Kenya - Government of Kenya

By Anonymous (not verified) , 24 February 2026
PIDA Code
T.05.05.01.02
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Railway
Alternative Names
Phase 2A: Construction of the Nairobi – Naivasha SGR line (120km); Phase 2B: Naivasha – Kisumu (including new port at Kisumu) SGR line; Phase 2C: Kisumu – Malaba SGR line
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Construction of Nairobi to Malaba standard gauge railway (part of Mombasa - Kigali Railway Project) (Kenya)
Description

<p>The governments of Kenya and Uganda and Rwanda have committed to the development of a standard gauge railway that links the landlocked countries of Rwanda and Uganda with Mombasa port in Kenya. This project entails the section from Nairobi to the Kenya/Uganda border at Malaba.</p>

Capex Cost
6,498.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Project Risk

<ul><li> Environmental Risks: Not Reported Social Risks: Not Reported Socio-Enviro Classification: Not Reported Other External Risks: Not Reported</li></ul>

Countries
Kenya, Kenya, Rwanda, Uganda, Kenya, Rwanda, Uganda
Beneficiary Countries
Kenya, Rwanda, Uganda
REC
EAC
Stakeholders
East African Community
Kenya Railways Corporation
Northern Corridor Transit Transport Coordination Authority
Kenya - Government of Kenya
Email
DavidN@nepad.org
Updated Date
Latitude
-0.320000
Longitude
35.535300
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.05.05.01.01
Project Status
Completed
Project Stage
Construction
Completion Percentage
1
Sector Name
Transport
Subsector Name
Railway
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Construction of Mombasa to Nairobi standard gauge railway (part of Mombasa - Kigali Railway Project) (Kenya).
Phase I: Construction of the Mombasa - Nairobi SGR line (472km)
Description

<p>The governments of Kenya and Uganda and Rwanda have committed to the development of a standard gauge railway that links the landlocked countries of Rwanda and Uganda with Mombasa port in Kenya. This project entails the section from Mombasa port to Nairobi in Kenya.</p>

Capex Cost
5,000.00USD million
Preparation Cost
500.00
Operation Cost
0.00
Project Risk

<ul><li> Environmental Risks: Not Reported Social Risks: Not Reported Socio-Enviro Classification: Not Reported Other External Risks: Not Reported</li></ul>

Countries
Kenya, Kenya, Rwanda, Uganda, Kenya, Rwanda, Uganda
Beneficiary Countries
Kenya, Rwanda, Uganda
REC
EAC
Stakeholders
East African Community
Kenya Railways Corporation
Northern Corridor Transit Transport Coordination Authority
Kenya - Government of Kenya
Email
DavidN@nepad.org
Updated Date
Latitude
-2.680000
Longitude
38.273900
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.10.02.01
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Road
Alternative Names
LAMU Gateway Development Project
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
The project comprises the inter-regional highway network of the LAPSSET (Lamu Port South Sudan Ethiopia Transport) Corridor, which has road components connecting the Lamu Port (Kenya) through Garissa and Isiolo to Nadapal across the border in South Sudan.
Description

<p>The design for the LAPSSET higway components provide for a heavy transportation route from Lamu to South Sudan through Garissa, Isiolo, Kisima and Nginyang to meet the existing Kenya - South Sudan road at Lokichar, from where it continues to the border at Nadapal. The Lamu - Isiolo - Lokichar - Lodwar - Nadapal section measures about 1,300 km. The Northern Branch of the corridor to Addis Ababa in Ethiopia is the Isiolo- Moyale section which is also part of LAPSSET Corridor road. Construction on this section has been completed and the One Stop Border Post (OSBP) construction is currently underway.</p>

<p>The project is divided into four sections as follows:</p>

<ul>
<li>Lamu - Garissa  Road -263km</li>
<li>Garissa-Isiolo Road - 305km</li>
<li>Isiolo - Nginyang Road - 212km</li>
<li>Nginyang - Lokichar - Nadapal - 533km</li>
</ul>

