European Investment Bank

By Anonymous (not verified) , 24 February 2026
PIDA Code
E.02.03.01
Project Status
Active
Project Stage
Feasibility
Completion Percentage
0
Sector Name
Energy
Subsector Name
Power Interconnector
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
<p>Construction of 670 km / 400 kV Iringa - Shinyanga section via Dodoma and Singida of the ZTK transmission interconnector on Tanzania side.</p>
Description

<p>Construction of a transmission line that connects the power networks of Zambia, Tanzania and Kenya. This project includes the section of 670km of 400kV transmission line from Iringa to Shinyanga via Dodoma and Singida.&Acirc; The&Acirc; design capacity of this section is 2000MW.</p>

Capex Cost
242.00USD million
Preparation Cost
24.00
Operation Cost
127.00
Project Risk

<ul>
<li>Environmental Risks: Minimal Social Risks: Minimal Socio-Enviro Classification: C - minimal social and environmental impacts Other External Risks: Not Reported</li>
</ul>

Countries
Tanzania, Kenya, Tanzania, Zambia, Kenya, Tanzania, Zambia
Beneficiary Countries
Kenya, Tanzania, Zambia
Stakeholders
East African Community
Tanzania Electricity Supply Company
Eastern Africa Power Pool
Southern African Development Community
African Union Development Agency
Common Market for Eastern and Southern Africa
Tanzania Ministry of Energy
World Bank
European Investment Bank
African Development Bank
Japanese International Cooperation Agency
Economic Development Cooperation Fund
African Development Bank
Economic Development Cooperation Fund
Japanese International Cooperation Agency
Email
ephrem.hailu@giz.de
Updated Date
Latitude
-6.370000
Longitude
34.888400
By Anonymous (not verified) , 24 February 2026
PIDA Code
E.12.01
Project Status
Active
Project Stage
Feasibility
Completion Percentage
0
Sector Name
Energy
Subsector Name
Hydro Power Plant
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
<p>The project involved the construction of a 147 MW Ruzizi III hydro-electric dam and distribution station between Rwanda and the Democratic Republic of Congo, on the Ruzizi river.</p>
Description

<p>A 147&Acirc; MW hydropower plant will be constructred on the Ruzizi River. It will provide electricity supply to Rwanda, Burundi and the&Acirc; DRC.&Acirc; It entails the construction of a run-of-river dam between DRC and Rwanda, downstream from the Ruzizi II hydropower dam, a 147&Acirc; MW power plant and a distribution station. Power will be transmitted to the three countries from the Kamanyola substation by 220 kV transmission lines.</p>
<p>The Ruzizi III project will significantly transform the electricity sectors in the countries concerned. Its implementation will contribute to:&Acirc; </p>
<p>(i) optimal exploitation of the Ruzizi River's energy potential to improve security of supplies and access to electricity; and</p>
<p>(ii) the strengthening of regional economic integration by creating a market for electricity.</p>

Capex Cost
614.00USD million
Preparation Cost
11.20
Operation Cost
0.00
Countries
Burundi, Democratic Republic of Congo, Rwanda, Burundi, Democratic Republic of Congo, Rwanda, Burundi, Democratic Republic of Congo, Rwanda
Beneficiary Countries
Burundi, Democratic Republic of Congo, Rwanda
REC
EAC
Stakeholders
African Development Bank
East African Community
Eastern Africa Power Pool
脡lectricit茅 des Grands Lacs
European Development Fund
European Investment Bank
KfW Development Bank
Rwanda Energy Group
World Bank
African Development Bank
European Development Fund
European Investment Bank
KfW Development Bank
World Bank
Email
egetahun@outlook.com
Start Date
Date Created Raw
Updated Date
Latitude
-1.940000
Longitude
30.087900
By Anonymous (not verified) , 15 February 2026
PIDA Code
E.08.01.04
Project Status
Active
Project Stage
Project Structuring
Completion Percentage
1
Sector Name
Energy
Subsector Name
Power Interconnector
Alternative Names
225 kV WAPP CLSG
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Construction of a 225 kV, double circuit steel lattice tower overhead transmission line of appromiximately 1,304 km, 10 new Substations (4 in Liberia, 5 in Sierra Leone, 1 in Guinea and extension of the 225 kV Man Substation in CA麓te d"鈩voire), installation of Static Var Compensators at five substations, development of WAPP Control Area Centre in Guinea and the extension of the national Control Centre in CA麓te d"鈩voire for supervision of the transmission line, setting up of a Regional SCADA System and frequency control systems.
Description

This project forms part of the  priority projects  identified in the ECOWAS Master Plan for the Generation and Transmission of Electrical Energy and shall interconnect  Sierra Leone, Liberia and Guinea to the nine already interconnected countries.

Capex Cost
549.30USD million
Preparation Cost
11.46
Operation Cost
0.00
Project Risk
  • Delay in the project implementation
  • Delay in payment of compensation to project affected persons
Countries
C么te d'Ivoire, Guinea, Liberia, Sierra Leone, C么te d'Ivoire, Guinea, Liberia, Sierra Leone
REC
ECOWAS-CEDEAO
Stakeholders
West Africa Power Pool
CLSG Regional Transmission Company
C么te d'Ivoire - Soci茅t茅 des 脡nergies de C么te d'Ivoire
Guinea - La Soci茅t茅 脡lectricit茅 de Guin茅e
Sierra Leone - Electricity Distribution and Supply Authority
Liberia Electricity Corporation
Economic Community of West African States
EU-Africa Partnership on Infrastructure
World Bank
African Development Bank
World Bank
KfW Development Bank
European Investment Bank
Email
ephrem.hailu@giz.de
Start Date
Date Created Raw
Updated Date
Latitude
8.190000
Longitude
-10.173300