Southern African Power Pool

By Anonymous (not verified) , 24 February 2026
PIDA Code
E.02.03.03
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Energy
Subsector Name
Power Interconnector
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
<p>Construction of 905 km single circuit bidirectional 330 kV transmission interconnector from Kabwe in Zambia to the Tanzanian border at Nakonde. In Zambia, the component of the ZTK: Kabwe - Pensulo, 298 km. A second 330 kV line is required in addition to the existing. Pensulo -Mpika, 197 km. A second 330 kV line is required in addition to the existing. Mpika - Kasama, 197 km. A second 330 kV line is required in addition to the existing. Kasama -Nakonde, 212 km. Two new 330 kV circuits required Nakonde ZM/TZ Border, New 14 km Double circuit 400 kV line required.</p>
Description

<p>Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project includes the section of 905km Zambian section of the 2,800km&Acirc; ZTK interconnector from Kabwe-Pensulo-Nakonde-Kasama in Zambia to Tunduma&Acirc; in Tanzania. The project was envisioned to be implemented in two phases starting with the Kabwe-Pensulo-Kasama-Nakonde&Acirc; section and the second phase would have&Acirc; comprised the Kabwe-Pensulo-Mpika-Kasama section. It will have had a capacity of&Acirc; 500MW, upgradable to 2000MW depending on power demand.</p>
<p>The original concept for the ZTK Interconnector was a high voltage 330 kV transmission line going from Pensulo (Zambia) to Nairobi (Kenya) with three connection points in Tanzania (Mbeya, Singida and Arusha). At that time, Tanzania grid was operated at 220 kV. The original concept of the ZTK Interconnector has been replaced, by two interconnections between two national grids: the Kenya-Tanzania Interconnection and the Zambia-Tanzania Interconnection.</p>

Capex Cost
162.00USD million
Preparation Cost
5.00
Operation Cost
3.24
Project Risk

<p>The major risks facing the interconnection project were identified and analysed.</p>
<p>Among these risks, special attention is warranted to the following categories of risks and to the measures to</p>
<p>mitigate them:</p>
<p>? Operational risks (in particular, the risks arising from organizational or technical reasons);</p>
<p>? Financial risks;</p>
<p>? Risks related to the environmental and social impacts;</p>
<p>While these risks and their impact are potentially serious, adequate mitigating measures, as indicated in</p>
<p>section 14, can reduce their likelihood of occurrence, diminish their impact, and ensure successful completion</p>
<p>and operation of the interconnection.</p>

Countries
Zambia, Kenya, Tanzania, Zambia, Kenya, Tanzania, Zambia
Beneficiary Countries
Kenya, Tanzania, Zambia
Stakeholders
African Union Development Agency
Common Market for Eastern and Southern Africa
Eastern Africa Power Pool
European Commission
Nile Equatorial Lakes Subsidiary Action Program
Southern African Development Community
Southern African Power Pool
World Bank
Zambia Electricity Supply Company
Zambia Office for the Promotion of Private Power Investment
Zambia - Ministry of Energy
European Commission
Start Date
Date Created Raw
Updated Date
Latitude
-11.150000
Longitude
31.547200
By Anonymous (not verified) , 24 February 2026
PIDA Code
E.02.07.03
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Energy
Subsector Name
Power Interconnector
On SDM
Off
Summary
Construction of the 76 km / 330 kV Pandamatenga to Victoria Falls section of the ZiZaBoNa transmission interconnector, i.e. Zimbabwe-Zambia-Botswana-Namibia. The construction of an interconnector aims to provide high power transmission to in order to relieve congestion on the SAPP grid supply power to the growing demand of Namibia.
Description

<p>ZiZaBoNa creates a new Western Transmission Corridor in Southern Africa, by linking the power systems of Zimbabwe, Zambia, Botswana and Namibia. This part of the project involves the construction of a 76 km / 330 kV transmission interconnector from Pandamatenga Substation (Botswana) to Victoria Falls Substation (Zimbabwe), with a transmission capacity of 300 MW.</p>

