Economic Community of West African States

Acronym
ECOWAS-CEDEAO
Remote ID
1249
By Anonymous (not verified) , 24 February 2026
PIDA Code
I.03.26
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
ICT
Subsector Name
Internet Exchange Point
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
The IXP project is to keep in local internet communication local. It aims at building the technical capacity of the beneficiary country in managing Internet Exchange Point and to provide, when necessary, equipment needed for the establishment of the Internet exchange point.
Description

<p>The AXIS Project aims to facilitate the development of an African internet infrastructure through policy and regulatory reform, capacity building and technical assistance. Development of an African internet infrastructure refers to the establishment of regional internet exchange points (IXPs) and internet carriers.</p>

<p>The AXIS Project is being implemented through two phases. Phase I consists of capacity building to support the establishment of national IXPs through providing a series of two workshops for stakeholders and the Internet Service Provider Association (ISPA) on聽 I) best practice and benefits of IXP and II) technical assistance through workshops which will cover the technical and administrative skills needed to set up, operate, and administer an IXP.</p>

<p>Phase II focuses on supporting establishment of Regional IXP and Regional Internet Carrier through provisioning Capacity building workshops on best practice and benefits of setting up RIXP/IC and providing technical assistance.</p>

<p>The AXIS Project is a flagship project of the African Regional Action Plan on Knowledge Economy (ARAPKE) endorsed by the African Union Executive Council.聽</p>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Gambia, Gambia, Gambia
Beneficiary Countries
Gambia
REC
ECOWAS-CEDEAO
Stakeholders
Economic Community of West African States
African Union Commission
Email
ephrem.hailu@giz.de
Updated Date
Latitude
13.470000
Longitude
-16.599200
By Anonymous (not verified) , 24 February 2026
PIDA Code
I.02.18.01
Project Status
Completed
Project Stage
Construction
Completion Percentage
0
Sector Name
ICT
Subsector Name
Fibre Optic Cable
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Construction of Sierra-Leone section of the fibre optic link between Freetown, Monrovia and Abidjan.
Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Sierra Leone, C么te d'Ivoire, Libya, Sierra Leone, C么te d'Ivoire, Libya, Sierra Leone
Beneficiary Countries
C么te d'Ivoire, Libya, Sierra Leone
REC
ECOWAS-CEDEAO
Stakeholders
Economic Community of West African States
Sierra Leone Cable Limited
Email
ephrem.hailu@giz.de
Updated Date
Latitude
7.750000
Longitude
-12.292600
By Anonymous (not verified) , 24 February 2026
PIDA Code
I.02.18.02
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
ICT
Subsector Name
Fibre Optic Cable
Alternative Names
National ICT Backbone
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
The Government of Liberia considers the deployment of a national ICT and Telecommunications backbone infrastructure to connect all of its people, institutions and places.
Description

<p>The Government of Liberia"鈥檚 development goals for ICT and Telecommunications are to modernize networks and create added value through the effective utilization of ICTs that make use of different technology solutions. Through this policy agenda and recognizing the essential social and economic potentials of broadband connectivity, the Government of Liberia including its development partners and local industry players facilitated Liberia"鈥檚 connection to the global community through the ACE Communication Network. 聽</p>

<p>Liberia has since 2013 had access to broadband interconnection to the rest of the world via ACE. However, this connectivity does not extend outside the capital, Monrovia, since service providers transmission links does not have the necessary capacity required for broadband services.</p>

<p>The proposed development of a National ICT Backbone is a key initiative expected to provide the necessary connectivity infrastructure which will carry the volume of data traffic that is projected in the coming years and increase the diffusion of broadband access in order to reap the development benefits.</p>

Capex Cost
66.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Liberia, C么te d'Ivoire, Sierra Leone, C么te d'Ivoire, Liberia, Sierra Leone
Beneficiary Countries
C么te d'Ivoire, Sierra Leone
REC
ECOWAS-CEDEAO
Stakeholders
Economic Community of West African States
Liberia - Cable Consortium of Liberia
Email
jksulo@gmail.com
Updated Date
Latitude
7.050000
Longitude
-9.846370
By Anonymous (not verified) , 24 February 2026
PIDA Code
I.02.18.03
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
ICT
Subsector Name
Fibre Optic Cable
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
*** DISCLAIMER: Project information was not obtained. It will be inserted when project information becomes available. ***聽Construction of Ivory Coast section of the fibre optic link between Freetown, Monrovia and Abidjan.
Countries
C么te d'Ivoire, Sierra Leone, Libya, C么te d'Ivoire, Sierra Leone, Libya, C么te d'Ivoire
Beneficiary Countries
Sierra Leone, Libya, C么te d'Ivoire
REC
ECOWAS-CEDEAO
Stakeholders
Economic Community of West African States
Orange
Email
ephremg@nepad.org
Latitude
6.470000
Longitude
-6.167340
By Anonymous (not verified) , 24 February 2026
PIDA Code
W.02.01
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Water
Subsector Name
Multi-purpose Reservoir
Alternative Names
Niger River Basin Management Project
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
The construction of a multipurpose dam that will include the expansion of irrigation of agriculture and the supply of 90 to 100 MW of hydropower that would be connected to the West Africa Power Pool (WAPP). The project will preserve the ecosystem of the Niger River Basin, generating electricity, developing irrigated agriculture, fish farming and river transport.
Description

<p>Construction of a dam and hydroelectric plant of 90 MW on the Niandan River in Guinea with a reservoir of about 5 billion m3 of water.</p>

