibility studies in 2010 with grant financing from the Royal Government of Sweden and the Royal Government of Norway. Feasibility studies (including detailed designs, ESIA and RAP studies and stakeholder engagement) commenced in 2019 with a US$ 1.5 million grant from NEPAD-IPPF and are expected to reach completion in 2021.</p>
Capex Cost
67.00USD million
Preparation Cost
1.58
Operation Cost
0.00
Countries
Kenya, Uganda, Kenya, Uganda, Kenya, Uganda
Beneficiary Countries
Kenya, Uganda
Stakeholders
Nile Basin Initiative
Nile Equatorial Lakes Subsidiary Action Program
East African Community
Inter-Governmental Authority on Development (IGAD)
Start Date
Date Created Raw
Updated Date
By Anonymous (not verified) , 24 February 2026
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
Transport
Subsector Name
Road
Alternative Names
Rihaid AlBirdi - Um Dafuq
Reference Plan
PIDA PAP 2
On SDM
Off
Summary
<p>Construction of 128.3 km road from Rihaid El Birdi in Sudan to Om Dafug on the Republic of Central Africa boarder. </p>
Description

<p>New construction of 128.3 km from Rihaid El Birdi in Sudan to Om Dafug on the Republic of Central Africa boarder.</p>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Project Risk

<p>Not available</p>

Countries
Central African Republic, Sudan
Stakeholders
Sudan - Government of Sudan
Inter-Governmental Authority on Development (IGAD)
Common Market for Eastern and Southern Africa
Communauté des États sahélo-sahariens
Start Date
Date Created Raw
Latitude
10.420000
Longitude
23.416600
By Anonymous (not verified) , 24 February 2026
Project Status
Active
Project Stage
Feasibility
Completion Percentage
0
Sector Name
ICT
Subsector Name
Fibre Optic Cable
Alternative Names
Nadapal – Juba Fibre Optic (part of the project)
Reference Plan
PIDA PAP 2
On SDM
Off
Summary
<p>Construction of a high capacity Optic Fibre Cable (OFC) from Eldoret(Kenya) to Juba (South Sudan) through the Nadapal border town.</p>
Description

<p>Fibre Cable (OFC) from Eldoret(Kenya) to Juba (South Sudan) through the Nadapal border town. Laying of the new Eastern Africa Regional Transport, Trade and Development Facilitation Program (EARTTDFP) FON (main cable</p>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Revenue Model
<p>NA</p>
Project Risk

<p>NA</p>

Countries
Uganda, Ethiopia, South Sudan, Kenya, South Sudan, Kenya, South Sudan, Kenya
Beneficiary Countries
Uganda, Ethiopia, South Sudan, Kenya
REC
IGAD
Stakeholders
South Sudan Ministry of Telecommunications and Postal Service
Kenya Ministry of Information Communication and Technology
Inter-Governmental Authority on Development (IGAD)
Start Date
Date Created Raw
Updated Date
Latitude
0.510000
Longitude
35.272500
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.07.01
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Road
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Joint design standards for modern rail transport corridor infrastructure (with PPP) (including Trade and Transport Facilitation) on the Djibouti Corridor.
Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Stakeholders
Inter-Governmental Authority on Development (IGAD)
Inter-Governmental Authority on Development (IGAD)
Email
ephrem.hailu@giz.de
Updated Date
Latitude
10.240000
Longitude
40.934800
By Anonymous (not verified) , 24 February 2026
PIDA Code
E.01.01
Project Status
Active
Project Stage
Feasibility
Completion Percentage
0
Sector Name
Energy
Subsector Name
Hydro Power Plant
Alternative Names
Millennium Dam
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
<p>Construction of the Grand Ethiopean Renaissance Dam (GERD) with a 6000 MW hydropower facility on the Blue Nile river in the Benshangul Gumuz region of Ethiopia.</p>
<p> </p>
Description

<p>The Grand Ethiopian Renaissance Dam (GERD ) formerly known as the Millennium Dam and sometimes referred to as Hidase Dam, is a gravity dam on the Blue Nile River in Ethiopia currently under construction. It is in the Benishangul-Gumuz Region of Ethiopia, about 40 km east of the border with Sudan. At 6,000 MW, the dam will be the largest hydroelectric power plant in Africa when completed, as well as the 8th largest in the world. The reservoir at 72&Acirc; billion cubic meters will be one of the continent's largest. According to the Ethiopian government, as of June&Acirc; &Acirc; 2017, the Dam is 60% complete.</p>
<p> </p>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Project Risk

<ul>
<li>Environmental Risks: Not Reported Social Risks: Not Reported Socio-Enviro Classification: Not Reported Other External Risks: Not Reported</li>
</ul>

