By Anonymous (not verified) , 24 February 2026
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Water
Reference Plan
PIDA PAP 2
On SDM
Off
Summary
Water transfer from Lesotho to Botswana across South Africa, to meet water supply demands in Botswana, Lesotho and en route parts of South Africa. It involves construction of a multipurpose dam along Makhaleng River in Lesotho and conveyance system from Lesotho to Botswana.
Description

<p>Water transfer from Lesotho to Botswana across South Africa, to meet water supply demands in Botswana, Lesotho and en route parts of South Africa. It involves construction of a multipurpose dam along Makhaleng River in Lesotho and conveyance system from Lesotho to Botswana.</p><p>Various foreseen water uses include domestic, industrial, irrigation, hydropower generation and environmental water requirements.</p><p>Dam in Lesotho. Conveyance system in Lesotho, South Africa and Botswana</p><p>The project serves a planned infrastructure asset of another sector, but there is less than 50% overlap in the geography serviced by the proposed project and the other sector planned asset.</p><p>Although studies are ongoing, indicatively about 75% of the yield from the proposed dam in Lesotho is foreseen for water demands in Botswana.</p><p><br></p>

Capex Cost
3,000.00USD million
Preparation Cost
4.00
Operation Cost
150.20
Countries
Botswana, Lesotho, South Africa, Botswana, Lesotho, South Africa, Botswana, Lesotho, South Africa
Beneficiary Countries
Botswana, Lesotho, South Africa
REC
SADC
Stakeholders
Orange-Senqu River Commission
Southern African Development Community
Email
egetahun@outlook.com
Start Date
Date Created Raw
Updated Date
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.17.04
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
Transport
Subsector Name
Airport
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
*** DISCLAIMER: Project information was not obtained. It will be inserted when project information becomes available. *** Upgrade of LA©opold SA©dar Senghor International Airport in Dakar (Senegal).
Countries
Senegal, Senegal, Senegal
Beneficiary Countries
Senegal
REC
ECOWAS-CEDEAO
Stakeholders
Economic Community of West African States
Senegal - Direction d`Aviation Civile
Email
ephremg@nepad.org
Latitude
14.720000
Longitude
-17.478000
By Anonymous (not verified) , 24 February 2026
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
Transport
Subsector Name
Railway
Alternative Names
Inter-regional Standard Gauge Railway lines from Lamu to Isiolo, Isiolo to Juba, Isiolo to Addis Ababa, and Nairobi to Isiolo
Reference Plan
PIDA PAP 2
On SDM
Off
Summary
<p>The LAPSSET Corridor will cross the north-eastern part of Kenya, from the port of Lamu to Isiolo in Kenya, and connect directly with South Sudan, via Nakodok, and Ethiopia via Moyale. The project objectives are to:</p>
<p>&bull; Enhance capacities for the transport of people and goods, improving connectivity and trade and fostering economies</p>
<p>&bull; Reduce transport costs and improve the freight transport connectivity</p>
<p>&bull; Trigger private investment and development of industrial parks and logistic facilities/hubs &bull; Improve passenger transport and contribute to socio-economic regional integration.</p>
<p>Construction of a standard gauge railway (2900km) from lines from Lamu to Isiolo, Isiolo to Juba, Isiolo to Addis Ababa, and Nairobi to Isiolo.</p>
Description

<p>Construction of a standard gauge railway (2900km) from Lamu Port in Kenya to Juba in South Sudan and Addis Ababa in Ethiopia i.e. LamuGarissa-Isiolo and branching into two links, the link to South Sudan (Isiolo-Nginyang-Nakodok-Juba) and link to Ethiopia (Isiolo-Moyale-Addis Ababa). Design speed: (Passenger train) 160 km per hour (Kph), (Freight train) 120 Kph, Gauge: 1,435 mm (Standard Gauge). The railway project preliminary designs are complete for the Kenyan and Ethiopian route and expected to proceed to the Detailed Engineering Design stage. The Government Kenya and the Government of Ethiopia have signed a Bilateral Agreement to jointly pursue the development of the LAPSSET Standard Gauge Railway. A Memorandum of Understanding (MoU) has been signed between LCDA and InterGovernmental Authority on Development (IGAD) to facilitate the financing of this stage though an Infrastructure Project Preparatory Fund (IPPF) available through the New Partnership for African Development (NEPAD). </p>

