Economic Community of Central African States

By Anonymous (not verified) , 24 February 2026
PIDA Code
T.08.03.09
Project Status
Active
Project Stage
Construction
Completion Percentage
1
Sector Name
Transport
Subsector Name
Road
Alternative Names
Lot1: Kalundu port-Uvira-Luberizi (50 km)
Reference Plan
PIDA PAP 1
On SDM
On
Summary
Uvira-Bukavu road is an important missing link of the Central Corridor: Dar Es Salaam Port - Kigoma (Rail) - Kalundu Port (Lake Tanganyika) - Uvira - Bukavu (Road).
Upgrading of this missing link will facilitate trade and transport between Tanzania, Democratic Republic of Congo (DRC), Burundi and Rwanda. The road links two important lakes named Lake Tanganyika and Lake Kivu.
Description

Upgrading of the access road to the Port of Kigoma (Tanzania) by the Lake Tanganyika.

Capex Cost
0.00USD million
Preparation Cost
0.50
Operation Cost
0.00
Project Risk

<ul><li>None at this stage</li></ul>

Countries
Democratic Republic of Congo, Burundi, Democratic Republic of Congo, Rwanda, Tanzania, Burundi, Democratic Republic of Congo, Rwanda, Tanzania
Beneficiary Countries
Burundi, Democratic Republic of Congo, Rwanda, Tanzania
REC
CEEAC-ECCAS
Stakeholders
DRC - Roads Authority
Central Corridor Transit Transport Facilitation Agency
NEPAD Infrastructure Project Preparation Facility
Economic Community of Central African States
Central Corridor Transit Transport Facilitation Agency
NEPAD Infrastructure Project Preparation Facility
Email
ephrem.hailu@giz.de
Updated Date
Latitude
-2.960000
Longitude
29.010600
By Anonymous (not verified) , 24 February 2026
PIDA Code
W.01.01
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Water
Subsector Name
Multi-purpose Reservoir
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Construction of an Oubangui flow control dam to allow river navigation between Bangui and Congo and the Democratic Republic of Congo (DRC); in the Congo River Basin, and electricity production to supply Bangui and surrounding areas in the DRC and Congo.
Improve the navigability of Obangui River with an added hydropower component.
Description

<p>The project aims to provide solutions to the problems of interruption of navigation on Oubangui River, tributary of the Congo River in the region of Central Africa. This is particularly the case during periods of low water levels, and the supply of electricity to the Central African Republic (CAR), North Congo and the Congo. DRC, through the construction of a Oubangui flow control and power generation dam at the Palambo site, is about 60 km upstream from Bangui.</p>

<p>The characteristics of the scenario chosen among the solutions proposed by SOGREAH in 1990 were as follows:</p>

<ul>
<li>Normal retention rating of 361 m;</li>
<li>Height of the dam of approximately 18 m;</li>
<li>Area of 606 x106 m 2;</li>
<li>Length of approximately 1,200 m;</li>
<li>Minimum downstream flow to reach at Zinga, about 70 km downstream from Bangui of 920 m3 / s;</li>
<li>Storage volume of 2,370 million m3;</li>
<li>Power generation of 30 MW;</li>
<li>Number of groups of 4 bulbs (unit flow: 94 m3 / s).</li>
</ul>

Capex Cost
0.00USD million
Preparation Cost
3.00
Operation Cost
0.00
Project Risk

Mobilization of finances to carry out the studies of: Summary preliminary project (APS), Final preliminary project (APD), Tender dossier (DAO)

Countries
Central African Republic, Democratic Republic of Congo, Central African Republic, Democratic Republic of Congo, Central African Republic, Democratic Republic of Congo
Beneficiary Countries
Central African Republic, Democratic Republic of Congo
REC
CEEAC-ECCAS
Stakeholders
Central African Economic and Monetary Community
Economic Community of Central African States
Global Water Partnership
Lake Chad Basin Commission
Zambia - Ministry of Water Development
Sanitation and Environmental Protection
Email
christine.razanamahandry@gmail.com
Start Date
Date Created Raw
Updated Date
Latitude
4.660000
Longitude
18.918100
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.20.02.01
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Border Post
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Construction of the KoussA©rA© One-Stop Border Post between Cameroon and Chad, which lies on the Douala- Bangui- Douala- N"™Djamena Corridor.
Description

<p>The project involves the construction of the Kousséré One-Stop Border Post between Cameroon and Chad, on the Douala-Bangui Douala-N Djamena Multimodal Transport Corridor.</p>

