<p>Water transfer from Lesotho to Botswana across South Africa, to meet water supply demands in Botswana, Lesotho and en route parts of South Africa. It involves construction of a multipurpose dam along Makhaleng River in Lesotho and conveyance system from Lesotho to Botswana.</p><p>Various foreseen water uses include domestic, industrial, irrigation, hydropower generation and environmental water requirements.</p><p>Dam in Lesotho. Conveyance system in Lesotho, South Africa and Botswana</p><p>The project serves a planned infrastructure asset of another sector, but there is less than 50% overlap in the geography serviced by the proposed project and the other sector planned asset.</p><p>Although studies are ongoing, indicatively about 75% of the yield from the proposed dam in Lesotho is foreseen for water demands in Botswana.</p><p><br></p>