<p>The project has two components, namely:<br />
- Strengthen the institutional and financial capacity of the Niger Basin Authority (NBA) to sustainably fulfill its basic mandate; and<br />
- Facilitate evidence-based decision-making in the process of preparing Fomi&#39;s multipurpose dams and in parallel strengthening of ABN&#39;s capabilities through its direct involvement in this complex project.</p>

<p>The Fomi Dam initiative has been continued in two related projects:<br />
First, an APL-1 project on water resources development and sustainable ecosystem management (WRD SEM) funded by the World Bank (P093806) and secondly, the Niger River Basin Management Project. It is unclear if the APL-1 project is still active through a follow-up phase which might likely be聽named APL-2.<br />
The Niger River Basin Management Project was approved for CIWA funding in November 2014 and aims to strengthen the NBA&#39;s capacity to prepare for Fomi in two phases, namely:<br />
a) facilitate dialogue between stakeholders in Guinea, Mali and the NBA to develop a roadmap on how to proceed with the preparation of the Fomi dam project; and<br />
b) Complementary studies to the main preparatory studies supported by WRD SEM (APL-1).</p>

Capex Cost
0.00USD million
Preparation Cost
7.50
Operation Cost
0.00
Project Risk

<ul><li>Displacement of approximately 45,000 people. Encroachment of part of the wetland (Ramzar and Upper Niger National Park).</li><li>An Environmental and Social Management Plan (ESMP) and an Involuntary Resettlement Plan (IRP) are recommended to mitigate the negative impacts of the project - Environmental Category B</li></ul>

Countries
Guinea, Guinea, Guinea, Mali, Niger, Nigeria
Beneficiary Countries
Guinea
REC
ECOWAS-CEDEAO
Stakeholders
Economic Community of West African States
Guinea Ministry of Environment and Energy
Guinea - Minist猫re de l'脡nergie et de l'Hydraulique
World Bank
Global Water Partnership
Email
ephrem.hailu@giz.de
Start Date
Date Created Raw
Updated Date
Latitude
10.520000
Longitude
-9.715310
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.12.02.03
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Border Post
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Construction of Elubo/ Noe One-Stop Border Post between Cote d'Ivoire and Ghana. Elubo lies on the Ghananian side while Noe on side of Cote d'Ivoire and the border is situated on the Abidjan-Lagos Corridor.
Description

<p>Construction of Elubo/Noe One-Stop Border Post (Cote d&#39;Ivoire and Ghana). The OSBP lies on the Abidjan-Lagos Corridor. OSBP type:聽juxtaposed.</p>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
C么te d'Ivoire, Ghana, C么te d'Ivoire, Ghana, C么te d'Ivoire, Ghana
Beneficiary Countries
C么te d'Ivoire, Ghana
REC
ECOWAS-CEDEAO
Stakeholders
Economic Community of West African States
Ghana Revenue Authority
Union 脡conomique et Mon茅taire Ouest Africaine
EU-Africa Partnership on Infrastructure
Japanese International Cooperation Agency
Email
ephrem.hailu@giz.de
Updated Date
Latitude
5.290000
Longitude
-2.785160
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.13.03.02
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
Transport
Subsector Name
Road
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
*** DISCLAIMER: Project information was not obtained. It will be inserted when project information becomes available. ***聽Construction of 145 km section of single carriageway road between Dialocoto and Tambacounda on Dakar-Bamako road (Senegal).
Countries
Senegal, Senegal, Senegal
Beneficiary Countries
Senegal
REC
ECOWAS-CEDEAO
Stakeholders
Economic Community of West African States
C么te d鈥橧voire - Agence de Gestion des Routes
Email
ephremg@nepad.org
Latitude
0.000000
Longitude
0.000000
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.16.02
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
Transport
Subsector Name
Port
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
*** DISCLAIMER: Project information was not obtained. It will be inserted when project information becomes available. ***聽Upgrading of the Dakar Port (Senegal).
Countries
Senegal, Senegal, Senegal
Beneficiary Countries
Senegal
REC
ECOWAS-CEDEAO
Stakeholders
Economic Community of West African States
Senegal - Port Autonome de Dakar
Email
ephremg@nepad.org
Latitude
14.690000
Longitude
-17.446700
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.13.04.02
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Railway
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Upgrading of the Mali section of the 1,228 km railway to standard gauge between the border with Senegal and Bamako in Mali.
Description

<p>Upgrading of the Mali section of the 1,228 km railway to standard gauge between the border with Senegal and Bamako in Mali.</p>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Project Risk

<ul><li> Environmental Risks: Not Reported Social Risks: Not Reported Socio-Enviro Classification: Not Reported Other External Risks: Not Reported</li></ul>

Countries
Mali, Mali, Senegal, Mali, Senegal
Beneficiary Countries
Mali, Senegal
REC
ECOWAS-CEDEAO
Stakeholders
Economic Community of West African States
Transrail Senegal
African Union Development Agency
Email
ephrem.hailu@giz.de
Updated Date
Latitude
13.610000
Longitude
-9.888680
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.16.06
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
Transport
Subsector Name
Port
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
*** DISCLAIMER: Project information was not obtained. It will be inserted when project information becomes available. ***聽Upgrading of the Cotonou Port (Benin).
Countries
Benin, Benin, Benin
Beneficiary Countries
Benin
REC
ECOWAS-CEDEAO
Stakeholders
Economic Community of West African States
Benin - Port Autonome de Cotonou
Email
ephremg@nepad.org
Latitude
6.370000
Longitude
2.433470