Capex Cost
18.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Zimbabwe, Botswana, Namibia, Zambia, Zimbabwe, Botswana, Namibia, Zambia, Zimbabwe
Beneficiary Countries
Botswana, Namibia, Zambia, Zimbabwe
REC
SADC
Stakeholders
South Africa - Transnet
Southern African Development Community
Southern African Power Pool
Zimbabwe - Ministry of Transport and Infrastructural Development
Zimbabwe Electricity Supply Authority
Email
egetahun@outlook.com
Start Date
Date Created Raw
Updated Date
Latitude
-18.240000
Longitude
25.727000
By Anonymous (not verified) , 24 February 2026
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Energy
Subsector Name
Power Interconnector
On SDM
Off
Summary
ZIZABona is a transmission project that will interconnect the four countries, on the Namibian side it is a 400/330 kV interconnector line
Description

<p>The name ZIZABONA was derived by taking the first two letters of the following country names: Zimbabwe, Zambia, Botswana and Namibia. It is a 400/330kV Interconnector line envisaged to establish the required infrastructure to interconnect the countries as indicated above. The project will enable the wheeling of power north south or vice versa via the Zambezi HVDC Link. The ZIZABONA project components include a direct line from Mukuni (previosuly known as Livingstone) to Zambezi together with a radial connection from Victoria Falla to Pandamatenga. </p>

<p>The project consists of the construction of the following key transmission lines;</p>

<ul>
<li>Zimbabwe (Hwange) - Zambia Livingstone (Mukuni) - 101km (Hwange to border) and 14km (border to Mukuni)</li>
<li>Zimbabwe (Victoria Falls) - Botswana (Pandamatenga) - 76km</li>
<li>Zambia (Mukuni) - Namibia (Zambezi) - 231km</li>
</ul>

<p> </p>

Capex Cost
2.40USD million
Preparation Cost
0.02
Operation Cost
0.00
Countries
Namibia, Botswana, Namibia, Zambia, Zimbabwe, Botswana, Namibia, Zambia, Zimbabwe
Beneficiary Countries
Botswana, Namibia, Zambia, Zimbabwe
REC
SADC
Stakeholders
Namibia - Ministry of Mines and Energy
Namibia Power
Southern African Development Community
Southern African Power Pool
Email
egetahun@outlook.com
Start Date
Date Created Raw
Updated Date
By Anonymous (not verified) , 24 February 2026
PIDA Code
E.02.07.02
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Energy
Subsector Name
Power Interconnector
On SDM
Off
Summary
Construction of the 231 km / 330 kV Livingstone to Katima Mulilo section of the ZiZaBoNa transmission interconnector, i.e. Zimbabwe-Zambia-Botswana-Namibia. The construction of an interconnector aims to provide high power transmission to in order to relieve congestion on the SAPP grid supply power to the growing demand of Namibia.
Description

<p>ZiZaBoNa creates a new Western Transmission Corridor in Southern Africa, by linking the power systems of Zimbabwe, Zambia, Botswana and Namibia. This part of the project involves the construction of a 231 km / 330 kV transmission interconnector from Livingstone Substation (Zambia) to Zambezi Substation at Katima (Botswana), with a transmission capacity of 300 MW. Here it joins the Caprivi HVDC link.</p>

Capex Cost
55.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Zambia, Botswana, Namibia, Zambia, Zimbabwe, Botswana, Namibia, Zambia, Zimbabwe
Beneficiary Countries
Botswana, Namibia, Zambia, Zimbabwe
REC
SADC
Stakeholders
Southern African Development Community
Southern African Power Pool
Zambia - Ministry of Energy
Zambia - Ministry of Housing and Infrastructure Development
Zambia - Ministry of Transport and Communications
Zambia Electricity Supply Company
Zambia Office for the Promotion of Private Power Investment
Zimbabwe - Ministry of Energy and Power Development
Zimbabwe Electricity Supply Authority
Email
egetahun@outlook.com
Start Date
Date Created Raw
Updated Date
Latitude
-17.650000
Longitude
25.079800
By Anonymous (not verified) , 24 February 2026
PIDA Code
E.02.07.01
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Energy
Subsector Name
Power Interconnector
On SDM
Off
Summary
Construction of 101 km / 330 kV Hwange to Victoria Falls and construction of the 14km Victoria Falls to Livingstone cross-border link of section of the ZiZaBoNa transmission interconnector, i.e. Zimbabwe-Zambia-Botswana-Namibia. The construction of an interconnector aims to provide high power transmission to in order to relieve congestion on the SAPP grid supply power to the growing demand of Namibia. The construction of an interconnector aims to provide high power transmission to in order to relieve congestion on the SAPP grid supply power to the growing demand of Namibia.
Description

