Active

Remote ID
1
By Anonymous (not verified) , 24 February 2026
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
Transport
Subsector Name
Airport
Reference Plan
PIDA PAP 2
On SDM
Off
Summary
<p>The development of a continentalaviation infrastructure master planincluding two components on Aviationinfrastructure and a seamless AfricanAirspace Architecture that will takeinto consideration all ongoing RECsinitiatives in airportsinfrastructure and seamless airspacemanagement is one of the key enablingpillar (Pillar 4 on Aviationinfrastructure) in theoperationalization of the SingleAfrican Air Transport Market (SAATM)that was launched in January 2018 bythe 30th Summit of AU Heads of State.</p>
Description

<p>The development of a continentalaviation infrastructure master planincluding two components on Aviationinfrastructure and a seamless AfricanAirspace Architecture that will takeinto consideration all ongoing RECsinitiatives in airportsinfrastructure and seamless airspacemanagement is one of the key enablingpillar (Pillar 4 on Aviationinfrastructure) in theoperationalization of the SingleAfrican Air Transport Market (SAATM)that was launched in January 2018 bythe 30th Summit of AU Heads of State.</p>

Capex Cost
1,200,000.00USD million
Operation Cost
0.00
Countries
Algeria, Benin, Botswana, Burkina Faso, Burundi, Cameroon, Chad, Comoros, Côte d'Ivoire
Stakeholders
African Civil Aviation Commision
African Union Commission
Start Date
Date Created Raw
Updated Date
Latitude
29.590000
Longitude
-12.843000
By Anonymous (not verified) , 24 February 2026
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
Transport
Subsector Name
Aviation
Reference Plan
PIDA PAP 2
On SDM
Off
Summary
<p>The development of a continental aviation infrastructure master plan including two components on Aviation infrastructure and a seamless African Airspace Architecture that will take into consideration all ongoing RECs initiatives in airports infrastructure and seamless airspace management is one of the key enabling pillar (Pillar 4 on Aviation infrastructure) in the operationalization of the Single African Air Transport Market (SAATM) that was launched in January 2018 by the 30th Summit of AU Heads of State. </p>
Description

<p>The development of a continental aviation infrastructure master plan including two components on Aviation infrastructure and a seamless African Airspace Architecture that will take into consideration all ongoing RECs initiatives in airports infrastructure and seamless airspace management is one of the key enabling pillar (Pillar 4 on Aviation infrastructure) in the operationalization of the Single African Air Transport Market (SAATM) that was launched in January 2018 by the 30th Summit of AU Heads of State. </p>

Preparation Cost
1,200,000.00
Countries
Algeria, Angola, Benin, Botswana, Burkina Faso, Burundi, Cabo Verde, Cameroon, Central African Republic, Chad, Comoros, Côte d'Ivoire, Democratic Republic of Congo, Djibouti, Egypt, Equatorial Guinea, Eritrea, Eswatini, Ethiopia, Gabon, Gambia, Ghana
Beneficiary Countries
Algeria, Angola, Benin, Botswana, Burkina Faso, Burundi, Cabo Verde, Cameroon, Central African Republic, Chad, Comoros, Côte d'Ivoire, Democratic Republic of Congo, Djibouti, Egypt, Equatorial Guinea, Eritrea, Eswatini, Ethiopia, Gabon, Gambia, Ghana
Stakeholders
African Civil Aviation Commision
African Union Commission
Start Date
Date Created Raw
By Anonymous (not verified) , 24 February 2026
PIDA Code
I.03.36
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
ICT
Subsector Name
Internet Exchange Point
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
The IXP project is to keep in local internet communication local. It aims at building the technical capacity of the beneficiary country in managing Internet Exchange Point and to provide, when necessary, equipment needed for the establishment of the Internet exchange point.
Description

