Active

Remote ID
1
By Anonymous (not verified) , 24 February 2026
PIDA Code
E.03.01
Project Status
Active
Project Stage
Feasibility
Completion Percentage
0
Sector Name
Energy
Subsector Name
Hydro Power Plant
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
<p>Construction of 1,500 MW Mphanda Nkuwa hydro-electric dam in Mozambique.</p>
Description

<p>The project entails the construction of a hydro power station in the Tete province of Mozambique situated along the Zambezi River, 61km downstream from Cahora Bassa. Phase I of the project is estimated to provide 1,500 MW generating capacity with Phase II adding a further 900 MW of capacity. The plant is mid merit and will be able to provide both peak and off peak power. The plant is expected to be able to supply approximately 850 MW of firm power. The electricity generated is expected to be transported down the CESUL transmission line. The proje's anchor customers are expected to be EDM (10% to 20% of offtake) and a power utility of a neighbouring country.</p>

Capex Cost
2,400.00USD million
Preparation Cost
120.00
Operation Cost
0.00
Project Risk

<ul>
<li>Environmental Risks: Not Reported Social Risks: Resettlement process of appr. 400 households (2000 people). Socio-Enviro Classification: B - limited and/or reversable social and environmental impacts Other External Risks: Not Reported</li>
</ul>

Countries
Mozambique, Mozambique, Mozambique
Beneficiary Countries
Mozambique
REC
SADC
Stakeholders
Mozambique - Electricidade de Mocambique
World Bank
Southern African Development Community
Mozambique - Hidroeléctrica de Mphanda Nkuwa
Southern African Power Pool
South Africa - Transnet
Email
ephrem.hailu@giz.de
Updated Date
Latitude
31.050000
Longitude
-17.827700
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.08.03.11
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Road
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Upgrading of 252 km of single carriageway from Mpanda to Kanazi (Tanzania).
Description

<p>Upgrading of 252 km of single carriageway from Mpanda to Kanazi (Tanzania).</p>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Tanzania, Tanzania, Tanzania
Beneficiary Countries
Tanzania
REC
EAC
Stakeholders
East African Community
Tanzania National Roads Agency
Central Corridor Transit Transport Facilitation Agency
Email
ephrem.hailu@giz.de
Updated Date
Latitude
0.000000
Longitude
0.000000
By Anonymous (not verified) , 24 February 2026
PIDA Code
E.02.05.01
Project Status
Active
Project Stage
Feasibility
Completion Percentage
0
Sector Name
Energy
Subsector Name
Power Interconnector
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
<p>Construction of Mozambique section approximately 218 km of the 400 kV Mozambique-Malawi transmission interconnector.</p>
Description

<p>The project entails the construction of a 218&Acirc; km, being 142 km at Mozambique side and 76 km at Malawi side,&Acirc; 400 kV (initially to be operated at&Acirc; 220 kV) power line from Matambo substation, in Mozambique, to Phombeya, north of Malawi's commercial capital, Blantyre. The first assignment will involve the design, supply and installation of the 400 kV overhead transmission line from the Mozambique-Malawi border to Phombeya substation including construction of the landing bay at 400kV Phombeya substation related to the Malawian side. The second&Acirc; assignments include extension/ upgrading of Matambo substation form 220 kV to 400 kV&Acirc; and upgrading of SCADA systems (EDM) related to Mozambique side.</p>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Project Risk

<ul>
<li>Environmental Risks: Not Reported Social Risks: Not Reported Socio-Enviro Classification: Not Reported Other External Risks: Not Reported</li>
</ul>

Countries
Mozambique, Malawi, Mozambique, Malawi, Mozambique
Beneficiary Countries
Malawi, Mozambique
REC
SADC
Stakeholders
Southern African Development Community
Mozambique - Electricidade de Mocambique
Malawi - Electricity Supply Corporation of Malawi
Email
ephrem.hailu@giz.de
Start Date
Date Created Raw
Updated Date
Latitude
31.050000
Longitude
-17.827700
By Anonymous (not verified) , 24 February 2026
PIDA Code
E.02.05.02
Project Status
Active
Project Stage
Construction
Completion Percentage
1
Sector Name
Energy
Subsector Name
Power Interconnector
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Construction of Malawi section approximately 200 km of 400 kV (initial operation at 220 kV) Mozambique-Malawi transmission interconnector, which will connect Malawi to the Southern Africa Power Pool (SAPP).
Description