<p>NB: The Government of Kenya is currently working on the re-alignment of Isiolo-Nginyang-Lokichar Section). The new aligned section takes the route: Isiolo-Lareta-Maralal-Baragoi-Lokori-Lokichar). Other sections remain the same.</p>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Kenya, Ethiopia, Kenya, South Sudan, Ethiopia, Kenya, South Sudan
Beneficiary Countries
Ethiopia, Kenya, South Sudan
REC
EAC
Stakeholders
East African Community
LAPSSET Corridor Development Authority (LCDA)
Kenya - Government of Kenya
World Bank
African Union Development Agency
African Development Bank
African Development Bank
Kenya - Government of Kenya
World Bank
Email
ephrem.hailu@giz.de
Updated Date
Latitude
-2.270000
Longitude
40.900600
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.10.02.01
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Road
Alternative Names
LAMU Gateway Development Project
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
The project comprises the inter-regional highway network of the LAPSSET (Lamu Port South Sudan Ethiopia Transport) Corridor, which has road components connecting the Lamu Port (Kenya) through Garissa and Isiolo to Nadapal across the border in South Sudan.
Description

<p>The design for the LAPSSET higway components provide for a heavy transportation route from Lamu to South Sudan through Garissa, Isiolo, Kisima and Nginyang to meet the existing Kenya - South Sudan road at Lokichar, from where it continues to the border at Nadapal. The Lamu - Isiolo - Lokichar - Lodwar - Nadapal section measures about 1,300 km. The Northern Branch of the corridor to Addis Ababa in Ethiopia is the Isiolo- Moyale section which is also part of LAPSSET Corridor road. Construction on this section has been completed and the One Stop Border Post (OSBP) construction is currently underway.</p>

<p>The project is divided into four sections as follows:</p>

<ul>
<li>Lamu - Garissa  Road -263km</li>
<li>Garissa-Isiolo Road - 305km</li>
<li>Isiolo - Nginyang Road - 212km</li>
<li>Nginyang - Lokichar - Nadapal - 533km</li>
</ul>

<p>NB: The Government of Kenya is currently working on the re-alignment of Isiolo-Nginyang-Lokichar Section). The new aligned section takes the route: Isiolo-Lareta-Maralal-Baragoi-Lokori-Lokichar). Other sections remain the same.</p>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Kenya, Ethiopia, Kenya, South Sudan, Ethiopia, Kenya, South Sudan
Beneficiary Countries
Ethiopia, Kenya, South Sudan
REC
EAC
Stakeholders
East African Community
LAPSSET Corridor Development Authority (LCDA)
Kenya - Government of Kenya
World Bank
African Union Development Agency
African Development Bank
African Development Bank
Kenya - Government of Kenya
World Bank
Email
ephrem.hailu@giz.de
Updated Date
Latitude
1.090000
Longitude
37.554000
By Anonymous (not verified) , 24 February 2026
Project Status
Active
Project Stage
Feasibility
Completion Percentage
0
Sector Name
Transport
Subsector Name
Road
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
The project comprises the inter-regional highway network of
the LAPSSET (Lamu Port South Sudan Ethiopia Transport) Corridor, which has road
components connecting the Lamu Port (Kenya) through Garissa and Isiolo to
Nadapal across the border in South Sudan. It entails the construction of a new highway from Isiolo to
Lokichar. Forming part of the inter-regional highways constructed under the
LAPSSET Corridor programme. The Isiolo - Lokichar section is under Feasibility
Study and Detailed Engineering Design stage.
Description

The Isiolo - Lokichar Highway is 416 km long. A 49 km section is already
upgraded under a separate Isiolo-Moyale project. The section to be constructed
under LAPSSET project is therefore 367 km. Currently no direct road link exists
along the proposed routing, but some segments have unpaved road tracks. The
road will be largely new construction requiring paving, drainage and road
furniture. The road is intended to divert transit traffic from Mombasa Port and
the Northern Corridor via Uganda to Juba in South Sudan.
The design standards adopted are an asphalt paved
single carriageway highway with carriageway width 7m and 2.0m wide paved
shoulders. General design speed is 100 - 120 km/h and maximum gradients 3%
except for 20km mountain section with 60 -90 km/h design speed and 10-12%
gradients. The road section commences
east of Isiolo town, proceeds north along Isiolo Moyale highway for 49km before
branching west at Lerata to Wamba , Baragoi, across Suguta Valley to Lokori and
Lokichar located along the Kitale - Lodwar - South Sudan highway. The road traverses a fairly easy flat to
rolling terrain except for the 20km mountainous escarpment section descending
to the 28km flat floor of the Suguta valley.
The notable bridge structures cross several perennial and dry season
rivers and the Suguta floodplain. The
key junctions are at the intersection with Isiolo-Moyale highway and the
Kenya-Sudan highway where grade separated interchanges are proposed. In order
to cater for future increase in capacity, the road reserve to be acquired for
the project is 100m wide which will allow for construction of a future second
carriageway.

