Zambia Office for the Promotion of Private Power Investment

By Anonymous (not verified) , 24 February 2026
PIDA Code
E.02.03.03
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Energy
Subsector Name
Power Interconnector
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
<p>Construction of 905 km single circuit bidirectional 330 kV transmission interconnector from Kabwe in Zambia to the Tanzanian border at Nakonde. In Zambia, the component of the ZTK: Kabwe - Pensulo, 298 km. A second 330 kV line is required in addition to the existing. Pensulo -Mpika, 197 km. A second 330 kV line is required in addition to the existing. Mpika - Kasama, 197 km. A second 330 kV line is required in addition to the existing. Kasama -Nakonde, 212 km. Two new 330 kV circuits required Nakonde ZM/TZ Border, New 14 km Double circuit 400 kV line required.</p>
Description

<p>Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project includes the section of 905km Zambian section of the 2,800km&Acirc; ZTK interconnector from Kabwe-Pensulo-Nakonde-Kasama in Zambia to Tunduma&Acirc; in Tanzania. The project was envisioned to be implemented in two phases starting with the Kabwe-Pensulo-Kasama-Nakonde&Acirc; section and the second phase would have&Acirc; comprised the Kabwe-Pensulo-Mpika-Kasama section. It will have had a capacity of&Acirc; 500MW, upgradable to 2000MW depending on power demand.</p>
<p>The original concept for the ZTK Interconnector was a high voltage 330 kV transmission line going from Pensulo (Zambia) to Nairobi (Kenya) with three connection points in Tanzania (Mbeya, Singida and Arusha). At that time, Tanzania grid was operated at 220 kV. The original concept of the ZTK Interconnector has been replaced, by two interconnections between two national grids: the Kenya-Tanzania Interconnection and the Zambia-Tanzania Interconnection.</p>

Capex Cost
162.00USD million
Preparation Cost
5.00
Operation Cost
3.24
Project Risk

<p>The major risks facing the interconnection project were identified and analysed.</p>
<p>Among these risks, special attention is warranted to the following categories of risks and to the measures to</p>
<p>mitigate them:</p>
<p>? Operational risks (in particular, the risks arising from organizational or technical reasons);</p>
<p>? Financial risks;</p>
<p>? Risks related to the environmental and social impacts;</p>
<p>While these risks and their impact are potentially serious, adequate mitigating measures, as indicated in</p>
<p>section 14, can reduce their likelihood of occurrence, diminish their impact, and ensure successful completion</p>
<p>and operation of the interconnection.</p>

Countries
Zambia, Kenya, Tanzania, Zambia, Kenya, Tanzania, Zambia
Beneficiary Countries
Kenya, Tanzania, Zambia
Stakeholders
African Union Development Agency
Common Market for Eastern and Southern Africa
Eastern Africa Power Pool
European Commission
Nile Equatorial Lakes Subsidiary Action Program
Southern African Development Community
Southern African Power Pool
World Bank
Zambia Electricity Supply Company
Zambia Office for the Promotion of Private Power Investment
Zambia - Ministry of Energy
European Commission
Start Date
Date Created Raw
Updated Date
Latitude
-11.150000
Longitude
31.547200
By Anonymous (not verified) , 24 February 2026
PIDA Code
E.02.07.02
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Energy
Subsector Name
Power Interconnector
On SDM
Off
Summary
Construction of the 231 km / 330 kV Livingstone to Katima Mulilo section of the ZiZaBoNa transmission interconnector, i.e. Zimbabwe-Zambia-Botswana-Namibia. The construction of an interconnector aims to provide high power transmission to in order to relieve congestion on the SAPP grid supply power to the growing demand of Namibia.
Description

<p>ZiZaBoNa creates a new Western Transmission Corridor in Southern Africa, by linking the power systems of Zimbabwe, Zambia, Botswana and Namibia. This part of the project involves the construction of a 231 km / 330 kV transmission interconnector from Livingstone Substation (Zambia) to Zambezi Substation at Katima (Botswana), with a transmission capacity of 300 MW. Here it joins the Caprivi HVDC link.</p>

Capex Cost
55.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Zambia, Botswana, Namibia, Zambia, Zimbabwe, Botswana, Namibia, Zambia, Zimbabwe
Beneficiary Countries
Botswana, Namibia, Zambia, Zimbabwe
REC
SADC
Stakeholders
Southern African Development Community
Southern African Power Pool
Zambia - Ministry of Energy
Zambia - Ministry of Housing and Infrastructure Development
Zambia - Ministry of Transport and Communications
Zambia Electricity Supply Company
Zambia Office for the Promotion of Private Power Investment
Zimbabwe - Ministry of Energy and Power Development
Zimbabwe Electricity Supply Authority
Email
egetahun@outlook.com
Start Date
Date Created Raw
Updated Date
Latitude
-17.650000
Longitude
25.079800