<p>The project entails the construction of a 200 km, 400 kV(initially 220 kV) power line from Matambo substation, in Mozambique, to Phombeya, north of Blantyre. The first assignment will involve the design, supply and installation of the 400 kV overhead transmission line from the Mozambique-Malawi border to a new substation at Phombeya. The second assignment will entail the design, supply and installation of the new 400 kV Phombeya substation. Other assignments include extension of Matambo substation (Mozambique) and upgrading of SCADA systems (EDM).</p>

Capex Cost
0.00USD million
Preparation Cost
2.00
Operation Cost
120.00
Project Risk

<ul><li></li></ul>

Countries
Malawi, Malawi, Mozambique, Malawi, Mozambique
Beneficiary Countries
Malawi, Mozambique
REC
SADC
Stakeholders
Malawi - Electricity Supply Corporation of Malawi
Malawi - Ministry of Natural Resources
Energy and Mining
Mozambique - Electricidade de Mocambique
Southern African Development Community
Southern African Power Pool
World Bank
Email
jannis.perzlmeier@giz.de
Start Date
Date Created Raw
Updated Date
Latitude
-15.880000
Longitude
34.227900
By Anonymous (not verified) , 24 February 2026
PIDA Code
E.02.06.02
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Energy
Subsector Name
Power Interconnector
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
The Mozambique-Zambia Interconnector will consist of a high voltage transmission line from Chipata 330/132/33 kV substation to the proposed Cataxa substation in Mozambique. The transmission voltage will either be 330 kV or 400 kV. The total line length is estimated at 286 km of which 77 km is in Zambia and the rest in Mozambique.
Description

<p>Construction of a transmission line that connects Cahora Bassa Hydroelectric Power Station at Songo in Mozambique with the power system of Zambia at Serenje.</p>

Capex Cost
0.00USD million
Preparation Cost
4.60
Operation Cost
0.00
Project Risk

<ul><li> Environmental Risks: Not Reported Social Risks: Not Reported Socio-Enviro Classification: Not Reported Other External Risks: Not Reported</li></ul>

Countries
Zambia, Mozambique, Zambia, Mozambique, Zambia
Beneficiary Countries
Mozambique, Zambia
REC
SADC
Stakeholders
Mozambique - Electricidade de Mocambique
Southern African Development Community
Southern African Power Pool
Zambia - Ministry of Housing and Infrastructure Development
Zambia - Ministry of Transport and Communications
Zambia Electricity Supply Company
Zambia - Ministry of Energy
Email
egetahun@outlook.com
Start Date
Date Created Raw
Updated Date
Latitude
-14.770000
Longitude
31.970200
By Anonymous (not verified) , 24 February 2026
PIDA Code
E.02.06.01
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Energy
Subsector Name
Power Interconnector
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
<p>The Mozambique-Zambia Interconnector will consist of a high voltage transmission line from Chipata 330/132/33 kV substation to the proposed Cataxa substation in Mozambique. The transmission voltage will either be 330 kV or 400 kV. The total line length is estimated at 286 km of which 77 km is in Zambia and the rest in Mozambique.</p>
Description

<p>Construction of a transmission line that connects Cahora Bassa Hydroelectric Power Station at Songo in Mozambique with the power system of Zambia at Serenje.</p>

Capex Cost
0.00USD million
Preparation Cost
12.00
Operation Cost
0.00
Project Risk

<ul>
<li>Environmental Risks: Not Reported Social Risks: Not Reported Socio-Enviro Classification: Not Reported Other External Risks: Not Reported</li>
</ul>