Capex Cost
8,000,000.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Kenya, South Sudan, Ethiopia
Beneficiary Countries
South Sudan, Ethiopia
REC
IGAD
Stakeholders
Inter-Governmental Authority on Development (IGAD)
LAPSSET Corridor Development Authority (LCDA)
Start Date
Date Created Raw
Latitude
-2.190000
Longitude
40.923400
By Anonymous (not verified) , 24 February 2026
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
Transport
Subsector Name
Railway
Alternative Names
Inter-regional Standard Gauge Railway lines from Lamu to Isiolo, Isiolo to Juba, Isiolo to Addis Ababa, and Nairobi to Isiolo
Reference Plan
PIDA PAP 2
On SDM
Off
Summary
<p>Construction of a standard gauge railway (2900km) from lines from Lamu to Isiolo, Isiolo to Juba, Isiolo to Addis Ababa, and Nairobi to Isiolo.</p>
Description

<p>Construction of a standard gauge railway (2900km) from Lamu Port in Kenya to Juba in South Sudan and Addis Ababa in Ethiopia i.e. LamuGarissa-Isiolo and branching into two links, the link to South Sudan (Isiolo-Nginyang-Nakodok-Juba) and link to Ethiopia (Isiolo-Moyale-Addis Ababa). Design speed: (Passenger train) 160 km per hour (Kph), (Freight train) 120 Kph, Gauge: 1,435 mm (Standard Gauge). The railway project preliminary designs are complete for the Kenyan and Ethiopian route and expected to proceed to the Detailed Engineering Design stage. The Government Kenya and the Government of Ethiopia have signed a Bilateral Agreement to jointly pursue the development of the LAPSSET Standard Gauge Railway. A Memorandum of Understanding (MoU) has been signed between LCDA and InterGovernmental Authority on Development (IGAD) to facilitate the financing of this stage though an Infrastructure Project Preparatory Fund (IPPF) available through the New Partnership for African Development (NEPAD). </p>

Capex Cost
8,000,000.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Project Risk

<p>Note Available</p>

Countries
South Sudan, Kenya, Ethiopia, Uganda
Beneficiary Countries
Kenya, Ethiopia, Uganda
REC
IGAD
Stakeholders
Inter-Governmental Authority on Development (IGAD)
LAPSSET Corridor Development Authority (LCDA)
Start Date
Date Created Raw
Updated Date
Latitude
-2.190000
Longitude
40.923400
By Anonymous (not verified) , 24 February 2026
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
Transport
Subsector Name
Railway
Alternative Names
Inter-regional Standard Gauge Railway lines from Lamu to Isiolo, Isiolo to Juba, Isiolo to Addis Ababa, and Nairobi to Isiolo
Reference Plan
PIDA PAP 2
On SDM
Off
Summary
<p>Construction of a standard gauge railway (2900km) from lines from Lamu to Isiolo, Isiolo to Juba, Isiolo to Addis Ababa, and Nairobi to Isiolo. </p>
Description

<p>Construction of a standard gauge railway (2900km) from Lamu Port in Kenya to Juba in South Sudan and Addis Ababa in Ethiopia i.e. LamuGarissa-Isiolo and branching into two links, the link to South Sudan (Isiolo-Nginyang-Nakodok-Juba) and link to Ethiopia (Isiolo-Moyale-Addis Ababa). Design speed: (Passenger train) 160 km per hour (Kph), (Freight train) 120 Kph, Gauge: 1,435 mm (Standard Gauge). The railway project preliminary designs are complete for the Kenyan and Ethiopian route and expected to proceed to the Detailed Engineering Design stage. The Government Kenya and the Government of Ethiopia have signed a Bilateral Agreement to jointly pursue the development of the LAPSSET Standard Gauge Railway. A Memorandum of Understanding (MoU) has been signed between LCDA and InterGovernmental Authority on Development (IGAD) to facilitate the financing of this stage though an Infrastructure Project Preparatory Fund (IPPF) available through the New Partnership for African Development (NEPAD). </p>

Capex Cost
8,000,000.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Ethiopia, South Sudan, Kenya
Beneficiary Countries
South Sudan, Kenya
REC
IGAD
Stakeholders
Inter-Governmental Authority on Development (IGAD)
LAPSSET Corridor Development Authority (LCDA)
Start Date
Date Created Raw
Updated Date
Latitude
-2.190000
Longitude
40.923400
By Anonymous (not verified) , 24 February 2026
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
Energy
Subsector Name
Petroleum/Gas Pipeline
Reference Plan
PIDA PAP 2
On SDM
Off
Summary
TBD
Description