<p>The AXIS Project aims to facilitate the development of an African internet infrastructure through policy and regulatory reform, capacity building and technical assistance. Development of an African internet infrastructure refers to the establishment of regional internet exchange points (IXPs) and internet carriers.</p>

<p>The AXIS Project is being implemented through two phases. Phase I consists of capacity building to support the establishment of national IXPs through providing a series of two workshops for stakeholders and the Internet Service Provider Association (ISPA) on  I) best practice and benefits of IXP and II) technical assistance through workshops which will cover the technical and administrative skills needed to set up, operate, and administer an IXP.</p>

<p>Phase II focuses on supporting establishment of Regional IXP and Regional Internet Carrier through provisioning Capacity building workshops on best practice and benefits of setting up RIXP/IC and providing technical assistance.</p>

<p>The AXIS Project is a flagship project of the African Regional Action Plan on Knowledge Economy (ARAPKE) endorsed by the African Union Executive Council.</p>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Democratic Republic of Congo, Democratic Republic of Congo, Democratic Republic of Congo
Beneficiary Countries
Democratic Republic of Congo
REC
CEEAC-ECCAS
Stakeholders
Economic Community of Central African States
African Union Commission
DRC - Ministry of Post
Telecommunication and ICT
Email
ephrem.hailu@giz.de
Start Date
Date Created Raw
Updated Date
Latitude
-4.470000
Longitude
15.253400
By Anonymous (not verified) , 24 February 2026
Project Status
Active
Project Stage
Feasibility
Completion Percentage
0
Sector Name
Water
Subsector Name
Multi-purpose Reservoir
Reference Plan
PIDA PAP 2
On SDM
Off
Summary
<p>The proposed Dawa dam will be located approximately 20 km upstream of Rhamu Dimtu town in Mandera County and 2km upstream of Boni centre in Ethiopia. The estimated dam height is about 90m with a capacity of approximately 4.5 Billion m3 and can be utilised to generate 8.2MW of hydropower.</p>
Description

<p>The proposed Dawa dam will be located approximately 20 km upstream of Rhamu Dimtu town in Mandera County and 2km upstream of Boni centre in Ethiopia. The estimated dam height is about 90m with a capacity of approximately 4.5 Billion m3 and can be utilised to generate 8.2MW of hydropower.</p>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Project Risk

<ul>
<li>dSocio-economic Impacts: Displacement, Loss of livelihood, Specific impacts on women, Loss of landscape/sense of place</li>
</ul>
<p> </p>

Countries
Kenya, Ethiopia, Kenya, Somalia, Ethiopia, Kenya, Somalia
Beneficiary Countries
Ethiopia, Kenya, Somalia
Stakeholders
Inter-Governmental Authority on Development (IGAD)
East African Community
Start Date
Date Created Raw
Updated Date
By Anonymous (not verified) , 24 February 2026
PIDA Code
I.02.28.02
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
ICT
Subsector Name
Fibre Optic Cable
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
*** DISCLAIMER: Project information was not obtained. It will be inserted when project information becomes available. *** Construction of Burundi section of the fibre optic link between Dar es Salaam and Bujumbura.
Countries
Burundi, Tanzania, Burundi, Tanzania, Burundi
Beneficiary Countries
Tanzania, Burundi
REC
EAC
Stakeholders
East African Community
Burundi Backbone System
Email
ephremg@nepad.org
Updated Date
Latitude
-3.050000
Longitude
29.891000
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.08.04.01
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Port
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Modernisation of Dar es Salaam Port in Tanzania (incl. berths 1 to 7, deepening, cargo handling and port layout).
Description

<p>The project involves the modernisation of the Dar es Salaam Port, including upgrade to berths 1 to 7, deepening of the harbour, improveing cargo handling and port layout.</p>

Capex Cost
214.00USD million
Preparation Cost
21.00
Operation Cost
0.00
Project Risk

<ul><li> Environmental Risks: Not Reported Social Risks: Not Reported Socio-Enviro Classification: Not Reported Other External Risks: Not Reported</li></ul>

