Active

Remote ID
1
By Anonymous (not verified) , 24 February 2026
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
Transport
Subsector Name
Railway
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Nairobi - Malaba-Kampala - Kasese - Bihanga - Kigali -Bujumbura line and Kasese -Kisangani lines.
Capex Cost
1,229.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Kenya, Kenya, Kenya, Rwanda, Uganda
Beneficiary Countries
Kenya
REC
EAC
Stakeholders
East African Community
Kenya Railways Corporation
Email
DavidN@nepad.org
Start Date
Date Created Raw
By Anonymous (not verified) , 24 February 2026
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
Transport
Subsector Name
Railway
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Nairobi - Malaba-Kampala - Kasese - Bihanga - Kigali -Bujumbura line and Kasese -Kisangani lines.
Capex Cost
3,786.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Kenya, Kenya, Kenya, Rwanda, Uganda
Beneficiary Countries
Kenya
REC
EAC
Stakeholders
East African Community
Kenya Railways Corporation
Rwanda Transport Development Agency
Uganda Railways Corporation
Email
DavidN@nepad.org
Start Date
Date Created Raw
By Anonymous (not verified) , 24 February 2026
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
Transport
Subsector Name
Railway
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Phase 2A: Construction of the Nairobi - Naivasha SGR line (120km)
Construction to standard gauge of the Mombasa - Nairobi - Malaba-Kampala - Kasese - Bihanga - Kigali -Bujumbura line and Kasese -Kisangani lines.
Capex Cost
1,483.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Kenya, Kenya, Kenya, Rwanda, Uganda
Beneficiary Countries
Kenya
REC
EAC
Stakeholders
East African Community
Kenya Railways Corporation
Email
DavidN@nepad.org
Start Date
Date Created Raw
By Anonymous (not verified) , 24 February 2026
PIDA Code
W.01.01
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Water
Subsector Name
Multi-purpose Reservoir
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Construction of an Oubangui flow control dam to allow river navigation between Bangui and Congo and the Democratic Republic of Congo (DRC); in the Congo River Basin, and electricity production to supply Bangui and surrounding areas in the DRC and Congo.
Improve the navigability of Obangui River with an added hydropower component.
Description

<p>The project aims to provide solutions to the problems of interruption of navigation on Oubangui River, tributary of the Congo River in the region of Central Africa. This is particularly the case during periods of low water levels, and the supply of electricity to the Central African Republic (CAR), North Congo and the Congo. DRC, through the construction of a Oubangui flow control and power generation dam at the Palambo site, is about 60 km upstream from Bangui.</p>

<p>The characteristics of the scenario chosen among the solutions proposed by SOGREAH in 1990 were as follows:</p>

<ul>
<li>Normal retention rating of 361 m;</li>
<li>Height of the dam of approximately 18 m;</li>
<li>Area of 606 x106 m 2;</li>
<li>Length of approximately 1,200 m;</li>
<li>Minimum downstream flow to reach at Zinga, about 70 km downstream from Bangui of 920 m3 / s;</li>
<li>Storage volume of 2,370 million m3;</li>
<li>Power generation of 30 MW;</li>
<li>Number of groups of 4 bulbs (unit flow: 94 m3 / s).</li>
</ul>

Capex Cost
0.00USD million
Preparation Cost
3.00
Operation Cost
0.00
Project Risk

Mobilization of finances to carry out the studies of: Summary preliminary project (APS), Final preliminary project (APD), Tender dossier (DAO)

Countries
Central African Republic, Democratic Republic of Congo, Central African Republic, Democratic Republic of Congo, Central African Republic, Democratic Republic of Congo
Beneficiary Countries
Central African Republic, Democratic Republic of Congo
REC
CEEAC-ECCAS
Stakeholders
Central African Economic and Monetary Community
Economic Community of Central African States
Global Water Partnership
Lake Chad Basin Commission
Zambia - Ministry of Water Development
Sanitation and Environmental Protection
Email
christine.razanamahandry@gmail.com
Start Date
Date Created Raw
Updated Date
Latitude
4.660000
Longitude
18.918100
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.24.02.02
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Border Post
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Construction of Oujda Tlemcen One-Stop Border Post between Morocco and Algeria, which lies on the Trans-African Highway 1 Corridor.
Description

