East African Community

Acronym
EAC
Remote ID
275
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.08.02.02
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Border Post
Alternative Names
Central Corridor OSBPs
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
In order to reduce the non tariff barriers (NTBs) along the Central Corridor by harmonizing services on border posts between the Republic of Burundi and the United Republic of Tanzania, it has been planned by both countries to construct a One-Stop Border Post (OSBP) at the common border Kobero/Kabanga. Because of the configuration of the terrain between the 2 countries, a juxtaposed OSBP has been chosen.
Description

<p>The One - Stop - Border - Post (OSBP) is juxtaposed. Offices in Burundi and Tanzania are located in each country at a certain distance from the borderline. In offices, the different Officers (from both countries) are seated side by side and all sevices are done simultaneously.The construction of all offices in Burundi and Tanzania has been funded by Trade Mark Africa.</p>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Burundi, Tanzania, Burundi, Tanzania, Burundi, Tanzania
Beneficiary Countries
Burundi, Tanzania
REC
EAC
Stakeholders
East African Community
Tanzania Revenue Authority
Burundi - Office Burundais des Recettes
Central Corridor Transit Transport Facilitation Agency
TradeMark East Africa
Japanese International Cooperation Agency
Email
ephrem.hailu@giz.de
Updated Date
Latitude
0.000000
Longitude
0.000000
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.05.03.19
Project Status
Completed
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Road
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Upgrading of Kabale-Kisoro road from gravel to bituminous standard
Description

<p>Upgrading the existing Kabale- Kisoro  National  Road From Gravel to Asphalt Concrete Surfacing</p>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Project Risk

<ul><li>Geo technical Design risks, </li><li>Land take risks</li><li>Cost escalation risks</li></ul>

Countries
Uganda, Uganda, Democratic Republic of Congo, Rwanda, Uganda
Beneficiary Countries
Uganda
REC
EAC
Stakeholders
East African Community
Uganda National Roads Authority
Northern Corridor Transit Transport Coordination Authority
African Development Bank
Uganda - Government of Uganda
Email
ephrem.hailu@giz.de
Updated Date
Latitude
-1.230000
Longitude
29.794700
By Anonymous (not verified) , 24 February 2026
PIDA Code
I.02.23.02
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
ICT
Subsector Name
Fibre Optic Cable
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
*** DISCLAIMER: Project information was not obtained. It will be inserted when project information becomes available. *** Construction of Kenya section of the fibre optic link between Juba and Nairobi.
Countries
Kenya, South Sudan, Kenya, South Sudan, Kenya
Beneficiary Countries
South Sudan, Kenya
REC
EAC
Stakeholders
East African Community
Liquid Telecommunication Group
Email
ephremg@nepad.org
Latitude
1.580000
Longitude
35.516800
By Anonymous (not verified) , 24 February 2026
PIDA Code
I.02.09.01
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
ICT
Subsector Name
Fibre Optic Cable
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
*** DISCLAIMER: Project information was not obtained. It will be inserted when project information becomes available. *** Construction of Uganda section of the fibre optic link between Juba and Kampala.
Countries
Uganda, Uganda, South Sudan, Uganda, South Sudan
Beneficiary Countries
Uganda, South Sudan
REC
EAC
Stakeholders
East African Community
Uganda Telecom
Email
ephremg@nepad.org
Updated Date
Latitude
1.940000
Longitude
33.128800
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.05.01
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Road
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
*** DISCLAIMER: Project information was not obtained. It will be inserted when project information becomes available. *** Development of joint standards for modern road corridor design (with PPP) including Trade and Transport Facilitation on the Northern
Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
REC
EAC
Stakeholders
East African Community
Northern Corridor Transit Transport Coordination Authority
Northern Corridor Transit Transport Coordination Authority
Email
ephrem.hailu@giz.de
Updated Date
Latitude
0.000000
Longitude
0.000000
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.08.01
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Road
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
*** DISCLAIMER: Project information was not obtained. It will be inserted when project information becomes available. *** Development of joint standards for modern road corridor design (with PPP) (including Trade and Transport Facilitation) for Central Co
Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
REC
EAC
Stakeholders
East African Community
Central Corridor Transit Transport Facilitation Agency
Central Corridor Transit Transport Facilitation Agency
Email
ephrem.hailu@giz.de
Updated Date
Latitude
0.000000
Longitude
0.000000
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.10.02.01
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Road
Alternative Names
LAMU Gateway Development Project
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
The project comprises the inter-regional highway network of the LAPSSET (Lamu Port South Sudan Ethiopia Transport) Corridor, which has road components connecting the Lamu Port (Kenya) through Garissa and Isiolo to Nadapal across the border in South Sudan.
Description