Countries
Ethiopia, Ethiopia, Egypt, Ethiopia, Sudan
Beneficiary Countries
Ethiopia
Stakeholders
Common Market for Eastern and Southern Africa
Eastern Africa Power Pool
Ethiopian Electricity Power Cooperation
Nile Basin Initiative
Inter-Governmental Authority on Development (IGAD)
Email
egetahun@outlook.com
Start Date
Date Created Raw
Updated Date
Latitude
11.220000
Longitude
35.093800
By Anonymous (not verified) , 24 February 2026
PIDA Code
E.02.02.01
Project Status
Stall
Project Stage
Feasibility
Completion Percentage
0
Sector Name
Energy
Subsector Name
Power Interconnector
Alternative Names
GERD-Rabak
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
<p>Construction of the Ethiopia section of the 580km / 500 kV Ethiopia to Sudan transmission interconnector. The project comprises a power transmission interconnector between Ethiopia and Sudan, including 580km of new 500kV transmission lines, of which approximately 16km will be in Ethiopia, starting at the Grand Ethiopia Renaissance Dam (GERD).</p>
<p> </p>
Description

<p>Construction of a transmission line (580 km / 500 kV) that connects the power networks of Ethiopia and Sudan to facilitate trading in electricity and promote power systems stability. The interconnector will have a transmission capacity of 3000 MW.</p>
<p>The Project also includes two new, 500kV capacitated substations at Rabak and Jebel Aulia (both in Sudan), and power line bay&Acirc; extensions at the following existing substations: Grand Renaissance (500kV Ethiopia), Rabak&Acirc; (220kV, Sudan) and Jebel Aulia (220kV, Sudan).&Acirc; </p>
<p>Construction of a 500kV transmission line and the associated substations that connects the power networks of Ethiopia and Sudan to facilitate trading in electricity and promote power systems stability. The line will be 580 km in total, 564 km in Sudan, terminating in Khartoum, 16 km in Ethiopia, terminating at the Grand Renaissance Dam. The Project also includes two new, 500 kV capacitated substations at Rabak and Jebel Aulia (both in Sudan), and power line bay extensions at the following existing substations: Grand Renaissance (500kV Ethiopia), Rabak (220kV, Sudan) and Jebel Aulia (220kV, Sudan).</p>
<p>It is expected that the project would assist the two partners to obtain the following specific benefits: to promote power system stability in the countries concerned; to promote energy connectivity among the countries by assisting them to integrate their respective networks and thereby develop ability for building larger power projects to meet larger regional markets; to develop ability to negotiate better terms for procurement of power equipment and technical assistance; to reduce the cost of power in both countries; in the long term, complete integration of the power systems in Egypt and Sudan; and to create productive employment and economic development across the borders. The main objectives of the project include provision of transmission capacity to cater for grid interconnection between Egypt and Sudan, provision of transmission infrastructure to cater for future grid interconnections to other countries, promotion of regional cooperation through sharing of power generation resources and facilitation of rural electrification and improve the standard of living for the population in project areas</p>
<p> </p>
<p> </p>
<p> </p>

Capex Cost
29,030,000.00USD million
Preparation Cost
186.00
Operation Cost
290,300.00
Project Risk

<ul>
<li>Environmental Risk: Potential impact during the construction and operational phases relating to biodiversity and ecosystems (including avifauna), material use as it impacts on soil and groundwater recharge as well as solid waste and wastewater pollution impact on water bodies</li>
<li>Socio-economic Risk: Potential impact during the construction and operational phases relating to quality of air and dust emissions, noise and other nuisance as well as the impact on tourism and cultural heritage due to visual and aesthetic impacts. Resettlement necessary for project-affected communities. Furthermore, possible adverse community health and safety effects from electromagnetic fields.</li>
<li>Construction Risk: A comprehensive set of risks have been identified, including potential degradation and damage of the existing structures including any archaeological materials and terrain due to excavation,</li>
<li>Operation Risk: Collision of birds with conductors, permanent interference between the project and local habitats as well as air emissions from maintenance equipment.</li>
</ul>
<p>The Feasibility Study highlights two sets of project-related risks in the ESMP, namely construction risk and operation risk. - adverse physical and/or economic impacts, temporary or permanent displacement, as well as temporary or permanent loss of assets, facilities or access to resource such as crops, woodlots, grazing lands, wells, businesses and services, etc. Among the risks identified, the Project considered the social risk of resettlement as being particularly serious</p>
<p> </p>

Countries
Ethiopia, Ethiopia, Sudan, Ethiopia, Sudan
Beneficiary Countries
Ethiopia, Sudan
Stakeholders
Common Market for Eastern and Southern Africa
Eastern Africa Power Pool
Ethiopia - Government of Ethiopia
Ethiopian Electricity Power Cooperation
Ethiopian Minister of Water
Irrigation and Electricity
Nile Basin Initiative
Sudan - Government of Sudan
Inter-Governmental Authority on Development (IGAD)
Eastern Nile Technical Regional Office - ENTRO
Start Date
Date Created Raw
Updated Date
Latitude
15.600000
Longitude
32.535600
By Anonymous (not verified) , 24 February 2026
PIDA Code
E.02.02.02
Project Status
Stall
Project Stage
Feasibility
Completion Percentage
0
Sector Name
Energy
Subsector Name
Power Interconnector
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
<p>Implementation of Sudan section of the 500 kV Ethiopia to Sudan transmission interconnection line and the associated high voltage substations based on the conclusions of the final feasibility. The Project comprises a power transmission interconnector between Ethiopia and Sudan, including 580km of new 500kV transmission lines, of which approximately 564km will be in Sudan, terminating in Khartoum.</p>
Description