Capex Cost
110.00USD million
Preparation Cost
1.00
Operation Cost
0.00
Countries
Cameroon, Chad, Cameroon, Chad, Cameroon, Chad
Beneficiary Countries
Cameroon, Chad
REC
CEEAC-ECCAS
Stakeholders
African Development Fund
Central African Economic and Monetary Community
Economic Community of Central African States
Email
egetahun@outlook.com
Start Date
Date Created Raw
Updated Date
Latitude
12.070000
Longitude
15.036100
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.20.01
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Road
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Development of joint standards for modern corridor road design (with PPP) (including Trade and Transport Facilitation) on Douala-Bang
Description

<p>Development of joint standards for modern corridor road design (with PPP) (including Trade and Transport Facilitation) on Douala-Bang</p>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Stakeholders
Economic Community of Central African States
Economic Community of Central African States
Email
ephrem.hailu@giz.de
Updated Date
Latitude
0.000000
Longitude
0.000000
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.13.01
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Road
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
*** DISCLAIMER: Project information was not obtained. It will be inserted when project information becomes available. *** Development of joint standards for modern road corridor design (with PPP) (including Trade and Transport Facilitation) on Dakar-Bamak
Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Stakeholders
Economic Community of Central African States
Economic Community of Central African States
Email
ephrem.hailu@giz.de
Updated Date
Latitude
0.000000
Longitude
0.000000
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.18.01
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Port
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
*** DISCLAIMER: Project information was not obtained. It will be inserted when project information becomes available. *** Joint standards for modern corridor river transport infrastructure design (with PPP) (including Trade and Transport Facilitation) in
Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Stakeholders
Economic Community of Central African States
Economic Community of Central African States
Email
ephrem.hailu@giz.de
Updated Date
Latitude
0.000000
Longitude
0.000000
By Anonymous (not verified) , 24 February 2026
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
ICT
Alternative Names
Not available
Reference Plan
PIDA PAP 2
On SDM
Off
Summary
<p>The project envisages the implementation of six Data Centers in Burundi, Central African Republic, Sao Tome, Chad, Equatorial Guinea, Gabon- and the reinforcement of five &ndash;Angola, Republic of Congo, Cameroun, Rwanda, Democratic Republic of Congo.</p>
<pre id="tw-target-text" class="tw-data-text tw-text-large tw-ta" dir="ltr" style="font-size: 28px; line-height: 36px; background-color: #f8f9fa; border: none; padding: 2px 0.14em 2px 0px; position: relative; margin-top: -2px; margin-bottom: -2px; resize: none; font-family: inherit; overflow: hidden; width: 270px; text-wrap: wrap; overflow-wrap: break-word; color: #1f1f1f;" data-placeholder="Translation" aria-label="Translated text" data-ved="2ahUKEwiOz5G44fGHAxWKUEEAHU1CHnkQ3ewLegQIBxAU"><span class="Y2IQFc" lang="en" style="font-size: 12pt;">This project aims to provide the ECCAS subregional space with
infrastructures which participate in the securing cyberspace and help create trust in a world increasingly
digital and to guarantee the
digital sovereignty of States.</span></pre>
Description

<p>The project envisages the implementation of six Data Centers in Burundi, Central African Republic, Sao Tome, Chad, Equatorial Guinea, Gabon- and the reinforcement of five &ndash;Angola, Republic of Congo, Cameroun, Rwanda, Democratic Republic of Congo.</p>
<pre id="tw-target-text" class="tw-data-text tw-text-large tw-ta" dir="ltr" style="font-size: 28px; line-height: 36px; background-color: #f8f9fa; border: none; padding: 2px 0.14em 2px 0px; position: relative; margin-top: -2px; margin-bottom: -2px; resize: none; font-family: inherit; overflow: hidden; width: 270px; text-wrap: wrap; overflow-wrap: break-word; color: #1f1f1f;" data-placeholder="Translation" aria-label="Translated text" data-ved="2ahUKEwiOz5G44fGHAxWKUEEAHU1CHnkQ3ewLegQIBxAU"><span class="Y2IQFc" lang="en"><span style="font-size: 12pt;">This project aims to provide the ECCAS subregional space with
infrastructures which participate in the securing cyberspace and
help create trust in a world increasingly digital and to guarantee the digital sovereignty of States.</span></span></pre>
<p> </p>

Capex Cost
0.00USD million
Preparation Cost
92,500,000.00
Operation Cost
0.00
Project Risk

