Active

Remote ID
1
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.05.03.09
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Road
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Upgrading of the road from Eldoret to Kitale (Kenya).
Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Kenya, Kenya, Kenya
Beneficiary Countries
Kenya
REC
EAC
Stakeholders
East African Community
Kenya National Highways Authority
Northern Corridor Transit Transport Coordination Authority
Email
ephremg@nepad.org
Updated Date
Latitude
0.000000
Longitude
0.000000
By Anonymous (not verified) , 24 February 2026
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
Transport
Subsector Name
Road
Reference Plan
PIDA PAP 2
On SDM
Off
Summary
<p>New construction of 328 km road from El Fasher (Sudan) to El Geneina (Sudan) and upgrading of 21km road from El Geneina to Adri on Chad border.</p>
Description

<p>New construction of 328 km from El Fasher (Sudan) to El Geneina (Sudan) and upgrading of 21km from El Geneina to Adri on Chad border promoting transit-Trade between the countries of the region.</p>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Sudan, Chad
Stakeholders
Sudan - Government of Sudan
Inter-Governmental Authority on Development (IGAD)
Common Market for Eastern and Southern Africa
Communauté des États sahélo-sahariens
Start Date
Date Created Raw
Latitude
13.450000
Longitude
22.468200
By Anonymous (not verified) , 24 February 2026
PIDA Code
I.03.37
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
ICT
Subsector Name
Internet Exchange Point
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
The IXP project is to keep in local internet communication local. It aims at building the technical capacity of the beneficiary country in managing Internet Exchange Point and to provide, when necessary, equipment needed for the establishment of the Internet exchange point.
Description

<p>The AXIS Project aims to facilitate the development of an African internet infrastructure through policy and regulatory reform, capacity building and technical assistance. Development of an African internet infrastructure refers to the establishment of regional internet exchange points (IXPs) and internet carriers.</p>

<p>The AXIS Project is being implemented through two phases. Phase I consists of capacity building to support the establishment of national IXPs through providing a series of two workshops for stakeholders and the Internet Service Provider Association (ISPA) on  I) best practice and benefits of IXP and II) technical assistance through workshops which will cover the technical and administrative skills needed to set up, operate, and administer an IXP.</p>

<p>Phase II focuses on supporting establishment of Regional IXP and Regional Internet Carrier through provisioning Capacity building workshops on best practice and benefits of setting up RIXP/IC and providing technical assistance.</p>

<p>The AXIS Project is a flagship project of the African Regional Action Plan on Knowledge Economy (ARAPKE) endorsed by the African Union Executive Council</p>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Egypt, Egypt, Egypt
Beneficiary Countries
Egypt
REC
COMESA
Stakeholders
Common Market for Eastern and Southern Africa
Egyptian Ministry of Communications and Information Technology
African Union Commission
Email
traorey@africa-union.org
Updated Date
Latitude
30.250000
Longitude
31.205600
By Anonymous (not verified) , 24 February 2026
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
Energy
Subsector Name
Hydro Power Plant
Reference Plan
PIDA PAP 2
On SDM
Off
Summary
TBD
Description

<span [removed]: normal; font-variant-ligatures: normal; font-variant-caps: normal; font-weight: 500; letter-spacing: normal; orphans: 2; text-align: left; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px; -webkit-text-stroke-width: 0px; background-color: rgb(255, 255, 255); text-decoration-thickness: initial; text-decoration-style: initial; text-decoration-color: initial; display: inline !important; float: none;">It is suggested that the first stage of the track to be Egypt - Sudan electrical grid with a path of length of about 2200 km from Cairo (Egypt) to Khartoum and Gedaref (Sudan) parallel to the continental road by establishing two circuits with a HVDC of 1000 kV (or a mixture of alternating current (AC) and direct current (DC) solutions of 800 kV, according to the results of technical and economic feasibility studies).</span><br>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Egypt, Egypt, Egypt, Sudan
Beneficiary Countries
Egypt
Stakeholders
African Union Development Agency
Email
nguena.kitio1996@gmail.com
Start Date
Date Created Raw
Updated Date
By Anonymous (not verified) , 24 February 2026
PIDA Code
E.02.01.02
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Energy
Subsector Name
Power Interconnector
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Implementation of Sudan section of the Egypt - Sudan transmission interconnection line and the associated high voltage Substation or Converter station based on the conclusions of the final feasibility study expected to be conducted in the near future. A 500kV interconnection line will connect the two countries.
Description

<p>Construction of a 500kV high voltage transmission line and associated Substation or Converter station that connects the power networks of Egypt and Sudan to facilitate trading in electricity and promote power systems stability. The project comprises the update of project studies.</p>

Capex Cost
120.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Sudan, Egypt, Sudan, Egypt, Sudan
Beneficiary Countries
Egypt, Sudan
REC
COMESA
Stakeholders
Common Market for Eastern and Southern Africa
Sudan Ministry of Water Resources
Irrigation and Electricity
Nile Basin Initiative
Comité Maghrébin de l'Électricité
Email
ephremg@nepad.org
Updated Date
Latitude
20.080000
Longitude
31.030500
By Anonymous (not verified) , 24 February 2026
PIDA Code
E.02.01.01
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Energy
Subsector Name
Power Interconnector
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
This is a 220 kV, AC - Double circuit interconnection line and is100 km long on the Egyptian side and about 70km on the Sudanese side. The construction of the line is already completed and the parties are negotiating the agreements between Egypt and Sudan for power trading. The project is divided into two phases as follows: (i) In the 1st phase: 50 MW will be transmitted through the line from Egypt to Sudan (ii) In the 2nd phase: the transmission capacity will reach 300 MW after installing STATCOM devices on the Sudanese side and it is expected to be finalized by the mid of 2021
Description

Construction of a 500kV high voltage transmission line and associated Substation or Converter station that connects the power networks of Egypt and Sudan to facilitate trading in electricity and promote power systems stability. The project comprises the update of project studies.