Countries
Mozambique, Mozambique, Zambia, Mozambique, Zambia
Beneficiary Countries
Mozambique, Zambia
REC
SADC
Stakeholders
Southern African Development Community
Mozambique - Electricidade de Mocambique
Southern African Power Pool
Zambia Electricity Supply Company
Email
ephrem.hailu@giz.de
Start Date
Date Created Raw
Updated Date
Latitude
-17.830000
Longitude
31.053400
By Anonymous (not verified) , 24 February 2026
PIDA Code
I.03.17
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
ICT
Subsector Name
Internet Exchange Point
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
The IXP project is to keep in local internet communication local. It aims at building the technical capacity of the beneficiary country in managing Internet Exchange Point and to provide, when necessary, equipment needed for the establishment of the Internet exchange point.
Description

<p>The AXIS Project aims to facilitate the development of an African internet infrastructure through policy and regulatory reform, capacity building and technical assistance. Development of an African internet infrastructure refers to the establishment of regional internet exchange points (IXPs) and internet carriers.</p>

<p>The AXIS Project aims to facilitate the development of an African internet infrastructure through policy and regulatory reform, capacity building and technical assistance. Development of an African internet infrastructure refers to the establishment of regional internet exchange points (IXPs) and internet carriers.</p>

<p>The AXIS Project is being implemented through two phases. Phase I consists of capacity building to support the establishment of national IXPs through providing a series of two workshops for stakeholders and the Internet Service Provider Association (ISPA) on  I) best practice and benefits of IXP and II) technical assistance through workshops which will cover the technical and administrative skills needed to set up, operate, and administer an IXP.</p>

<p>Phase II focuses on supporting establishment of Regional IXP and Regional Internet Carrier through provisioning Capacity building workshops on best practice and benefits of setting up RIXP/IC and providing technical assistance.</p>

<p>The AXIS Project is a flagship project of the African Regional Action Plan on Knowledge Economy (ARAPKE) endorsed by the African Union Executive Council. </p>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Morocco, Morocco, Morocco
Beneficiary Countries
Morocco
REC
UMA-AMU
Stakeholders
Arab Maghreb Union
Morocco - Ministere de la Communication
African Union Commission
Email
birazag@africa-union.org
Updated Date
Latitude
33.990000
Longitude
-6.852130
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.05.03.02
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Road
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Implementation of road toll from Mombasa to Nairobi on the Northern Corridor.
Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Kenya, Kenya, Kenya
Beneficiary Countries
Kenya
REC
EAC
Stakeholders
East African Community
Kenya National Highways Authority
Northern Corridor Transit Transport Coordination Authority
Email
ephrem.hailu@giz.de
Updated Date
Latitude
-2.650000
Longitude
38.222400
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.05.03.04
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Road
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Upgrading of 25 km of the Mombasa Southern Bypass (Kenya)
Description

<p>The project will involve the upgrading of 25 km of the Mombasa Southern Bypass in Kenya.</p>

Capex Cost
39.00USD million
Preparation Cost
4.00
Operation Cost
0.00
Project Risk

<ul><li> Environmental Risks: Not Reported Social Risks: Not Reported Socio-Enviro Classification: Not Reported Other External Risks: Not Reported</li></ul>

Countries
Kenya, Kenya, Kenya
Beneficiary Countries
Kenya
REC
EAC
Stakeholders
East African Community
Kenya National Highways Authority
Northern Corridor Transit Transport Coordination Authority
Japanese International Cooperation Agency
Japanese International Cooperation Agency
Email
ephrem.hailu@giz.de
Updated Date
Latitude
-4.040000
Longitude
39.668900
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.05.06.02
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Port
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Construction of new petroleum facilities at Mombassa Port (Kenya)
Description

<p>The project is designed to meet the need for additional liquid bulk capacity through design of a BOT project for a single buoy point or off shore jetty system.</p>

Capex Cost
56.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Kenya, Kenya, Kenya
Beneficiary Countries
Kenya
REC
EAC
Stakeholders
East African Community
Kenya Ports Authority
Northern Corridor Transit Transport Coordination Authority
Email
ephremg@nepad.org
Updated Date
Latitude
-4.040000
Longitude
39.668200