<p>ZiZaBoNa creates a new Western Transmission Corridor in Southern Africa, by linking the power systems of Zimbabwe, Zambia, Botswana and Namibia. This part of the project is the first phase of the bigger ZiZaBoNa project and involves the construction of a 101 km / 330 kV transmission interconnector from Hwange Power Station to Victoria Falls Substation in Zimbabwe and construction of the 14km Victoria Falls to Livingstone cross-border link with a transmission capacity of 300 MW.</p>

Capex Cost
24.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Zimbabwe, Botswana, Namibia, Zambia, Zimbabwe, Botswana, Namibia, Zambia, Zimbabwe
Beneficiary Countries
Botswana, Namibia, Zambia, Zimbabwe
REC
SADC
Stakeholders
South Africa - Transnet
Southern African Development Community
Southern African Power Pool
Zimbabwe - Ministry of Energy and Power Development
Zimbabwe Electricity Supply Authority
Zimbabwe Electricity Supply Authority
Email
egetahun@outlook.com
Start Date
Date Created Raw
Updated Date
Latitude
-18.150000
Longitude
26.157200
By Anonymous (not verified) , 24 February 2026
PIDA Code
E.02.08.02
Project Status
Active
Project Stage
Feasibility
Completion Percentage
0
Sector Name
Energy
Subsector Name
Power Interconnector
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
<p>Construction of the Zimbabwe section of the 320 km/ 400 kV South Africa to Zimbabwe transmission interconnector which forms part of the total 935 km project across three countries, namely Mozambique, Zimbabwe and South Africa.</p>
Description

<p>The project will establish a second transmission interconnector between South Africa and Zimbabwe, enhancing the wheeling capacity of the Central Transmission Corridor by 1500 MW. The Zimbabwean section stretches from the South African border to Plumtree in the Matabeleland region of&Acirc; Zimbabwe, close to the border with Botswana.</p>
<p>The second transmissioninterconnector between South Africaand Zimbabwe will increase theZimbabwean wheeling capacity,unlocking bottlenecks for the benefitof the sub-utility companies in theregion. The project will enhance thetransfer capacity from the north tothe south, which will unlockgeneration project development inMozambique, leading to excesscapacity to enable improved trade inthe region.</p>

Capex Cost
420.00USD million
Preparation Cost
3.50
Operation Cost
0.00
Countries
Zimbabwe, South Africa, Zimbabwe, South Africa, Zimbabwe
Beneficiary Countries
South Africa, Zimbabwe
REC
SADC
Stakeholders
Southern African Development Community
Zimbabwe Electricity Supply Authority
Southern African Power Pool
Zimbabwe - Ministry of Transport and Infrastructural Development
Email
egetahun@outlook.com
Start Date
Date Created Raw
Updated Date
Latitude
-17.830000
Longitude
31.053400
By Anonymous (not verified) , 24 February 2026
PIDA Code
E.02.08.01
Project Status
Active
Project Stage
Feasibility
Completion Percentage
0
Sector Name
Energy
Subsector Name
Power Interconnector
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
<p>Construction of the South Africa section of the 320 km / 400 kV South Africa to Zimbabwe transmission interconnector. 935 km of 400 kV transmission line across three countries</p>
Description

<p>The project will establish a second transmission interconnector between South Africa and Zimbabwe, enhancing the wheeling capacity of the Central Transmission Corridor by 1500 MW. The South African section stretches from Ellisras to the Zimbabwe border.</p>

Capex Cost
240.00USD million
Preparation Cost
24.00
Operation Cost
0.00
Project Risk

<ul>
<li>Environmental Risks: Not Reported Social Risks: Not Reported Socio-Enviro Classification: Not Reported Other External Risks: Not Reported</li>
</ul>

Countries
South Africa, South Africa, Zimbabwe, South Africa, Zimbabwe
Beneficiary Countries
South Africa, Zimbabwe
REC
SADC
Stakeholders
Southern African Development Community
South African Electricity Supply Commission
Southern African Power Pool
Email
sydney@sapp.co.zw
Updated Date
Latitude
-17.830000
Longitude
31.053400
By Anonymous (not verified) , 24 February 2026
PIDA Code
E.03.01
Project Status
Active
Project Stage
Feasibility
Completion Percentage
0
Sector Name
Energy
Subsector Name
Hydro Power Plant
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
<p>Construction of 1,500 MW Mphanda Nkuwa hydro-electric dam in Mozambique.</p>
Description