<p>Construction of Oujda Tlemcen One-Stop Border Post between Morocco and Algeria, which lies on the Trans-African Highway 1 Corridor.</p>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Algeria, Morocco, Algeria, Morocco, Algeria, Morocco
Beneficiary Countries
Algeria, Morocco
REC
UMA-AMU
Stakeholders
Arab Maghreb Union
African Development Bank
Morocco - National Company of Motorways
Email
ephrem.hailu@giz.de
Updated Date
Latitude
34.680000
Longitude
-1.920370
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.12.02.04
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Border Post
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Construction of Ouidah/Hillacondji/Sanveekondji One-Stop Border Post between Togo and Benin.
Description

<p>Construction of Ouidah/Hillacondji/Sanveekondji One-Stop Border Post between Togo and Benin. This part of the project relates specifically to the facilities in Togo.</p>

Capex Cost
17.00USD million
Preparation Cost
1.70
Operation Cost
0.00
Project Risk

<ul><li>Social Risks: Health risks due to workers staying in the community </li><li>Socio-Enviro Classification: B - limited and/or reversible social and environmental impacts</li></ul>

Countries
Togo, Benin, Togo, Benin, Togo
Beneficiary Countries
Benin, Togo
REC
ECOWAS-CEDEAO
Stakeholders
Economic Community of West African States
Organisation du Corridor Abidjan-Lagos
African Development Bank
African Development Bank
Email
ephrem.hailu@giz.de
Updated Date
Latitude
6.240000
Longitude
1.628200
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.18.03.03
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
Transport
Subsector Name
Road
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
*** DISCLAIMER: Project information was not obtained. It will be inserted when project information becomes available. *** Upgrading of Congo section of the road from Ouesso-Pokola-EnyellA©-Betou-Mongoumba-MbaA¯ki-Bangui (Congo).
Project Risk

<ul><li><p>- lack of means;</p>
<p>- environnement;</p>
<p>- peace;</p></li></ul>

Countries
Republic of Congo, Chad, Central African Republic, Republic of Congo, Chad, Central African Republic, Republic of Congo, Chad, Central African Republic
Beneficiary Countries
Republic of Congo, Chad, Central African Republic
REC
CEEAC-ECCAS
Stakeholders
Economic Community of Central African States
Email
ephremg@nepad.org
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.18.03.04
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
Transport
Subsector Name
Road
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
*** DISCLAIMER: Project information was not obtained. It will be inserted when project information becomes available. *** Upgrading of Central African Republic section of the road from Ouesso-Pokola-EnyellA©-Betou-Mongoumba-MbaA¯ki-Bangui (Republic of Congo
Project Risk

<ul><li><p>- lack of means;</p>
<p>- environnement;</p>
<p>- peace;</p></li></ul>

Countries
Central African Republic, Republic of Congo, Central African Republic, Republic of Congo, Central African Republic, Chad, Republic of Congo
Beneficiary Countries
Central African Republic, Republic of Congo
REC
CEEAC-ECCAS
Stakeholders
Economic Community of Central African States
Email
ephremg@nepad.org
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.18.03.03
Project Status
Active
Project Stage
Construction
Completion Percentage
1
Sector Name
Transport
Subsector Name
Road
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
This project entails the upgrading and modernization of roads between Congo, the Democratic Republic of Congo, the Central African Republic (CAR) and Chad in order to improve transport efficiency in the region. More specifically the upgrade and modernization of about 1400 kilometres of highway.
Description

<p>The Ouesso-Bangui-Ndjamena road is a link in the Pointe Noire-Brazzaville / Kinshasa-Bangui-Ndjamena multimodal transport corridor. The road is also part of the network of the priority program of the consensual master plan of transport in Central Africa (PDCAT). The corridor connects the capitals of Congo, the Democratic Republic of Congo, the Central African Republic (CAR) and Chad. It also provides the CAR and Chad with a second access to the sea.</p>

<p>A highway network of approximately 1310 km, which starts from Ouesso in North Congo to MbaA¯koro (near Moundou) in the South of Chad while passing through Bangui in Central African Republic. It comprises the following two sections: (i) the Ouesso-Bangui section in the equatorial forest to the South, which is about 640 km long and lies across Congo and the CAR; and (ii) the Bangui-MbaA¯koro section in the savannah woodland to the North, which is about 670 km long and lies in CAR and Chad territory;</p>