Capex Cost
0.00USD million
Preparation Cost
402.00
Operation Cost
0.00
Project Risk

<ul><li>Soil Erosion and
contamination
</li><li>Air Pollution
</li><li>Public Health and Safety</li></ul>

Countries
Kenya, Kenya, South Sudan, Kenya, South Sudan
Beneficiary Countries
Kenya, South Sudan
Stakeholders
Inter-Governmental Authority on Development (IGAD)
African Development Bank
East African Community
Kenya - Government of Kenya
LAPSSET Corridor Development Authority (LCDA)
African Union Development Agency
World Bank
Email
waruid@gmail.com
Start Date
Date Created Raw
Updated Date
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.10.02.01
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Road
Alternative Names
LAMU Gateway Development Project
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
The project comprises the inter-regional highway network of the LAPSSET (Lamu Port South Sudan Ethiopia Transport) Corridor, which has road components connecting the Lamu Port (Kenya) through Garissa and Isiolo to Nadapal across the border in South Sudan.
Description

<p>The design for the LAPSSET higway components provide for a heavy transportation route from Lamu to South Sudan through Garissa, Isiolo, Kisima and Nginyang to meet the existing Kenya - South Sudan road at Lokichar, from where it continues to the border at Nadapal. The Lamu - Isiolo - Lokichar - Lodwar - Nadapal section measures about 1,300 km. The Northern Branch of the corridor to Addis Ababa in Ethiopia is the Isiolo- Moyale section which is also part of LAPSSET Corridor road. Construction on this section has been completed and the One Stop Border Post (OSBP) construction is currently underway.</p>

<p>The project is divided into four sections as follows:</p>

<ul>
<li>Lamu - Garissa  Road -263km</li>
<li>Garissa-Isiolo Road - 305km</li>
<li>Isiolo - Nginyang Road - 212km</li>
<li>Nginyang - Lokichar - Nadapal - 533km</li>
</ul>

<p>NB: The Government of Kenya is currently working on the re-alignment of Isiolo-Nginyang-Lokichar Section). The new aligned section takes the route: Isiolo-Lareta-Maralal-Baragoi-Lokori-Lokichar). Other sections remain the same.</p>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Kenya, Ethiopia, Kenya, South Sudan, Ethiopia, Kenya, South Sudan
Beneficiary Countries
Ethiopia, Kenya, South Sudan
REC
EAC
Stakeholders
East African Community
LAPSSET Corridor Development Authority (LCDA)
Kenya - Government of Kenya
World Bank
African Union Development Agency
African Development Bank
African Development Bank
Kenya - Government of Kenya
World Bank
Email
ephrem.hailu@giz.de
Updated Date
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.10.02.01
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Road
Alternative Names
LAMU Gateway Development Project
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
The project comprises the inter-regional highway network of the LAPSSET (Lamu Port South Sudan Ethiopia Transport) Corridor, which has road components connecting the Lamu Port (Kenya) through Garissa and Isiolo to Nadapal across the border in South Sudan.
Description

<p>The design for the LAPSSET higway components provide for a heavy transportation route from Lamu to South Sudan through Garissa, Isiolo, Kisima and Nginyang to meet the existing Kenya - South Sudan road at Lokichar, from where it continues to the border at Nadapal. The Lamu - Isiolo - Lokichar - Lodwar - Nadapal section measures about 1,300 km. The Northern Branch of the corridor to Addis Ababa in Ethiopia is the Isiolo- Moyale section which is also part of LAPSSET Corridor road. Construction on this section has been completed and the One Stop Border Post (OSBP) construction is currently underway.</p>

<p>The project is divided into four sections as follows:</p>

<ul>
<li>Lamu - Garissa  Road -263km</li>
<li>Garissa-Isiolo Road - 305km</li>
<li>Isiolo - Nginyang Road - 212km</li>
<li>Nginyang - Lokichar - Nadapal - 533km</li>
</ul>