<p>The project entails the construction of a hydro power station in the Tete province of Mozambique situated along the Zambezi River, 61km downstream from Cahora Bassa. Phase I of the project is estimated to provide 1,500 MW generating capacity with Phase II adding a further 900 MW of capacity. The plant is mid merit and will be able to provide both peak and off peak power. The plant is expected to be able to supply approximately 850 MW of firm power. The electricity generated is expected to be transported down the CESUL transmission line. The proje's anchor customers are expected to be EDM (10% to 20% of offtake) and a power utility of a neighbouring country.</p>

Capex Cost
2,400.00USD million
Preparation Cost
120.00
Operation Cost
0.00
Project Risk

<ul>
<li>Environmental Risks: Not Reported Social Risks: Resettlement process of appr. 400 households (2000 people). Socio-Enviro Classification: B - limited and/or reversable social and environmental impacts Other External Risks: Not Reported</li>
</ul>

Countries
Mozambique, Mozambique, Mozambique
Beneficiary Countries
Mozambique
REC
SADC
Stakeholders
Mozambique - Electricidade de Mocambique
World Bank
Southern African Development Community
Mozambique - Hidroeléctrica de Mphanda Nkuwa
Southern African Power Pool
South Africa - Transnet
Email
ephrem.hailu@giz.de
Updated Date
Latitude
31.050000
Longitude
-17.827700
By Anonymous (not verified) , 24 February 2026
PIDA Code
E.02.05.02
Project Status
Active
Project Stage
Construction
Completion Percentage
1
Sector Name
Energy
Subsector Name
Power Interconnector
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Construction of Malawi section approximately 200 km of 400 kV (initial operation at 220 kV) Mozambique-Malawi transmission interconnector, which will connect Malawi to the Southern Africa Power Pool (SAPP).
Description

<p>The project entails the construction of a 200 km, 400 kV(initially 220 kV) power line from Matambo substation, in Mozambique, to Phombeya, north of Blantyre. The first assignment will involve the design, supply and installation of the 400 kV overhead transmission line from the Mozambique-Malawi border to a new substation at Phombeya. The second assignment will entail the design, supply and installation of the new 400 kV Phombeya substation. Other assignments include extension of Matambo substation (Mozambique) and upgrading of SCADA systems (EDM).</p>

Capex Cost
0.00USD million
Preparation Cost
2.00
Operation Cost
120.00
Project Risk

<ul><li></li></ul>

Countries
Malawi, Malawi, Mozambique, Malawi, Mozambique
Beneficiary Countries
Malawi, Mozambique
REC
SADC
Stakeholders
Malawi - Electricity Supply Corporation of Malawi
Malawi - Ministry of Natural Resources
Energy and Mining
Mozambique - Electricidade de Mocambique
Southern African Development Community
Southern African Power Pool
World Bank
Email
jannis.perzlmeier@giz.de
Start Date
Date Created Raw
Updated Date
Latitude
-15.880000
Longitude
34.227900
By Anonymous (not verified) , 24 February 2026
PIDA Code
E.02.06.02
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Energy
Subsector Name
Power Interconnector
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
The Mozambique-Zambia Interconnector will consist of a high voltage transmission line from Chipata 330/132/33 kV substation to the proposed Cataxa substation in Mozambique. The transmission voltage will either be 330 kV or 400 kV. The total line length is estimated at 286 km of which 77 km is in Zambia and the rest in Mozambique.
Description

<p>Construction of a transmission line that connects Cahora Bassa Hydroelectric Power Station at Songo in Mozambique with the power system of Zambia at Serenje.</p>

Capex Cost
0.00USD million
Preparation Cost
4.60
Operation Cost
0.00
Project Risk

<ul><li> Environmental Risks: Not Reported Social Risks: Not Reported Socio-Enviro Classification: Not Reported Other External Risks: Not Reported</li></ul>

Countries
Zambia, Mozambique, Zambia, Mozambique, Zambia
Beneficiary Countries
Mozambique, Zambia
REC
SADC
Stakeholders
Mozambique - Electricidade de Mocambique
Southern African Development Community
Southern African Power Pool
Zambia - Ministry of Housing and Infrastructure Development
Zambia - Ministry of Transport and Communications
Zambia Electricity Supply Company
Zambia - Ministry of Energy
Email
egetahun@outlook.com
Start Date
Date Created Raw
Updated Date
Latitude
-14.770000
Longitude
31.970200