<span [removed]: normal; font-variant-ligatures: normal; font-variant-caps: normal; font-weight: 500; letter-spacing: normal; orphans: 2; text-align: left; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px; -webkit-text-stroke-width: 0px; background-color: rgb(255, 255, 255); text-decoration-thickness: initial; text-decoration-style: initial; text-decoration-color: initial; display: inline !important; float: none;">The Lamu Crude Oil Pipeline is a proposed crude oil pipeline that will originate from South Sudan oil fields to the Lamu port and will also be used to evacuate crude oil from the oil-rich fields in South Lokichar in Kenya to Lamu Port for export. Crude oil loading to oil tankers will be made through Single Point Mooring (SPM) at Lamu Port. 200,000DWT is considered as the maximum size of the tankers. The location of the refinery has been investigated under this study. Lamu has been considered for the location. Crude oil will be transported through the crude oil pipeline, while Gasoline, Kerosene, and Diesel will be transported through the product oil pipeline (multi-product pipeline). Transportation volumes have been set through the analysis by among economists, refinery engineers and pipeline engineers based on the market and economic study.</span><br [removed]: normal; font-variant-ligatures: normal; font-variant-caps: normal; font-weight: 500; letter-spacing: normal; orphans: 2; text-align: left; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px; -webkit-text-stroke-width: 0px; background-color: rgb(255, 255, 255); text-decoration-thickness: initial; text-decoration-style: initial; text-decoration-color: initial;"><br [removed]: normal; font-variant-ligatures: normal; font-variant-caps: normal; font-weight: 500; letter-spacing: normal; orphans: 2; text-align: left; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px; -webkit-text-stroke-width: 0px; background-color: rgb(255, 255, 255); text-decoration-thickness: initial; text-decoration-style: initial; text-decoration-color: initial;"><span [removed]: normal; font-variant-ligatures: normal; font-variant-caps: normal; font-weight: 500; letter-spacing: normal; orphans: 2; text-align: left; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px; -webkit-text-stroke-width: 0px; background-color: rgb(255, 255, 255); text-decoration-thickness: initial; text-decoration-style: initial; text-decoration-color: initial; display: inline !important; float: none;">Crude oil is to be transported from the tank terminal beside the refinery to SPMs by two crude oil pipelines. The onshore portion of the pipeline route has been selected to avoid passage through the city center of Lamu, whereas, the offshore portion has been selected to run along the boundary of the port extension plan. The pipelines will run in an easterly direction through Magumba before turning South-east into Wange creak where they will be installed under the seabed to a point just North-west of Pate Island. The lines will make a turn Southwards transversing mainly a mangrove area through Tukutu, Chongoni, and Mwamba Pazah. From Mwamba Pazah the lines will be installed under the sea bed and run southwards to the two SPMs in the main channel. Crude oil stored at Lamu crude oil tank terminal will be transported through crude oil exporting pipelines of 42km length (on-land portion 11km, offshore portion 31km) to Single Point Moorings (SPM) and then to oil tankers (Max.200,000DWT) for export. The duration of loading to the tanker has been set as 30 hours, which is typical loading time in oil-exporting countries. The flow rate of loading to a 200,000DWT tanker has been set as 8,000m3/hr accordingly. The design pressure is set to be 2.0MPa as a typical pressure. As a result of the hydraulic analysis, it has been found that two lines of 48-inch diameter are required.</span><br>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Kenya, Kenya, Ethiopia, Kenya, South Sudan
Beneficiary Countries
Kenya
Stakeholders
African Union Development Agency
Email
nguena.kitio1996@gmail.com
Start Date
Date Created Raw
Updated Date
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.10.02.01
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Road
Alternative Names
LAMU Gateway Development Project
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
The project comprises the inter-regional highway network of the LAPSSET (Lamu Port South Sudan Ethiopia Transport) Corridor, which has road components connecting the Lamu Port (Kenya) through Garissa and Isiolo to Nadapal across the border in South Sudan.
Description

<p>The design for the LAPSSET higway components provide for a heavy transportation route from Lamu to South Sudan through Garissa, Isiolo, Kisima and Nginyang to meet the existing Kenya - South Sudan road at Lokichar, from where it continues to the border at Nadapal. The Lamu - Isiolo - Lokichar - Lodwar - Nadapal section measures about 1,300 km. The Northern Branch of the corridor to Addis Ababa in Ethiopia is the Isiolo- Moyale section which is also part of LAPSSET Corridor road. Construction on this section has been completed and the One Stop Border Post (OSBP) construction is currently underway.</p>

<p>The project is divided into four sections as follows:</p>

<ul>
<li>Lamu - Garissa  Road -263km</li>
<li>Garissa-Isiolo Road - 305km</li>
<li>Isiolo - Nginyang Road - 212km</li>
<li>Nginyang - Lokichar - Nadapal - 533km</li>
</ul>