Countries
Tanzania, Tanzania, Tanzania
Beneficiary Countries
Tanzania
REC
EAC
Stakeholders
East African Community
Tanzania Ports Authority
Port Management Association of Eastern and Southern Africa
Central Corridor Transit Transport Facilitation Agency
Email
ephrem.hailu@giz.de
Updated Date
Latitude
-6.820000
Longitude
39.269700
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.08.03.08
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Road
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Upgrading of the access roads for Dar es Salaam Port (Tanzania) through new flyover.
The project involves the construction of a grade separated flyover for Morogoro Road / Nelson Mandela intersection.
Description

<p>The project involves the construction of a grade separated flyover for Morogoro Road / Nelson Mandela intersection.</p>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Project Risk

<ul><li> Environmental Risks: Not Reported Social Risks: Not Reported Socio-Enviro Classification: Not Reported Other External Risks: Not Reported</li></ul>

Countries
Tanzania, Tanzania, Tanzania
Beneficiary Countries
Tanzania
REC
EAC
Stakeholders
East African Community
Tanzania National Roads Agency
Central Corridor Transit Transport Facilitation Agency
Email
DavidN@nepad.org
Updated Date
Latitude
-6.410000
Longitude
38.205600
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.08.04.04
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Port
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Development of new container terminal (berths 13 and 14 with dredging of access channel) at Dar es Salaam Port (Tanzania).
Description

<p>Development of new container terminal (berths 13 and 14) with dredging of the access channel at Dar es Salaam Port.</p>

Capex Cost
628.00USD million
Preparation Cost
63.00
Operation Cost
0.00
Project Risk

<ul><li> Environmental Risks: Not Reported Social Risks: Not Reported Socio-Enviro Classification: Not Reported Other External Risks: Not Reported</li></ul>

Countries
Tanzania, Tanzania, Tanzania
Beneficiary Countries
Tanzania
REC
EAC
Stakeholders
East African Community
Tanzania Ports Authority
Port Management Association of Eastern and Southern Africa
Central Corridor Transit Transport Facilitation Agency
Email
ephrem.hailu@giz.de
Updated Date
Latitude
-6.830000
Longitude
39.269900
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.08.04.03
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Port
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Construction of new berths at Dar es Salaam Port (Vijibweni, Mbwamaji and Kunduchi).
Description

<p>This project includes development of 3 new berths on the eastern side of Dar es Salaam port, linked by a bridge south of the existing dockyard and fronting the new Kigamboni city extension. The new berths will allow avoidance of access chanel limitations making it possible to handle 6th generation vessels.</p>

Capex Cost
500.00USD million
Preparation Cost
50.00
Operation Cost
0.00
Project Risk

<ul><li> Environmental Risks: Not Reported Social Risks: Not Reported Socio-Enviro Classification: Not Reported Other External Risks: Not Reported</li></ul>

Countries
Tanzania, Tanzania, Tanzania
Beneficiary Countries
Tanzania
REC
EAC
Stakeholders
East African Community
Tanzania Ports Authority
Port Management Association of Eastern and Southern Africa
Central Corridor Transit Transport Facilitation Agency
Email
ephrem.hailu@giz.de
Updated Date
Latitude
-6.830000
Longitude
39.300700
By Anonymous (not verified) , 24 February 2026
PIDA Code
I.02.29.02
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
ICT
Subsector Name
Fibre Optic Cable
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
*** DISCLAIMER: Project information was not obtained. It will be inserted when project information becomes available. *** Construction of Uganda section of the fibre optic link between Dar es Salaam and Kampala.
Countries
Uganda, Tanzania, Uganda, Tanzania, Uganda
Beneficiary Countries
Tanzania, Uganda
REC
EAC
Stakeholders
East African Community
Uganda Telecom
Email
ephremg@nepad.org
Updated Date
Latitude
-0.340000
Longitude
31.996400