Inter-Governmental Authority on Development (IGAD)

Acronym
IGAD
Remote ID
1256
By Anonymous (not verified) , 24 February 2026
PIDA Code
I.02.09.02
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
ICT
Subsector Name
Fibre Optic Cable
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
*** DISCLAIMER: Project information was not obtained. It will be inserted when project information becomes available. *** Construction of South Sudan section of the fibre optic link between Juba and Kampala.
Countries
South Sudan, Uganda, South Sudan, Uganda, South Sudan
Beneficiary Countries
Uganda, South Sudan
REC
IGAD
Stakeholders
Inter-Governmental Authority on Development (IGAD)
South Sudan Ministry of Telecommunications and Postal Service
Email
ephremg@nepad.org
Updated Date
Latitude
4.210000
Longitude
31.835500
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.05.03.13
Project Status
Active
Project Stage
Feasibility
Completion Percentage
0
Sector Name
Transport
Subsector Name
Road
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
*** DISCLAIMER: Project information was not obtained. It will be inserted when project information becomes available. *** Construction of the Juba-Bor-Malakal-Renki-Sudan Border Road in South Sudan.
Countries
South Sudan, Sudan, South Sudan, Sudan, South Sudan, Sudan
Beneficiary Countries
South Sudan, Sudan
REC
IGAD
Stakeholders
Inter-Governmental Authority on Development (IGAD)
South Sudan Roads Authority
Northern Corridor Transit Transport Coordination Authority
Email
ephremg@nepad.org
Updated Date
Latitude
0.000000
Longitude
0.000000
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.05.05.02
Project Status
Active
Project Stage
Feasibility
Completion Percentage
0
Sector Name
Transport
Subsector Name
Railway
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
*** DISCLAIMER: Project information was not obtained. It will be inserted when project information becomes available. *** Construction of the Juba-Bor-Malakal-Renki-Sudan Border railway in South Sudan.
Countries
South Sudan, South Sudan, Sudan, South Sudan, Sudan
Beneficiary Countries
South Sudan, Sudan
REC
IGAD
Stakeholders
Inter-Governmental Authority on Development (IGAD)
South Sudan Roads Authority
Northern Corridor Transit Transport Coordination Authority
Email
ephremg@nepad.org
Updated Date
Latitude
0.000000
Longitude
0.000000
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.07.01
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Road
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Joint design standards for modern rail transport corridor infrastructure (with PPP) (including Trade and Transport Facilitation) on the Djibouti Corridor.
Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Stakeholders
Inter-Governmental Authority on Development (IGAD)
Inter-Governmental Authority on Development (IGAD)
Email
ephrem.hailu@giz.de
Updated Date
Latitude
10.240000
Longitude
40.934800
By Anonymous (not verified) , 24 February 2026
Project Status
Active
Project Stage
Feasibility
Completion Percentage
0
Sector Name
Transport
Subsector Name
Road
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
The project comprises the inter-regional highway network of
the LAPSSET (Lamu Port South Sudan Ethiopia Transport) Corridor, which has road
components connecting the Lamu Port (Kenya) through Garissa and Isiolo to
Nadapal across the border in South Sudan. It entails the construction of a new highway from Isiolo to
Lokichar. Forming part of the inter-regional highways constructed under the
LAPSSET Corridor programme. The Isiolo - Lokichar section is under Feasibility
Study and Detailed Engineering Design stage.
Description

The Isiolo - Lokichar Highway is 416 km long. A 49 km section is already
upgraded under a separate Isiolo-Moyale project. The section to be constructed
under LAPSSET project is therefore 367 km. Currently no direct road link exists
along the proposed routing, but some segments have unpaved road tracks. The
road will be largely new construction requiring paving, drainage and road
furniture. The road is intended to divert transit traffic from Mombasa Port and
the Northern Corridor via Uganda to Juba in South Sudan.
The design standards adopted are an asphalt paved
single carriageway highway with carriageway width 7m and 2.0m wide paved
shoulders. General design speed is 100 - 120 km/h and maximum gradients 3%
except for 20km mountain section with 60 -90 km/h design speed and 10-12%
gradients. The road section commences
east of Isiolo town, proceeds north along Isiolo Moyale highway for 49km before
branching west at Lerata to Wamba , Baragoi, across Suguta Valley to Lokori and
Lokichar located along the Kitale - Lodwar - South Sudan highway. The road traverses a fairly easy flat to
rolling terrain except for the 20km mountainous escarpment section descending
to the 28km flat floor of the Suguta valley.
The notable bridge structures cross several perennial and dry season
rivers and the Suguta floodplain. The
key junctions are at the intersection with Isiolo-Moyale highway and the
Kenya-Sudan highway where grade separated interchanges are proposed. In order
to cater for future increase in capacity, the road reserve to be acquired for
the project is 100m wide which will allow for construction of a future second
carriageway.

