*** DISCLAIMER: Project information was not obtained. It will be inserted when project information becomes available. ***Â Development of joint standards for modern road corridor design (with PPP) (including Trade and Transport Facilitation) on North-South
Joint design standards for modern rail transport corridor infrastructure (with PPP) (including Trade and Transport Facilitation) on the Djibouti Corridor.
Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Stakeholders
Inter-Governmental Authority on Development (IGAD)
Inter-Governmental Authority on Development (IGAD)
*** DISCLAIMER: Project information was not obtained. It will be inserted when project information becomes available. ***Â Development of joint standards for modern road corridor design (with PPP) (including Trade and Transport Facilitation) on Dakar-Bamak
*** DISCLAIMER: Project information was not obtained. It will be inserted when project information becomes available. ***Â Development of joint standards for modern road corridor design (with PPP) (including Trade and Transport Facilitation) for Central Co
Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
REC
EAC
Stakeholders
East African Community
Central Corridor Transit Transport Facilitation Agency
Central Corridor Transit Transport Facilitation Agency
*** DISCLAIMER: Project information was not obtained. It will be inserted when project information becomes available. ***Â Joint standards for modern corridor river transport infrastructure design (with PPP) (including Trade and Transport Facilitation) in
Construction of the Iullemeden Aquifer System (IAS) which is located in Mali, Niger and Nigeria, with minor areas in Algeria and Benin and covers a region of approximately 525 000 km2. The Iullemeden Basin represents a reservoir of good-quality water which requires proper management.
Description
<p>The IAS faces multiple constraints; in particular difficulties of access to water resources related to the excessive depth (over 600 m) in some regions. Moreover, the lack of sub-regional strategic water resources management has led to changes in aquifer hydro-dynamics and water quality degradation. It constitutes the main perennial resource of potable water and a strategic resource for the sustainable development of the concerned countries. </p>
Capex Cost
9.20USD million
Preparation Cost
0.00
Operation Cost
0.00
Project Risk
<ul><li>Environmental risk: Reduction of groundwater, degradation in groundwater resources, o Impacts of climate change and variability</li></ul>