Capex Cost
568.00USD million
Preparation Cost
61.00
Operation Cost
0.00
Countries
Egypt, Egypt, Sudan, Egypt, Sudan
Beneficiary Countries
Egypt, Sudan
REC
COMESA
Stakeholders
Comité Maghrébin de l'Électricité
Common Market for Eastern and Southern Africa
Egyptian Electricity Holding Company
Nile Basin Initiative
Email
nileman.azza@gmail.com
Start Date
Date Created Raw
Updated Date
Latitude
23.060000
Longitude
32.237500
By Anonymous (not verified) , 24 February 2026
PIDA Code
E.09.03.02
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Energy
Subsector Name
Power Interconnector
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Reinforcement of the Libya part of the 340 km / 500 kV Egypt to Libya section of the ELTAM transmission interconnector.
Description

<p>This project forms part of the ELTAM transmission interconnector which connects the power markets of Egypt, Libya, Tunisia, Algeria and Mali. In particular, it involves the reinforcement of the Libya part of the 340 km / 500 kV Egypt to Libya section from the Egypt border to Tobruk.</p>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Project Risk

<ul><li> Environmental Risks: Not Reported Social Risks: Not Reported Socio-Enviro Classification: Not Reported Other External Risks: Not Reported</li></ul>

Countries
Libya, Egypt, Libya, Egypt, Libya
Beneficiary Countries
Egypt, Libya
REC
UMA-AMU
Stakeholders
Arab Maghreb Union
Comité Maghrébin de l'Électricité
African Union Development Agency
Email
ephrem.hailu@giz.de
Updated Date
Latitude
31.830000
Longitude
24.512800
By Anonymous (not verified) , 24 February 2026
PIDA Code
E.09.03.01
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Energy
Subsector Name
Power Interconnector
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Reinforcement of the Egypt part of the 340 km / 500 kV Egypt to Libya section of the ELTAM transmission interconnector.
Description

This project forms part of the ELTAM transmission interconnector which connects the power markets of Egypt, Libya, Tunisia, Algeria and Mali. In particular, it involves the reinforcement of the Egypt part of the 340 km / 500 kV Egypt to Libya section from the Mersa Matruh to the Libya border.

Capex Cost
250.00USD million
Preparation Cost
27.00
Project Risk

<ul><li> Environmental Risks: Not Reported Social Risks: Not Reported Socio-Enviro Classification: Not Reported Other External Risks: Not Reported</li></ul>

Countries
Egypt, Egypt, Libya, Egypt, Libya
Beneficiary Countries
Egypt, Libya
REC
UMA-AMU
Stakeholders
Arab Maghreb Union
Libya - General Electricity Company of Libya
Comité Maghrébin de l'Électricité
Email
ephremg@nepad.org
Updated Date
Latitude
31.470000
Longitude
26.157600
By Anonymous (not verified) , 24 February 2026
PIDA Code
T.04.02
Project Status
Active
Project Stage
Construction
Completion Percentage
0
Sector Name
Transport
Subsector Name
Road
Reference Plan
PIDA PAP 1
On SDM
Off
Summary
Design and implement efficiency monitoring system
Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Stakeholders
African Union Commission
Email
egetahun@outlook.com
Start Date
Date Created Raw
Updated Date
Latitude
0.000000
Longitude
0.000000
By Anonymous (not verified) , 24 February 2026
Project Status
Active
Project Stage
Project Definition
Completion Percentage
0
Sector Name
Energy
Subsector Name
Hydro Power Plant
Reference Plan
PIDA PAP 2
On SDM
Off
Summary
TBD
Description

<span [removed]: normal; font-variant-ligatures: normal; font-variant-caps: normal; font-weight: 500; letter-spacing: normal; orphans: 2; text-align: left; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px; -webkit-text-stroke-width: 0px; background-color: rgb(255, 255, 255); text-decoration-thickness: initial; text-decoration-style: initial; text-decoration-color: initial; display: inline !important; float: none;">The Guba (Ethiopia)-Khartoum project is one of the proposed cross boarder interconnection lines between five countries in the horn of Africa under the them 'Eastern Africa Green Power Transmission Network Project'. The countries involved include-Ethiopia,Djibouti Eritrea, Sudan, South Sudan, and Somalia. This will form a large regional transmission network which would be part of the Eastern African Power Pool. The project enables the countries in context to be supplied with green power at a reasonable price.</span><br>

Capex Cost
0.00USD million
Preparation Cost
0.00
Operation Cost
0.00
Countries
Ethiopia, Sudan, Ethiopia, Sudan, Burundi, Democratic Republic of Congo, Egypt, Kenya, Rwanda, Tanzania, Uganda
Beneficiary Countries
Ethiopia, Sudan
Stakeholders
African Union Development Agency
Email
nguena.kitio1996@gmail.com
Start Date
Date Created Raw
Updated Date