Capex Cost
0.00USD million
Preparation Cost
402.00
Operation Cost
0.00
Project Risk

<ul><li>Soil Erosion and
contamination
</li><li>Air Pollution
</li><li>Public Health and Safety</li></ul>

Countries
Kenya, Kenya, South Sudan, Kenya, South Sudan
Beneficiary Countries
Kenya, South Sudan
Stakeholders
Inter-Governmental Authority on Development (IGAD)
African Development Bank
East African Community
Kenya - Government of Kenya
LAPSSET Corridor Development Authority (LCDA)
African Union Development Agency
World Bank
Email
waruid@gmail.com
Start Date
Date Created Raw
Updated Date
By Anonymous (not verified) , 24 February 2026
Project Status
Active
Project Stage
Feasibility
Completion Percentage
0
Sector Name
Water
Subsector Name
Multi-purpose Reservoir
Reference Plan
PIDA PAP 2
On SDM
Off
Summary
<p>The proposed Dawa dam will be located approximately 20 km upstream of Rhamu Dimtu town in Mandera County and 2km upstream of Boni centre in Ethiopia. The estimated dam height is about 90m with a capacity of approximately 4.5 Billion m3 and can be utilised to generate 8.2MW of hydropower.</p>
Description

<p>The proposed Dawa dam will be located approximately 20 km upstream of Rhamu Dimtu town in Mandera County and 2km upstream of Boni centre in Ethiopia. The estimated dam height is about 90m with a capacity of approximately 4.5 Billion m3 and can be utilised to generate 8.2MW of hydropower.</p>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Project Risk

<ul>
<li>dSocio-economic Impacts: Displacement, Loss of livelihood, Specific impacts on women, Loss of landscape/sense of place</li>
</ul>
<p> </p>

Countries
Kenya, Ethiopia, Kenya, Somalia, Ethiopia, Kenya, Somalia
Beneficiary Countries
Ethiopia, Kenya, Somalia
Stakeholders
Inter-Governmental Authority on Development (IGAD)
East African Community
Start Date
Date Created Raw
Updated Date
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.07.03.03
Project Status
Active
Project Stage
Feasibility
Completion Percentage
0
Sector Name
Transport
Subsector Name
Road
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
The project involves rehabilitation of Kalabayd - Hargeisa - Berbera road (221km); and Upgrading of Kalabayd - Togwachalle road section (20km). Also, the project involves the construction of Hargeisa bypass (25km).
Description

The project involves rehabilitation of Kalabayd - Hargeisa - Berbera road (221km); and Upgrading of Kalabayd - Togwachalle road section (20km). Also project involves construction of Hargeisa bypass (25km).

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Project Risk

No major risks or consequences in achieving the project objectives.

Countries
Somalia, Somalia, Somalia
Beneficiary Countries
Somalia
REC
IGAD
Stakeholders
Inter-Governmental Authority on Development (IGAD)
Email
egetahun@outlook.com
Start Date
Date Created Raw
Updated Date
Latitude
0.000000
Longitude
0.000000
By Anonymous (not verified) , 24 February 2026
PIDA Code
I.02.27.02
Project Status
Completed
Project Stage
Construction
Completion Percentage
0
Sector Name
ICT
Subsector Name
Fibre Optic Cable
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Construction of South Sudan section of the fibre optic link between Bagui and Juba .
Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
South Sudan, Central African Republic, South Sudan, Central African Republic, South Sudan
Beneficiary Countries
Central African Republic, South Sudan
REC
IGAD
Stakeholders
Inter-Governmental Authority on Development (IGAD)
South Sudan Ministry of Telecommunications and Postal Service
Email
ephremg@nepad.org
Updated Date
Latitude
5.120000
Longitude
29.415700