Capex Cost
1,650.00USD million
Preparation Cost
12.72
Operation Cost
221.37
Countries
Central African Republic, Chad, Republic of Congo, Central African Republic, Chad, Republic of Congo, Central African Republic, Chad, Republic of Congo
Beneficiary Countries
Central African Republic, Chad, Republic of Congo
REC
CEEAC-ECCAS
Stakeholders
Economic Community of Central African States
African Development Bank
African Development Bank
Email
ephrem.hailu@giz.de
Start Date
Date Created Raw
Updated Date
Latitude
6.870000
Longitude
16.798100
By Anonymous (not verified) , 24 February 2026
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
Transport
Subsector Name
Bridge
Reference Plan
PIDA PAP 2
On SDM
Off
Summary
<pre id="tw-target-text" class="tw-data-text tw-text-large tw-ta" dir="ltr" style="font-size: 28px; line-height: 36px; background-color: #f8f9fa; border: none; padding: 2px 0.14em 2px 0px; position: relative; margin-top: -2px; margin-bottom: -2px; resize: none; font-family: inherit; overflow: hidden; width: 270px; text-wrap: wrap; overflow-wrap: break-word; color: #1f1f1f;" data-placeholder="Translation" aria-label="Translated text" data-ved="2ahUKEwiR3N-1s-uHAxVTRkEAHaMvG1UQ3ewLegQICRAU"><span class="Y2IQFc" lang="en">The River Bridge project Oubangui between Bangui (CAR) and Zongo (DRC) is one of the 55 projects of the First Priority Program of PDCT-AC. The development project of Bridge to ensure the inter connection capitals Bangui-Kisangani-Bujumbura which constitutes a short-term objective term of the PDCT-AC to connect by road fully paved capitals Central African countries</span></pre>
Description

<pre id="tw-target-text" class="tw-data-text tw-text-large tw-ta" dir="ltr" style="font-size: 28px; line-height: 36px; background-color: #f8f9fa; border: none; padding: 2px 0.14em 2px 0px; position: relative; margin-top: -2px; margin-bottom: -2px; resize: none; font-family: inherit; overflow: hidden; width: 270px; text-wrap: wrap; overflow-wrap: break-word; color: #1f1f1f;" data-placeholder="Translation" aria-label="Translated text" data-ved="2ahUKEwiR3N-1s-uHAxVTRkEAHaMvG1UQ3ewLegQICRAU"><span class="Y2IQFc" lang="en">The bridge construction project on the Oubangui River between the cities of Bangui (CAR) and Zongo (DRC), development of the links missing in road corridors Bangui-Kisangani-Kampala & Kisangani Bujumbura, and facilitation of transport, trade and transit along the two corridors is registered in the realization (i) of the continuity of the transport chain on the Bangui-Kisangani Kampala corridor which is an important link of the trans-African route which connects Lagos to Mombasa (TAH 3), and (ii) from first short-term objective of Consensus Master Plan of Transport in Central Africa (PDCT AC) by creating the link between the capital of the Central African Republic (Bangui) and the capital of Burundi (Bujumbura).</span></pre>

Capex Cost
0.00USD million
Preparation Cost
3,492.00
Project Risk

<pre id="tw-target-text" class="tw-data-text tw-text-large tw-ta" dir="ltr" style="font-size: 28px; line-height: 36px; background-color: #f8f9fa; border: none; padding: 2px 0.14em 2px 0px; position: relative; margin-top: -2px; margin-bottom: -2px; resize: none; font-family: inherit; overflow: hidden; width: 270px; text-wrap: wrap; overflow-wrap: break-word; color: #1f1f1f;" data-placeholder="Translation" aria-label="Translated text" data-ved="2ahUKEwiR3N-1s-uHAxVTRkEAHaMvG1UQ3ewLegQICRAU"><span class="Y2IQFc" lang="en">Insufficient resources financial to ensure the completion of all studies planned (APS, APD, DAO, others)</span></pre>

Countries
Burundi, Central African Republic, Democratic Republic of Congo, Uganda
Beneficiary Countries
Central African Republic, Democratic Republic of Congo, Uganda
Stakeholders
DRC - Agence pour le Developement et la Promotion du projet Grand Inga
Start Date
Date Created Raw
Latitude
1.330000
Longitude
27.795300