Mozambique - Caminhos de Ferro de Mocambique

By Anonymous (not verified) , 24 February 2026
PIDA Code
T.09.02.03
Project Status
Completed
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Railway
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Rehabilition of railway between Sena and Limbe (Mozambique).
Description

<p>The Sena line runs from Limbe (going through Chiromo where the railway line crosses the Shire River, where the culvert has been washed away and Nsanje) to Marka, the border between Malawi and Mozambique.</p>

Capex Cost
156.00USD million
Preparation Cost
0.30
Operation Cost
0.00
Project Risk

<ul><li> Environmental Risks: Not Reported Social Risks: Not Reported Socio-Enviro Classification: Not Reported Other External Risks: Not Reported</li></ul>

Countries
Mozambique, Mozambique, Mozambique
Beneficiary Countries
Mozambique
Stakeholders
Southern African Development Community
Mozambique - Caminhos de Ferro de Mocambique
Common Market for Eastern and Southern Africa
Mozambique - Ministério dos Transportes e Comunicações
Email
ephrem.hailu@giz.de
Start Date
Date Created Raw
Updated Date
Latitude
-16.710000
Longitude
35.236000
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.09.02.01
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Railway
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
*** DISCLAIMER: Project information is incomplete. It will be updated regularly as revisions become available. ***Modernisation of Nacala and Beira Rail Systems (Mozambique).
Description

<p>The Nacala Railway Corridor Project will transport approximately 18 million tons of coal, derived from the expansion of Moatize Mine (Mozambique) through a railway system connecting the existing mine in Moatize to a new coal terminal in Nacala Velha (Mozambique). The project was funded by Vale, and has the potential of being developed into a transport corridor for Mozambique&#39;s Tete Province, and potentially Zambia and the Democratic Republic of Congo (DRC). The railway line is located in the north-western region of Mozambique, starting at Moatize in the Tete Province, going through Malawi and connecting to the existing railway network at Nkaya Junction. From here the route follows the exisitng alignment through Entre Lagos, Cuamba and Nampula. Finally, in the region of Monapo, the railway follows a new route up to the new coal terminal at Nacala Velha. Aurecon previously developed FEL 1, 2 and 3 (Front End Loading) studies for the development of the corridor. The Detail Design (FEL4), included the design of the entire railway line and its associated infrastructure from the mine loadout station to the car dumper at the proposed new port terminal at Nacala Velha. The railway line is designed for a 20.5t axle load. Apart from providing an export conduit for the client, the rail corridor will have direct- and indirect social benefits to the larger community in terms of job creation, improved mobility (passenger train services) and the economic development of the region.</p>

Capex Cost
3,500.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Project Risk

<ul><li> Environmental Risks: Not Reported Social Risks: Not Reported Socio-Enviro Classification: Not Reported Other External Risks: Not Reported</li></ul>

Countries
Mozambique, Mozambique, Mozambique
Beneficiary Countries
Mozambique
REC
SADC
Stakeholders
Southern African Development Community
Mozambique - Caminhos de Ferro de Mocambique
VALE
Rio Tinto
Beacon Hill Resources
Mozambique - Ministério dos Transportes e Comunicações
Email
ephrem.hailu@giz.de
Start Date
Date Created Raw
Updated Date
Latitude
-14.540000
Longitude
40.672000
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.11.02
Project Status
Completed
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Port
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
 Construction of new coal terminal at Nacala Port (Mozambique)
Description

<p>The Nacala Railway Corridor Project will transport approximately 18 million tons of coal, derived from the expansion of Moatize Mine (Mozambique) through a railway system connecting the existing mine in Moatize to a new coal terminal in Nacala Velha (Mozambique). The project was funded by Vale, and has the potential of being developed into a transport corridor for Mozambique&#39;s Tete Province, and potentially Zambia and the Democratic Republic of Congo (DRC). The coal terminal will have the capacity to handle 30 million tons per annum.</p>

Capex Cost
1,500.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Project Risk