<p>Not available</p>

Countries
Burundi, Central African Republic, Sao Tome and Principe, Chad, Equatorial Guinea, Angola, Democratic Republic of Congo, Cameroon, Rwanda
Beneficiary Countries
Angola, Democratic Republic of Congo, Cameroon, Rwanda
REC
CEEAC-ECCAS
Stakeholders
Angola - Government of Angola
Burundi - Government of Burundi
Gabon - Ministère de l’Équipement
des Infrastructures et de l’Aménagement du Territoire
Ethiopian Revenues and Customs Authority
Autoridade Geral de Regulação
Cameroon Telecommunication
Economic Community of Central African States
Lake Chad Basin Commission
Rwanda - Government of Rwanda
Start Date
Date Created Raw
Latitude
0.400000
Longitude
9.445060
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.19.01
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Bridge
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
<p>The project aims to achieve a fixed link between the cities of Brazzaville in the Republic of Congo and Kinshasa in the Democratic Republic of Congo, by the construction of a mixed road and rail bridge on the Congo River at Maloukou Trechot.</p>
Description

<p>The project includes the construction of a road and rail bridge between Brazzaville in Congo and Kinshasa in the DRC. The project also includes road and rail links in both countries as well as joint border control points (One Stop Border Posts). A border control post will be located at each end of the bridge and will house border control officers. Inspections will only be conducted on one side of the river (i.e. on the departure side). The existing road infrastructure will be extended by 10km to connect the bridge to the two cities.</p>
<p>The railway bridge will have a total length of 1 575m and 10 bays divided as follows: 2 bays of 120m, 4 bays of 152m, 2 bays of 242m and two bays of 121.5m. The profile on the other side of the road consists of two unidirectional sidewalks with two lanes of 3m. The total width of the road, including sidewalks, is 16.24 m.</p>
<p>The two large cable-stayed spans (242m and 152m), located in the river along the banks, give the bridge a gateway to the capitals. The bridge will be located in Maloukou Trechot, 6km from the city of Maluku in Congo. The site is 55km from the two capitals along the river.</p>
<p>The bridge is part of a larger project, the Kinshasa-Ilebo railway project, which aims to improve the rail network in Africa. The larger project is expected to contribute to increased regional trade and accelerate regional integration between Central and Southern Africa. The project is expected to allow for cheaper and faster river crossing by passengers and freight. The beneficiaries of the project will therefore include the two countries whose fisci will benefit from increased trade, the increased presence of domestic and foreign companies in both countries, from private transporters and the economic and social benefits of liberated movement of both populations</p>

Capex Cost
459.00USD million
Preparation Cost
5.00
Operation Cost
9.18
Project Risk

<ul>
<li>Environmental Risks: Risk of pollution of the Congo River following accidents involving dangerous products, such as hydrocarbons.</li>
<li>Social risks: Displacement of populations in road linkage areas; who live, own property or engage in commercial activities on the site. The control of the development of human settlements following the construction of the bridge.</li>
</ul>

Countries
Democratic Republic of Congo, Republic of Congo, Democratic Republic of Congo, Republic of Congo, Cameroon, Democratic Republic of Congo, Gabon, Republic of Congo
Beneficiary Countries
Democratic Republic of Congo, Republic of Congo
Stakeholders
African Development Fund
African Union Development Agency
Common Market for Eastern and Southern Africa
DRC - Government of Democratic Republic of Congo
DRC - Government of Democratic Republic of Congo
Economic Community of Central African States
NEPAD Infrastructure Project Preparation Facility
Republic of Congo - Délégation Générale des Grands Travaux
Southern African Development Community
African Development Fund
DRC - Government of Democratic Republic of Congo
NEPAD Infrastructure Project Preparation Facility
Start Date
Date Created Raw
Updated Date
Latitude
-4.290000
Longitude
15.273700
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.19.02
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Border Post
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Construction of Brazzaville/Kinshasa One-Stop Border Post between Congo and DRC, which lies on the Pointe Noire- Brazzaville- Kinshasa- Bangui- N"™Djamena Corridor.
Description

<p>The project involves the construction of a One Stop Border Post between Congo and DRC. Related to this project is the construction of a road/rail bridge between Brazzaville and Kinshasa.</p>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Democratic Republic of Congo, Republic of Congo, Democratic Republic of Congo, Republic of Congo, Democratic Republic of Congo, Republic of Congo
Beneficiary Countries
Democratic Republic of Congo, Republic of Congo
REC
CEEAC-ECCAS
Stakeholders
Republic of Congo - Délégation Générale des Grands Travaux
Economic Community of Central African States
International Organisation for Migration
Email
egetahun@outlook.com
Start Date
Date Created Raw
Updated Date
Latitude
-4.300000
Longitude
15.276900