<p>NB: The Government of Kenya is currently working on the re-alignment of Isiolo-Nginyang-Lokichar Section). The new aligned section takes the route: Isiolo-Lareta-Maralal-Baragoi-Lokori-Lokichar). Other sections remain the same.</p>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Kenya, Ethiopia, Kenya, South Sudan, Ethiopia, Kenya, South Sudan
Beneficiary Countries
Ethiopia, Kenya, South Sudan
REC
EAC
Stakeholders
East African Community
LAPSSET Corridor Development Authority (LCDA)
Kenya - Government of Kenya
World Bank
African Union Development Agency
African Development Bank
African Development Bank
Kenya - Government of Kenya
World Bank
Email
ephrem.hailu@giz.de
Updated Date
Latitude
0.360000
Longitude
37.583300
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.10.02.02
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Road
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Upgrading of 640 km of single carriageway road from Eldoret to Nadapal (Kenya).
Description

The project involves the upgrading of the 640 km road from Eldoret to Nadapal, the border with South Sudan.

Capex Cost
683.00USD million
Preparation Cost
68.00
Operation Cost
0.00
Project Risk

<ul><li> Environmental Risks: Not Reported Social Risks: Not Reported Socio-Enviro Classification: Not Reported Other External Risks: Not Reported</li></ul>

Countries
Kenya, Kenya, Kenya, South Sudan
Beneficiary Countries
Kenya
REC
IGAD
Stakeholders
Kenya - Government of Kenya
Inter-Governmental Authority on Development (IGAD)
International Development Association - World Bank Group
Kenya National Highways Authority
LAPSSET Corridor Development Authority (LCDA)
Kenya - Government of Kenya
International Development Association - World Bank Group
Email
ephrem.hailu@giz.de
Start Date
Date Created Raw
Updated Date
Latitude
2.460000
Longitude
34.967800
By Anonymous (not verified) , 24 February 2026
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
Transport
Subsector Name
Railway
Alternative Names
Not available
Reference Plan
PIDA PAP 2
On SDM
Off
Summary
<p>Construction of standard gauge from the port city of Mombasa through Nairobi, Malaba, Kampala and Kigali, Rwanda.</p>
Description

<p>The project commences at the port city of Mombasa and covers a distance of 480 km to Nairobi and then 120km to Naivasha. It then proceeds 500km westwards to the Kenya/Uganda border through Kisumu. On the Ugandan side, the project covers the 250km Malaba - Kampala section and the spur from Tororo to Gulu via Soroti </p>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Project Risk

<p>Not available</p>

Countries
Uganda, Burundi, Democratic Republic of Congo, Rwanda, South Sudan, Kenya
Beneficiary Countries
Burundi, Democratic Republic of Congo, Rwanda, South Sudan, Kenya
Stakeholders
Uganda - Government of Uganda
Kenya - Government of Kenya
Rwanda - Government of Rwanda
Northern Corridor Transit Transport Coordination Authority
Start Date
Date Created Raw
Latitude
-3.960000
Longitude
39.914900
By Anonymous (not verified) , 24 February 2026
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
Transport
Subsector Name
Railway
Alternative Names
Not available
Reference Plan
PIDA PAP 2
On SDM
Off
Summary
<p>Construction of standard gauge from the port city of Mombasa through Nairobi, Malaba, Kampala and Kigali, Rwanda. </p>
Description

<p>The project commences at the port city of Mombasa and covers a distance of 480 km to Nairobi and then 120km to Naivasha. It then proceeds 500km westwards to the Kenya/Uganda border through Kisumu. On the Ugandan side, the project covers the 250km Malaba - Kampala section and the spur from Tororo to Gulu via Soroti </p>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Project Risk

<p>Not available</p>

Countries
South Sudan, Burundi, Democratic Republic of Congo, Rwanda, Uganda, Kenya
Beneficiary Countries
Burundi, Democratic Republic of Congo, Rwanda, Uganda, Kenya
Stakeholders
Government of South Sudan
Uganda - Government of Uganda
Kenya - Government of Kenya
Rwanda - Government of Rwanda
Start Date
Date Created Raw
Latitude
-3.960000
Longitude
39.914900