<ul><li> Environmental Risks: Not Reported Social Risks: Not Reported Socio-Enviro Classification: Not Reported Other External Risks: Not Reported</li></ul>

Countries
Mozambique, Mozambique, Mozambique
Beneficiary Countries
Mozambique
REC
SADC
Stakeholders
Southern African Development Community
Mozambique - Caminhos de Ferro de Mocambique
Rio Tinto
VALE
Mozambique - Ministério dos Transportes e Comunicações
Email
ephrem.hailu@giz.de
Start Date
Date Created Raw
Updated Date
Latitude
-14.480000
Longitude
40.687800
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.11.03
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Port
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
*** DISCLAIMER: Project information was not obtained. It will be inserted when project information becomes available. *** Expansion of Nacala Port container terminal (Mozambique).
Description

<p>Expansion of Nacala Port container terminal (Mozambique) to accommodate 600 000 TEUs per annum.</p>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Mozambique, Mozambique, Mozambique
Beneficiary Countries
Mozambique
REC
SADC
Stakeholders
Southern African Development Community
Mozambique - Caminhos de Ferro de Mocambique
Mozambique - Ministério dos Transportes e Comunicações
Email
ephrem.hailu@giz.de
Start Date
Date Created Raw
Updated Date
Latitude
-14.450000
Longitude
40.688500
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.11.06
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Port
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
*** DISCLAIMER: Project information is incomplete. It will be updated regularly as revisions become available. ***Rehabilitation and Dredging of Maputo and Matola Port (Mozambique)
Description

<p>Expansion of the Maputo port, including the dredging of the port from its current 9,4 m draught to 11 m to accommodate the larger Panamax vessels, which will improve the port"’s competitiveness in terms of bulk and container traffic, and expansion of the coal terminal.</p>

Capex Cost
1,700.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Project Risk

<ul><li> Environmental Risks: Not Reported Social Risks: Not Reported Socio-Enviro Classification: Not Reported Other External Risks: Not Reported</li></ul>

Countries
Mozambique, Mozambique, Mozambique
Beneficiary Countries
Mozambique
REC
SADC
Stakeholders
Southern African Development Community
Mozambique - Caminhos de Ferro de Mocambique
Mozambique - Ministério dos Transportes e Comunicações
Email
ephrem.hailu@giz.de
Start Date
Date Created Raw
Updated Date
Latitude
-26.060000
Longitude
32.665800
By Anonymous (not verified) , 24 February 2026
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
Transport
Subsector Name
Railway
Alternative Names
Not available
Reference Plan
PIDA PAP 2
On SDM
Off
Summary
<p>The railway section is about 1,000 km running from Mtwara Port at the Indian Ocean to Mbambabay/ (Ameliabay) in Lake Nyasa with Spurs connecting to Mineral fields of Mchuchuma coal and Liganga iron ore mines in the south west of Tanzania. </p>
Description

<p>The railway section is about 1,000 km running from Mtwara Port at the Indian Ocean to Mbambabay/ (Ameliabay) in Lake Nyasa with Spurs connecting to Mineral fields of Mchuchuma coal and Liganga iron ore mines in the south west of Tanzania. </p>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Project Risk

<p>Not available</p>

Countries
Zimbabwe, Malawi, Mozambique, Tanzania
Beneficiary Countries
Malawi, Mozambique, Tanzania
Stakeholders
Zimbabwe - National Railways of Zimbabwe
Mozambique - Caminhos de Ferro de Mocambique
Zambia Railways
Zimbabwe - National Railways of Zimbabwe
Start Date
Date Created Raw
Latitude
-11.880000
Longitude
43.872200
By Anonymous (not verified) , 24 February 2026
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
Transport
Subsector Name
Railway
Alternative Names
Not available
Reference Plan
PIDA PAP 2
On SDM
Off
Summary
<p>The railway section is about 1,000 km running from Mtwara Port at the Indian Ocean to Mbambabay/ (Ameliabay) in Lake Nyasa with Spurs connecting to Mineral fields of Mchuchuma coal and Liganga iron ore mines in the south west of Tanzania. </p>
Description