<p>NB: The Government of Kenya is currently working on the re-alignment of Isiolo-Nginyang-Lokichar Section). The new aligned section takes the route: Isiolo-Lareta-Maralal-Baragoi-Lokori-Lokichar). Other sections remain the same.</p>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Kenya, Ethiopia, Kenya, South Sudan, Ethiopia, Kenya, South Sudan
Beneficiary Countries
Ethiopia, Kenya, South Sudan
REC
EAC
Stakeholders
East African Community
LAPSSET Corridor Development Authority (LCDA)
Kenya - Government of Kenya
World Bank
African Union Development Agency
African Development Bank
African Development Bank
Kenya - Government of Kenya
World Bank
Email
ephrem.hailu@giz.de
Updated Date
Latitude
-2.270000
Longitude
40.900600
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.10.02.01
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Road
Alternative Names
LAMU Gateway Development Project
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
The project comprises the inter-regional highway network of the LAPSSET (Lamu Port South Sudan Ethiopia Transport) Corridor, which has road components connecting the Lamu Port (Kenya) through Garissa and Isiolo to Nadapal across the border in South Sudan.
Description

<p>The design for the LAPSSET higway components provide for a heavy transportation route from Lamu to South Sudan through Garissa, Isiolo, Kisima and Nginyang to meet the existing Kenya - South Sudan road at Lokichar, from where it continues to the border at Nadapal. The Lamu - Isiolo - Lokichar - Lodwar - Nadapal section measures about 1,300 km. The Northern Branch of the corridor to Addis Ababa in Ethiopia is the Isiolo- Moyale section which is also part of LAPSSET Corridor road. Construction on this section has been completed and the One Stop Border Post (OSBP) construction is currently underway.</p>

<p>The project is divided into four sections as follows:</p>

<ul>
<li>Lamu - Garissa  Road -263km</li>
<li>Garissa-Isiolo Road - 305km</li>
<li>Isiolo - Nginyang Road - 212km</li>
<li>Nginyang - Lokichar - Nadapal - 533km</li>
</ul>

<p>NB: The Government of Kenya is currently working on the re-alignment of Isiolo-Nginyang-Lokichar Section). The new aligned section takes the route: Isiolo-Lareta-Maralal-Baragoi-Lokori-Lokichar). Other sections remain the same.</p>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Kenya, Ethiopia, Kenya, South Sudan, Ethiopia, Kenya, South Sudan
Beneficiary Countries
Ethiopia, Kenya, South Sudan
REC
EAC
Stakeholders
East African Community
LAPSSET Corridor Development Authority (LCDA)
Kenya - Government of Kenya
World Bank
African Union Development Agency
African Development Bank
African Development Bank
Kenya - Government of Kenya
World Bank
Email
ephrem.hailu@giz.de
Updated Date
Latitude
1.090000
Longitude
37.554000
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.21.05
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Road
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
*** DISCLAIMER: Project information was not obtained. It will be inserted when project information becomes available. *** Upgrading of 184 km road from Kuito to Luena (Angola).
Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Angola, Angola, Angola
Beneficiary Countries
Angola
REC
SADC
Stakeholders
Southern African Development Community
Angola - Instituto Nacional de Estradas
Email
ephrem.hailu@giz.de
Start Date
Date Created Raw
Updated Date
Latitude
0.000000
Longitude
0.000000
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.21.01
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Road
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Detailed study of the inter-capital connections to identify missing links for the upgrading of the 70km Kribi-Campo Bata road and bridge over the Ntem river as well as access roads between Campo Beach (Cameroon) and Rio Campo (Equitorial Guinea).
Description

<p>The project entails detailed studies and engineering designs for the construction of a bridge over the Ntem River and its access roads linking the Republics of Cameroon and Equatorial Guinea.</p>

<p>The project also includes the construction of a one-stop border post (OSBP) and the implementation of trade facilitation measures along the Transport Corridor linking Yaoundé in Cameroon, Bata in Equatorial Guinea and Libreville in Gabon.</p>

<p> </p>

Capex Cost
0.00USD million
Preparation Cost
3.94
Operation Cost
0.00
Countries
Cameroon, Equatorial Guinea, Cameroon, Equatorial Guinea, Cameroon, Equatorial Guinea
Beneficiary Countries
Cameroon, Equatorial Guinea
REC
CEEAC-ECCAS
Stakeholders
Economic Community of Central African States
Cameroon - Direction Générale des Grands Travaux: Direction des Routes
African Development Bank
Email
ephrem.hailu@giz.de
Updated Date
Latitude
0.000000
Longitude
0.000000