<p>The design for the LAPSSET higway components provide for a heavy transportation route from Lamu to South Sudan through Garissa, Isiolo, Kisima and Nginyang to meet the existing Kenya - South Sudan road at Lokichar, from where it continues to the border at Nadapal. The Lamu - Isiolo - Lokichar - Lodwar - Nadapal section measures about 1,300 km. The Northern Branch of the corridor to Addis Ababa in Ethiopia is the Isiolo- Moyale section which is also part of LAPSSET Corridor road. Construction on this section has been completed and the One Stop Border Post (OSBP) construction is currently underway.</p>

<p>The project is divided into four sections as follows:</p>

<ul>
<li>Lamu - Garissa  Road -263km</li>
<li>Garissa-Isiolo Road - 305km</li>
<li>Isiolo - Nginyang Road - 212km</li>
<li>Nginyang - Lokichar - Nadapal - 533km</li>
</ul>

<p>NB: The Government of Kenya is currently working on the re-alignment of Isiolo-Nginyang-Lokichar Section). The new aligned section takes the route: Isiolo-Lareta-Maralal-Baragoi-Lokori-Lokichar). Other sections remain the same.</p>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Kenya, Ethiopia, Kenya, South Sudan, Ethiopia, Kenya, South Sudan
Beneficiary Countries
Ethiopia, Kenya, South Sudan
REC
EAC
Stakeholders
East African Community
LAPSSET Corridor Development Authority (LCDA)
Kenya - Government of Kenya
World Bank
African Union Development Agency
African Development Bank
African Development Bank
Kenya - Government of Kenya
World Bank
Email
ephrem.hailu@giz.de
Updated Date
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.08.03.24
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Road
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Upgrading of 260 km single carriageway road from Isaka to Lusahunga (Tanzania).
Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Tanzania, Tanzania, Tanzania
Beneficiary Countries
Tanzania
REC
EAC
Stakeholders
East African Community
Tanzania National Roads Agency
Central Corridor Transit Transport Facilitation Agency
Email
ephrem.hailu@giz.de
Updated Date
Latitude
0.000000
Longitude
0.000000
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.08.05.01
Project Status
Active
Project Stage
Construction
Completion Percentage
1
Sector Name
Transport
Subsector Name
Railway
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Construction of 371km of railway to standard gauge from Isaka - Kigali standard gauge railway.
Description

<p>Tanzania is constructing the high speed electric standard gauge railway line from Isaka to Rusumo connects Keza in Kigali (371 Km)</p>

Capex Cost
2,450.00USD million
Preparation Cost
40.00
Operation Cost
0.00
Project Risk

<ul><li> Environmental Risks: Not Reported Social Risks: Not Reported Socio-Enviro Classification: Not Reported Other External Risks: Not Reported</li></ul>

Countries
Tanzania, Tanzania, Rwanda, Tanzania, Uganda
Beneficiary Countries
Tanzania
REC
EAC
Stakeholders
East African Community
Tanzania Railway Corporation
Central Corridor Transit Transport Facilitation Agency
Email
ephrem.hailu@giz.de
Updated Date
Latitude
-5.870000
Longitude
34.417800
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.08.03.04
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Road
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
RN12: Gitega-Karuzi-Muyinga (104 km) is classed "national road". It is a link of the central corridor on burundian territory. The current status of the road is bitumen but needs to be upgraded to the EAC standards.....
Description

<p>Widening of the road from 6m to 7m with a paved shoulder to harmonise with EAC standard. The Muyinga-Gitega road is about 104 km on the RN12. This road forms part of the shortest route to the port of Dar es Salaam and carries 60% of international traffic with Burundi.</p>

Capex Cost
312.00USD million
Preparation Cost
3.00
Operation Cost
0.00
Project Risk

<ul><li> Environmental Risks: Not Reported Social Risks: Not Reported Socio-Enviro Classification: Not Reported Other External Risks: Not Reported</li></ul>

Countries
Burundi, Burundi, Burundi
Beneficiary Countries
Burundi
REC
EAC
Stakeholders
East African Community
DRC - Le bureau des Routes
Central Corridor Transit Transport Facilitation Agency
Email
ephrem.hailu@giz.de
Updated Date
Latitude
-3.130000
Longitude
30.134800