<p>The implementation of this project includes the following actions:
</p><ul><li> The modernization of the line in Morocco (Fes- Oujda),
</li><li> The rehabilitation of the section between Morocco and Algeria (Cross-border Morocco- Algerian, Ouida- Akid Abbas),
</li><li> The creation of a new cross-border rail link between Algeria and Tunisia (linking Annaba to Jendouba),
</li><li> The modernization between Jendouba and Jedeida,
</li><li> Different technological interventions for energy and control and signalling subsystems.</li></ul><p>The project serves an existing infrastructure asset of another sector, but there is more than 50% overlap in the geography serviced by the proposed project and the other sector existing asset.</p><p>Tracks, structures and tunnels, to be built or duplicated. In addition, all sections will be electrified with the 2x25 kV electrification subsystem and train management will be carried out with the ERTMS N2 subsystem. One-off interventions in signalling and telecommunications subsystems are also planned.<br></p>