<p> Construction of a 500 kV transmission line and the associated substations that connects the power networks of Ethiopia and Sudan to facilitate trading in electricity and promote power systems stability. The Project also includes two new, 500 kV capacitated substations at Rabak and Jebel Aulia (both in Sudan), and power line bay extensions at the following existing substations: Grand Renaissance (500kV Ethiopia), Rabak (220kV, Sudan) and Jebel Aulia (220kV, Sudan).</p>
<p> </p>

Capex Cost
484,940.00USD million
Preparation Cost
186.00
Operation Cost
29.03
Project Risk

<ul>
<li>Environmental Risk: Potential impact during the construction and operational phases relating to biodiversity and ecosystems (including avifauna), material use as it impacts on soil and groundwater recharge as well as solid waste and wastewater pollution impact on water bodies</li>
<li>Socio-economic Risk: Potential impact during the construction and operational phases relating to quality of air and dust emissions, noise and other nuisance as well as the impact on tourism and cultural heritage due to visual and aesthetic impacts. Resettlement necessary for project-affected communities. Furthermore, possible adverse community health and safety effects from electromagnetic fields.</li>
<li>Construction Risk: A comprehensive set of risks have been identified, including potential degradation and damage of the existing structures including any archaeological materials and terrain due to excavation,</li>
<li>Operation Risk: Collision of birds with conductors, permanent interference between the project and local habitats as well as air emissions from maintenance equipment.</li>
</ul>
<p>The Feasibility Study highlights two sets of project-related risks in the ESMP, namely construction risk and operation risk. - adverse physical and/or economic impacts, temporary or permanent displacement, as well as temporary or permanent loss of assets, facilities or access to resource such as crops, woodlots, grazing lands, wells, businesses and services, etc. Among the risks identified, the Project considered the social risk of resettlement as being particularly serious</p>
<p> </p>

Countries
Sudan, Ethiopia, Sudan, Ethiopia, Sudan
Beneficiary Countries
Ethiopia, Sudan
Stakeholders
Common Market for Eastern and Southern Africa
Eastern Africa Power Pool
Ethiopia - Government of Ethiopia
Nile Basin Initiative
Sudan - Government of Sudan
Sudan Ministry of Water Resources
Irrigation and Electricity
Inter-Governmental Authority on Development (IGAD)
Eastern Nile Technical Regional Office - ENTRO
Start Date
Date Created Raw
Updated Date
Latitude
15.500000
Longitude
32.555700
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.10.02.02
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Road
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Upgrading of 640 km of single carriageway road from Eldoret to Nadapal (Kenya).
Description

The project involves the upgrading of the 640 km road from Eldoret to Nadapal, the border with South Sudan.

Capex Cost
683.00USD million
Preparation Cost
68.00
Operation Cost
0.00
Project Risk

<ul><li> Environmental Risks: Not Reported Social Risks: Not Reported Socio-Enviro Classification: Not Reported Other External Risks: Not Reported</li></ul>

Countries
Kenya, Kenya, Kenya, South Sudan
Beneficiary Countries
Kenya
REC
IGAD
Stakeholders
Kenya - Government of Kenya
Inter-Governmental Authority on Development (IGAD)
International Development Association - World Bank Group
Kenya National Highways Authority
LAPSSET Corridor Development Authority (LCDA)
Kenya - Government of Kenya
International Development Association - World Bank Group
Email
ephrem.hailu@giz.de
Start Date
Date Created Raw
Updated Date
Latitude
2.460000
Longitude
34.967800
By Anonymous (not verified) , 24 February 2026
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
Transport
Subsector Name
Road
Reference Plan
PIDA PAP 2
On SDM
Off
Summary
<p>New construction of 328 km road from El Fasher (Sudan) to El Geneina (Sudan) and upgrading of 21km road from El Geneina to Adri on Chad border.</p>
Description

<p>New construction of 328 km from El Fasher (Sudan) to El Geneina (Sudan) and upgrading of 21km from El Geneina to Adri on Chad border promoting transit-Trade between the countries of the region.</p>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Sudan, Chad
Stakeholders
Sudan - Government of Sudan
Inter-Governmental Authority on Development (IGAD)
Common Market for Eastern and Southern Africa
Communauté des États sahélo-sahariens
Start Date
Date Created Raw
Latitude
13.450000
Longitude
22.468200