<p>The railway section is about 1,000 km running from Mtwara Port at the Indian Ocean to Mbambabay/ (Ameliabay) in Lake Nyasa with Spurs connecting to Mineral fields of Mchuchuma coal and Liganga iron ore mines in the south west of Tanzania. </p>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Project Risk

<p>Not available</p>

Countries
Tanzania, Malawi, Zimbabwe, Mozambique
Beneficiary Countries
Malawi, Zimbabwe, Mozambique
Stakeholders
Tanzania Railway Corporation
Mozambique - Caminhos de Ferro de Mocambique
Zimbabwe - National Railways of Zimbabwe
Zambia Railways
Start Date
Date Created Raw
Latitude
-11.880000
Longitude
43.872200
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.11.05
Project Status
Completed
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Port
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Dedging of Beira Port (Mozambique)
Description

<p>Dredging of the 40 km entrance channel to the port of Beira.</p>

Capex Cost
65.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Project Risk

<ul><li> Environmental Risks: Not Reported Social Risks: Not Reported Socio-Enviro Classification: Not Reported Other External Risks: Not Reported</li></ul>

Countries
Mozambique, Mozambique, Mozambique
Beneficiary Countries
Mozambique
REC
SADC
Stakeholders
Southern African Development Community
Mozambique - Caminhos de Ferro de Mocambique
European Development Fund
Mozambique - Ministério dos Transportes e Comunicações
European Development Fund
Email
ephrem.hailu@giz.de
Start Date
Date Created Raw
Updated Date
Latitude
-19.820000
Longitude
34.837000
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.11.04
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Port
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
The project aims to construct a new coal terminal at Beira Port in Mozambique which will handle 10 million tons per annum.
Description

<p>The project involves the construction of a new coal terminal at Beira port. A 50 ha site has been set aside for this purpsoe. The terminal is intended to process export coal mined by Brazilian group Vale and Anglo-Australian group Rio Tinto.</p>

Capex Cost
200.00USD million
Preparation Cost
3.05
Operation Cost
0.00
Countries
Mozambique, Mozambique, Mozambique
Beneficiary Countries
Mozambique
REC
SADC
Stakeholders
Southern African Development Community
Mozambique - Caminhos de Ferro de Mocambique
Rio Tinto
VALE
Mozambique - Ministério dos Transportes e Comunicações
Email
ephrem.hailu@giz.de
Start Date
Date Created Raw
Updated Date
Latitude
-19.820000
Longitude
34.835900
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.09.02.02.01
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Railway
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Rehabilitation of the 317 km and upgrade the actual capacity from 1.5 to 3 MTA of Beira-Machipanda section of the railway line between the port of Beira in Mozambique and Machipanda; a town in Mozambique, near the border with Zimbabwe. This project is a part of the greater Machipanda- Harare railway upgrade.
Description

<p>Reconstruction of the cargo and passenger transport system on the Beira-Machipanda railway line, linking the provinces of Sofala and Manica to neighbouring Zimbabwe, via the Machipanda border post, will once again allow people and goods to travel, particularly rural workers along the Beira corridor. This section of railway is of particular importance to Mozambique as it is expected to offer greater dynamism to the strategy of linking different development hubs in the country and neighbouring regions, and improve efficiency in transporting passengers and cargo between points along the railway.</p>

Capex Cost
0.00USD million
Preparation Cost
3.60
Operation Cost
0.00
Countries
Mozambique, Mozambique, Zimbabwe, Mozambique, Zimbabwe
Beneficiary Countries
Mozambique, Zimbabwe
REC
SADC
Stakeholders
Southern African Development Community
Mozambique - Caminhos de Ferro de Mocambique
Mozambique - Ministério dos Transportes e Comunicações
Email
ephrem.hailu@giz.de
Start Date
Date Created Raw
Updated Date
Latitude
-19.380000
Longitude
33.783100